The invention relates to a method for reinforcing an existing municipal
pipe gallery within a deep foundation pit excavation range, and is particularly applied to the condition of excavating a large-sized foundation pit when a municipal
pipe gallery exists in a thick alluvial formation. The method comprises the following steps: constructing ordinary precast piles and
pipe gallery reinforcement precast piles, wherein reserved connection devices are arranged on the pipe gallery reinforcement precast piles; excavating a foundation pit soil body from top to bottom until the reserved connection devices on the
pile bodies are exposed; simultaneously pouring a pipe gallery support structure taking a
soil model as a template below the pipe gallery and beams on two sides of the pipe gallery by taking the reserved connection devices of the pipe gallery reinforcement precast piles as support points; constructing anchor ropes, wherein one end of each anchor
rope is anchored onto the corresponding beam, and the other end of each anchor
rope is connected with a top beam on the corresponding pipe gallery reinforcement precast
pile; continuing excavating the residual foundation pit soil body to a baseline of the foundation pit, constructing air duct structures, and integrally pouring
waist beams of the foundation pit and air duct top plates to finish the construction. According to the method, the stability of the soil body around air ducts during the excavation of the air ducts is ensured, and the influence of excavation of the soil body on the lower part on the pipe gallery is reduced, and the pipe gallery is supported in advance.