An
electricity-gas interconnected comprehensive
energy system optimization scheduling method containing P2G wind curtailment start and stop comprises the steps of: constructing an optimization scheduling model, wherein target functions of the optimization scheduling model comprise a
unit operation cost
minimum function, a wind curtailment penalty function and a carbon emission weight function; constructing constraint conditions of the
optimal scheduling model, including power network constraints and
natural gas network constraints, the power network constraints including
electric power balanceconstraints, generator set power constraints, P2G power constraints, node
voltage constraints, balance node
phase angle constraints and line power constraints, wherein the
natural gas network constraints include gas source point constraints, pipeline flow constraints,
pipe storage constraints, gas
storage tank capacity constraints, compressor flow constraints and node
energy balance. P2G wind curtailment start and stop constraint: enabling the input power of P2G equipment to be all from wind curtailment power in the
system operation process; and when the
system has no wind curtailment, the P2G equipment is in a
closed state. According to the method, the carbon emission can be effectively reduced, and the
unit operation cost is reduced; and meanwhile, the established model has more practical benefits.