Reinforcement method and reinforcement structure for treating railway soft soil roadbed settlement overweight before operation
A technology for soft soil subgrade and reinforcement structure, which is applied in basic structure engineering, basic structure testing, soil protection, etc. Deterioration of force conditions, short construction period, and ensuring the effect of integrity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The present invention will be further described in detail below in conjunction with the drawings and specific embodiments:
[0043] A reinforcement method for dealing with excessive settlement of railway soft soil roadbed before operation, such as Figure 1~6 As shown, it includes the following steps:
[0044] Step 1: Remove the track structure and contact wire in the soft soil subgrade area of the railway, and then excavate the upper bed of the subgrade 6.1 to form a foundation pit 6.3. On the foundation pit 6.3, set multiple pre-stressed high-strength concrete vertically inserted into the subgrade 6.1. Pipe pile 1.1, pre-stressed high-strength concrete pipe pile 1.1 After the completion of the construction, the pre-stressed high-strength concrete pipe pile 1.1 and the hole wall shall be filled with fine stone concrete in time;
[0045] Step 2: Pre-bury the vertical grouting pipe 5.1, the horizontal grouting pipe 5.2 and the vertical grouting pipe 5.3 which are connected t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com