Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

4824results about "Roadways" patented technology

Transportation system

An exemplary embodiment a substrate transport system is provided. The system has a guideway and at least one transport vehicle. The transport vehicle is adapted for holding at least one substrate and capable of being supported from and moving along the guideway. The guideway comprises at least one travel lane for the vehicle and at least one access lane offset from the travel lane allowing the vehicle selectable access on and off the travel lane.
Owner:BOOKS AUTOMATION US LLC

Road sheltering and optimization

A structure for sheltering and optimizing highway systems includes an arcuate structure extending over a highway and a cover over the structure to create an enclosure. The enclosure protects the highway and users of the highway from rain, snow and sun while the surrounding scenery remains visible to drivers. A number of different additions optimize use of the highway. For example, a plurality of solar panels are layered on the cover and wind turbines are used to create usable energy, an air current generation system reduces wind resistance on vehicles to increase gas mileage, and an elevated rail system transports many persons great distances along the highway.
Owner:RACZKOWSKI RAYMOND

Ballast and process for the production of ballast

The present invention relates to ballast which have a high stability and a long service life and to a process for the production of ballast. These ballast are suitable for railway track laying and road construction and dike systems used for example in costal protection. These ballast comprise ballast stones and polyurethane foams based on a reaction mixture of selected polyisocyanates and selected compounds with isocyanate-reactive groups.
Owner:COVESTRO DEUTSCHLAND AG

Unsymmetrical space-time optimizing control method for rotary intersection

The invention relates to a method for optimizing and controlling the dissymmetrical space time of a roundabout; each inlet of the roundabout is provided with two sets of signal lamps which assign wayleaves to loop vehicles and intra-annular vehicles in turn in order that the vehicles pass through an annular-island interleaving section alternately according to a signal lamp control proposal. According to the condition of annular-island flow rate, the traffic signal time of a left-hand traffic flow is determined with the largest parking number as a constraint condition; in addition, the starting and the intermitting time of a traffic signal in a transverse and intersectant inlet road takes the safety of the traffic flow and the need of the largest traffic into account, actualizes flexible control measures and best coordinates and utilizes the space-time resource of the roundabout. According to the dynamic change of the traffic flow, the optimal control is carried out. The method for optimizing and controlling the dissymmetrical space time of the roundabout can effectively relieve the conditions of congestion and deadlock in the intersectant roundabout, improve the safety of the roundabout and is easy for practical application.
Owner:TONGJI UNIV

Urban intelligent traffic and transportation system and running method thereof

ActiveCN102708681AMaximize the efficiency of the transportation systemSolve traffic jamsRoadwaysRoad vehicles traffic controlTraffic congestionRoad surface
The invention relates to an urban intelligent traffic and transportation system, which comprises a full-interchange totally enclosed light elevated road passage, unmanned electric intelligent trolleys, nodal stations, an intelligent dispatching system, a solar power generating system and a logistic service system, wherein power supply rails are laid on a road surface of the passage; positioning bar codes and navigational lines are laid on the top surface in the passage and the road surface of the passage; and solar power generating plates are laid at a passage top. Passengers swipe cards at nearby nodal stations and select destinations, and the intelligent trolleys generate the best driving paths according to the destinations and the dispatching information and automatically run with the help of the locating bar codes and the navigational lines, so as to directly send the passengers to the destinations. The urban intelligent traffic and transportation system aims to solve the problems of urban traffic congestion, low efficiency, serious pollution, high traffic cost, low safety factor and the like, and has the characteristics of full interchange, full throughway, intelligent driving function, intelligent dispatching function, rapidity, high efficiency, environmental friendliness, conservation, convenience, safety and the like.
Owner:吴新赞

Novel highway embankment widened structure and construction method

The invention relates to a novel highway embankment widened structure. The original roadbed slope of the structure is trimmed into a step shape, a high pressure jet grouting pile is disposed below an original roadbed slope cushion layer, pressurized continuous grouting is employed at an original roadbed cushion layer to form a slurry solid bearing plate, parts of pore cavities of the original roadbed are recharged with fine aggregate concrete or mortar; foundation treatment piles are employed to reinforce the foundation of a widened area, a drainage cushion layer is laid throughout the top of the foundation treatment piles; an earthwork cloth is laid on the drainage cushion layer, a cement soil plate is disposed on the earthwork cloth, high strength reinforcing mesh sheets are disposed in the cement soil plate; and the widened area embankment is formed by layered filling of excavation soil and light filler in a construction process. The structure provided by the invention can reinforce the bearing capacity of roadbed soil on both sides of the widened area and the original roadbed slope strength, and enhance the integrality of the embankment structure, reduce longitudinal cracks induced by differential settlement and the like at the juncture of new and old roadbeds, thus having good technical and economic benefits. The invention also discloses a construction method of the novel highway embankment widened structure.
Owner:HANGZHOU HUASHUI MUNICIPAL ENG

Sullage solidifying method

InactiveCN101220590AHigh strengthThe surrounding environment is beautified and tidyRoadwaysSolid waste managementSludgePrice ratio
A sludge solidification method is a method for carrying out solidification treatment to the sludge produced in water conservancy projects and civil engineering. The method is that: a. the liquid water content, the clay content and organic content of dredging sludge are tested. b. curing agent is prepared: the curing agent mainly contains cement and calcium oxide which play the function of solidification; wherein, the weight proportion is between 1 : 1 to 4 : 1; waste gypsum is used as water reducing agent which occupies 1 to 8 percent of the sum of cement and calcium oxide in proportion; mealy sand or pulverized fuel ash are used as concrete aggregate which occupies 3 to 5 percent of the sum of the cement and calcium oxide in proportion; c. the curing agent-mixing ratio which is usually controlled from 5 to 20 percent is determined; sampling respectively is carried out, setting time is tested and the unconfined compressive strength which maintains 7, 14 and 28 days is tested by sampling, and the curing agent-mixing ratio finally is determined according to optimal performance price ratio; d. the sludge is carried out curing and constructing in site; mechanical devices are used for stirring the curing agent and the sludge rapidly and evenly, thereby leading the solidification to be rapid and full.
Owner:SOUTHEAST UNIV

High-performance sand-soil consolidation material, as well as preparation method and using method thereof

The invention relates to a high-performance sand-soil consolidation material, as well as a preparation method and a using method thereof. The high-performance sand-soil consolidation material belongs to a mortar composition and is characterized by comprising the following raw materials in parts by weight: 5-40 parts of cement clinker, 3-6 parts of gypsum, 4-10 parts of alkali additive, 0.5-6 parts of compound activating agent, 1-4 parts of early strength agent, 2-10 parts of mineral activating agent, 3-8 parts of expansion agent and 22-77 parts of micro-powder formed by fine grinding of blast furnace water-quenched slag. The invention provides the high-performance sand-soil consolidation material which has the advantages of simple operation, convenient construction, good water resistance, fast consolidation, high early strength, stable improvement of post-strength, resistance to erosion of underground inorganic salt water, excellent anti-seepage performance and low production cost, as well as the preparation method and the using method thereof. The high-performance sand-soil consolidation material is suitable for consolidating mine tailings, natural weathered sand, fly ash, gravel, stone chips, stone powder, soil, sludge, construction waste, coal gangue and phosphorus slag into a solid material, and can be used for laying a subgrade, constructing a wall body and constructing a site foundation.
Owner:淄博乾耀固结材料有限公司

Flat intersection left turn entrance lane removing method and method for driving on flat intersection left turn entrance lane

InactiveCN102051845ASmooth and safe trafficEliminate the construction of overpassesControlling traffic signalsRoadwaysCarriagewaySignal light
The invention relates to a flat intersection left turn entrance lane removing method and a method for driving on a flat intersection left turn entrance lane. A flat intersection comprises two bidirectional lane crossed roads, a right turn lane and a left turn lane. The left turn lane comprises a left turn entrance lane, a left turn waiting lane (1), a crossing lane entrance (2), an intersection signal light (4), a lane area (6), a lane area signal light (4) and an oblique signal light (5), wherein the left turn entrance lane which used to be arranged on the left side of an entrance lane at the intersection now is removed to the right side of an exit lane (8); the left turn waiting lane (1), the crossing lane entrance (2) and the intersection signal light (4) are arranged in a rear section far from an original left turn entrance lane; and the lane area (6), the lane area signal light (4) and the oblique signal light (5) are arranged in the exit lane (8). Vehicles to turn left run to the left turn waiting lane (1) from a running lane (14) to wait for a green light and then run through the crossing lane entrance (2) and the lane area (6) to a left turn entrance lane (7) on the right side of the exit lane to wait for turning. The design adopted in the invention eliminates a conflict point which occurs when the vehicles to turn left and vehicles to go straightly run together, shortens time limit periods of red and green light at the intersection, and relieves traffic jam and disturbance at the flat intersection.
Owner:胡昌碰

Multifunctional road soil roadbed freezing and thawing circulating test device

The invention discloses a multifunctional road soil roadbed freezing and thawing circulating test device. During a freezing and thawing circulating test, six samples are placed among six top plate heat exchangers and six bottom plate heat exchangers of a constant temperature system; the six top plate heat exchangers and the six bottom plate heat exchangers are respectively connected in parallel with a refrigeration circulating machine set; a moisture replenishment system is connected with the bottoms of six roadbed soil samples; a temperature sensor and a soil moisture sensor of a test systemare respectively buried in the six roadbed soil samples of the samples; a displacement sensor of the test system is in contact with the top of the top plate heat exchanger of a temperature control system; and the temperature sensor, the displacement sensor and the soil moisture sensor are connected with an acquisition channel of a data acquisition instrument of a data acquisition system. The multifunctional road soil roadbed freezing and thawing circulating test device has the advantages of simple structure, convenient use, high test precision and reliable result, can better complete the parallel test measurement of the engineering design parameters of roadbed soil modulus of resilience, CBR (Constants Bit Rate) intensity, and the like in a seasonal frost region under a least favorable state, which cannot be achieved by the traditional devices, and can directly provide necessary design parameters for engineering design.
Owner:CCCC SECOND HIGHWAY CONSULTANTS CO LTD

Anchored roadbed widening method

The invention discloses an anchored roadbed widening method, which belongs to the technical field of road construction. The anchored roadbed widening method comprises the following steps of: firstly performing slope cutting on an old roadbed slope, then excavating a step on the old roadbed slope from the ground, obliquely drilling an anchorage hole into an old roadbed at the joint of the vertical plane of the step and the horizontal plane, placing a steel bar into the anchorage hole, and casting the steel bar and the old roadbed into a whole by pouring cement grout; laying a new roadbed in layers, rolling, flatly laying a geogrid on the step of the old roadbed when the new roadbed is filled to be aligned with the step of the old roadbed provided with the anchorage drilled hole, connecting a transverse rib of the geogrid with an end hook which is bent upwards of the exposed part of the steel bar, tensing the geogrid, fixing with the lower layer of a soil body, and finally filling soil on the geogrid and rolling. According to the anchored roadbed widening method disclosed by the invention, an anchor rod technology is used for reinforcing the old roadbed slope, the geogrid and the old roadbed are connected into a whole, the geogrid can be prevented from sliding on the step of the old roadbed, the stability of the new roadbed and the old roadbed is improved, and non-uniform sedimentation can be effectively controlled.
Owner:SHIJIAZHUANG TIEDAO UNIV

Method for filling highroad roadbed by waste steel slags

The invention discloses a method for building a highway road bed with waste steel residues. The method comprises the steps: firstly, waste steel residues are adopted to build the road bed; secondly, the building speed of the road bed built with waste steel residues is required to be controlled to guarantee the road bed stability; thirdly, the road embankment built with waste steel residues is compacted by a vibratory road leveling machine in layers, during the compacting, the waste steel residues shall be in the optimum moisture content scope, through the trial road section method, the appropriate compacting machines and tools are determined, and the maximum dry density and the optimum moisture content are adopted as the compaction degree calculating standard in the road bed built with waste steel residues; and fourthly, the cross section design of the waste steel residue road embankment comprises the road embankment height, the side slope ratio of the road embankment, the building layer thickness, a top sealing layer, a bottom sealing layer, an intercalated layer, the slope protection and a drainage system. The invention has the advantages that the method is easy, the operation is convenient, the waste steel residue piling ground and the environmental pollution are reduced, the wastes are changed into valuables, the environmental protection is promoted, the method solves the problem that the highway engineering packing material is inadequate, the cost is low, and the quality of the built road bed can satisfy the construction requirements of the road bed of the higher grade highway.
Owner:CCCC SECOND HIGHWAY CONSULTANTS CO LTD +1

System for kinetic model test of ballastless track subgrade of high-speed railway

The invention discloses a system for kinetic model test of the ballastless track subgrade of a high-speed railway. The system comprises a model test box, a model of the ballastless track subgrade of the high-speed railway, an excitation system and a monitoring system, wherein the model of the ballastless track subgrade of the high-speed railway is formed by the foundation, a foundation bed bottom layer, a foundation bed surface layer, a concrete base, CA (cement asphalt) mortar, a track plate, a fastener system and a steel rail in sequence; the excitation system comprises a series of vibration exciters; simulation of train loads at different running speeds is realized by cooperatively controlling the vibration excitation frequency and phase of each vibration exciter; and dynamic earth pressure sensors and layered settlement gauges are arranged in the model of the subgrade, steel strain gauges are embedded in the concrete base and displacement and acceleration sensors are arranged on the track structure to jointly form the monitoring system of the system. The system can be used for carrying out study on the kinetic model test of the subgrade under the running load of the train and can evaluate and predict different foundation conditions, subgrade structures and track irregularity.
Owner:ZHEJIANG UNIV

Void-maintaining synthetic drainable base courses in landfills and other large structures, and methods for controlling the flow and evacuation of fluids from landifills

Numerous embodiments of one or more layers of void-maintaining synthetic drainable base courses (“VMSDBC's”) are provided as incorporated into landfills and other waste containment facilities. Key advantages of landfills and methods according to the invention include a substantial decrease in the necessity for conventional gravel and sand layers, and an increase in the effective volume of a landfill or similar facility. Moreover, the invention decreases the cost attendant to locating, transporting, and forming conventional rock, sand and gravel materials into discreet layers.
Owner:ADVANCED GEOTECH SYST

Multiple points settlement observation method and device therefor

InactiveCN101016733AMonitoring layer settlementLow costBarrages/weirsRoadwaysMultiple pointObservation method
The invention discloses a method for checking artificial embankment body and foundation sink. The method comprises that embedding a deep sink detector and a shallow sink detector with hollow tubular structures in each checking layer along one normal line at object position in the artificial embankment body, and leading measuring device or measuring medium into a measuring channel formed by the shallow sink detector and a connecting tube, to measure the position change of the shallow sink detector and measure the height strike of the upper end of the connecting tube to find out the sink of each checking layer.
Owner:NORTHWEST RES INST CO LTD OF C R E C

Method for building over loading railway road-bed on salting ground

The invention relates to a method for constructing the roadbeds of heavy haul railways in saline ground areas, comprising the following steps: packaged sand drain method is adopted to reinforce and tightly compact the saline ground where a foundation is constructed; a first sand bedding is paved, and a first waterproof layer made by two cloth-a film earthwork synthetic materials is then paved on the first sand bedding; earth is taken around the foundation, and the roadbed body is constructed by the taken earth; revetments are arranged at both sides of the roadbed body, and mortar flag stones with drainage ditches are arranged on the revetments; a second sand bedding is paved on the upper surface of the roadbed body, and a second waterproof layer made by two cloth-a film earthwork synthetic materials is then paved on the second sand bedding; stop blocks with drain holes for roadbeds are respectively constructed at both ends of the tops of the roadbed body; a third sand bedding is paved on the second waterproof layer. The method for constructing the roadbeds of heavy haul railways in saline ground areas breaks through the traditional construction technology and provides guarantee for the improvement of the operation.
Owner:CHINA SHENHUA ENERGY CO LTD +1

Vehicle and traffic system

InactiveUS20100121509A1High operating freedomExcellent eco-friendly effectRail devicesRoadwaysElectrical batteryElectric power
Provided are a vehicle having high degree of operation freedom due to electric power being able to be supplied to the vehicle during its travel and due to the vehicle being able to drive on normal roads, and a traffic system. A large number of overhead lines are arranged over a road. An extendable electric power collector is provided at the rear of the vehicle, and a battery and a drive mechanism are mounted on the vehicle. When the power collector is in contact with an overhead line, electric power supplied from the overhead line is supplied to the battery to charge it and electric power is supplied also to the drive mechanism. When the vehicle travel on a normal road having no such overhead lines, electric power is supplied from the battery to the drive mechanism.
Owner:TAKESHIMA NAGAE +1

Poured epoxytar concrete material and its prepn process

The present invention relates to poured road surface laying material, and is especially one kind of poured epoxy asphalt concrete material with low construction temperature, high flowability and construction convenience and its preparation process. The poured epoxy asphalt concrete material consists of component A and component B in the weight ratio of 8-50 as well as stone material in the amount of 3-9 times the component A. The component A consists of asphalt 45-90 weight portions, epoxy resin 4.5-36 weight portions, modified alkylphenol 9-27 weight portions and glycidol ether 0-3 weight portions, and the component B is curing agent. The poured epoxy asphalt concrete material is prepared through mixing the materials of the component A, stirring at 120-160 deg.c, adding stone material, and final adding the heated curing agent and maintaining the temperature for 0-120 min.
Owner:重庆市智翔铺道技术工程有限公司

Reversible lane control method at intersection under influence of left-turn short lane

The invention provides a control method for the signal timing design, the traffic signal lamp bank of reversible lanes and the lane signs of reversible lanes at the intersection of reversible lanes with / without the arrangement of a left-turn short lane. In consideration of the influence of a left-turn short lane on the saturation flow rate of an entrance lane, the phase effective green light time and the functions of reversible lanes are adopted as decision variables, and the minimization of the vehicle delay rate at the intersection and the maximization of the traffic capability at the intersection are adopted as objective functions. In this way, a signal timing optimized model system at the intersection is established based on the operational research and the traffic flow theory. Meanwhile, a specific design principle for designing the lane signs of reversible lanes is provided from the point of drivers. According to the traffic flow operating rule and the behavior characteristics of drivers, different coordination control rules for the traffic signal lamp bank of reversible lanes and the lane signs of reversible lanes are designed respectively for two conditions, namely the function invariable condition of reversible lanes and the function variable condition of reversible lanes during the control period switching process. The embodiments of the invention prove the feasibility and the validity of the above method. By adopting the above method, the intersection congestion problem caused by the tidal characteristics of the traffic flow can be effectively alleviated.
Owner:DALIAN UNIV OF TECH

Roadbed filler for road and preparation method of roadbed filler

The invention relates to a roadbed filler for a road and a preparation method of the roadbed filler. The roadbed filler for the road is characterized by being prepared from lime, pulverized fuel ash, phosphogypsum and stabilizer. The weight percentage of each material in the lime, the pulverized fuel ash and the phosphogypsum is 15% of lime, 30-50% of pulverized fuel ash and 35-60% of phosphogypsum; the sum of the weight percentages of the materials is 100%; the stabilizer is water glass or NaAlO2 (sodium metaaluminate); the adding amount of the water glass is 2-6% of total mass of the lime, the pulverized fuel ash and the phosphogypsum, and the adding amount of the NaAlO2 is 0.5-2% of total mass of the lime, the pulverized fuel ash and the phosphogypsum. Due to the roadbed filler for the road prepared by the method, not only can the early strength be improved, but also the problem of water stability can be solved.
Owner:WUHAN INSTITUTE OF TECHNOLOGY +2

Waterside road broadened embankment structure and construction method thereof

The invention relates to a waterside road broadened embankment structure, which is characterized in that the waterside side of a new embankment is provided with a waterproof maintenance pile, and the outer side of the maintenance pile is provided with a dumping stone weights body; the lower part of the new embankment is a solidified soil layer, the upper part of the new embankment is a lightweight filler layer, and the contact part of the solidified soil layer and the lightweight filler layer is provided with a horizontal reinforced body and a vertical reinforced body; a grouting strengthened body is arranged in an original embankment, and the front end of the grouting strengthened body is a reinforced connecting section; and the side slopes on the top surface and outer side of the new embankment and the two sides of the maintenance pile are respectively provided with a waterproof later, and the bottom of the dumping stone weights body is provided with an impervious blanket. According to the invention, the connection strength and integrity of the new and original embankments can be enhanced, an outside water body is prevented from permeating in the embankments from multiple beddings, and the anti-uplift performance of the embankment can be improved, therefore, the embankment structure has good technical and economic benefits. The invention also provides a construction method of the broadened embankment structure.
Owner:江苏镇江路桥工程有限公司

Plane road intersection dispersion system without left turn conflict

The invention discloses a plane road intersection dispersion system without a left turn conflict. A left turn guiding channel having a certain distance from stopping lines is arranged at a left-most lane in any driving direction of an intersection, a left turn waiting zone is arranged at an right-most lane of an inverted road of the same intersection, and the left turn guiding channel and the left turn waiting zone are connected. Left moving stopping lines and left moving traffic lights are arranged at the entrance of the left turn guiding channel. By utilizing the idle time that no vehicles are on the inverted road when the straight driving direction is in a red light period, left-turning vehicles are enabled to stop at the right-most side of the inverted lane, left turning is finished by one time during the red light period of the intersection, and no conflicts are generated between opposite vehicles. According to the invention, the smooth passing requirements of the straight-driving and left-turning vehicles are satisfied, the crossing conflicts and accidents of vehicles are reduced, and the vehicle passing capacity of the intersection is effectively improved.
Owner:XI'AN POLYTECHNIC UNIVERSITY

Dry-method construction method for drift-sand roadbed

The invention discloses a dry construction method for a wind-blown sand subgrade. According to physicochemical properties and mechanics characteristics of wind-blown sand, the method uses a vibrating compaction machine to perform vibration and rolling compaction on the wind-blown sand in a natural state paved on the subgrade under proper pressure by selecting proper vibration frequency and amplitude, so that the strength of the subgrade after the vibrating compaction meets the design requirement; and the method adopts a layer of the wind-blown sand and a layer of gravelly soil, and totally encloses the subgrade by clay or grit finally so as to avoid the wind erosion and ensure the overall stability of the subgrade. Compared with the prior art, the method avoids the use of precious water resources for construction in desert areas lacking water severely, not only reduces the construction cost of projects, but also reduces the influence on the local environment to the minimum level, and is an ideal construction method with economic and social benefits.
Owner:CHINA RAILWAY 11TH BUREAU GRP +1

Lane dynamic partitioning control method for expressway intersection area

Provided is a lane dynamic partitioning control method for an expressway intersection area. For the expressway intersection area, based on the actual traffic state, lanes of the intersection area are dynamically partitioned into intersection area lanes and non-intersection area lanes through signal indication signs. The intersection of the upper ramp traffic, the lower ramp traffic and the mainline traffic is achieved by means of the intersection lanes; the exclusive right of way is provided for the non-intersection traffic flow of an expressway mainline by the utilization of the non-intersection lanes. The control method comprises the two parts of the dynamic partitioning of the functions of the intersection area lanes and the control over the functions of the intersection area lanes, and the lane function dynamic partitioning model regards the overall through-out capacity maximization as a target, and determines the number of vehicles on the intersection lanes and the non-intersection lanes; the lane function control part comprises a control strategy implementation scheme, information publishing equipment arrangement and an isolation implementation method. The method can provide the exclusive right of way for the expressway mainline traffic in the intersection area, and reduce the interference to straight vehicles of the mainline by the intersection behavior, thereby improving the through-out capacity of the intersection area; under the condition that the vehicles line up and overflow at an off-ramp, the straight vehicles of the mainline can pass through normally, the vehicle average delay is reduced, and the bottleneck problem of the expressway weaving area is solved or relieved.
Owner:TONGJI UNIV

Transit system

A transit system for individual vehicles includes a substantially enclosed guideway with a transit lane and a transition lane. Disposed along the guideway are selectively actuable portals, configured to allow substantially transverse ingress and egress of vehicles into the transition lane. The vehicles are configured for automatic control within the guideway and during ingress and egress, and may also be configured for independent control by a driver outside the guideway. In the transition lane the vehicles accelerate to a transit speed and merge into the adjacent transit lane. Upon approaching a selected destination portal, an individual vehicle merges back into the transition lane to decelerate for exit. The guidance system allows the vehicles to combine into controllably linked "trains" in the transit lane.
Owner:RICHARDS BRYAN

Lane setting at road intersection and corresponding traffic light control method

A lane setting at a road intersection and a corresponding traffic light control method. It does not distinguish between primary and secondary roads, so that the number of entrance and exit lanes of each main phase is kept equal; the entrance lanes are divided into three parts: "entrance guide lane", "peripheral guide lane" and "bus and right-turn lane"; according to the direction of travel Arrange the lanes, light groups, signal groups and phases symmetrically on the horizontal axis of the horizontal axis; at the intersection, run the main phase of A going straight——B going straight——A turning left (including U-turn)——B turning left (including U-turn); The "peripheral traffic lights" alternately operate the two phases of straight-going vehicles moving forward and left-turning (including U-turn) vehicles moving forward, and an evergreen phase and "electronic police" for directing right-turning vehicles and buses to pass; according to the number of left-turning vehicles Decide whether to control the clearance of pedestrian crossings in units of full or half-way. This method can make the number of lanes passing by each phase of the intersection reach the maximum on the basis of equilibrium, and is conducive to the priority of public transportation and the convenience of pedestrians.
Owner:胡又宏 +2

Reinforcement method and reinforcement structure for treating railway soft soil roadbed settlement overweight before operation

ActiveCN102926304AReduce damageThe construction period of the main structure is shortRoadwaysFoundation testingOverweightObservation system
The invention discloses a reinforcement method and a reinforcement structure for treating railway soft soil roadbed settlement overweight before operation. The reinforcement structure mainly consists of five parts, namely a main bearing structure system, a reinforced cushion layer structure system, a foundation bed drainage system, a settlement observation system and a reserved grouting system. The technical problems that the existing roadbed is greatly damaged, the construction period is long, the construction property is low, the quality is difficult to control and the problem that the soft soil roadbed settlement overweight is caused in the conventional technical scheme are effectively solved.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products