Poured epoxytar concrete material and its prepn process
An epoxy asphalt, pouring technology, used in roads, roads, buildings and other directions, can solve the problems of not particularly ideal low temperature performance, high mixing temperature, poor high temperature performance, etc., to achieve good high temperature rutting resistance, low construction temperature, The effect of improving high temperature performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0031] (1) Weigh raw materials according to the following ratio
[0032] A component: No. 90 asphalt 11 parts
[0033] Bisphenol A type epoxy resin E44 1.7 parts
[0034] Modified nonylphenol 3.4 parts
[0035] Cresyl glycidyl ether 0.1 parts
[0036] Component B: 0.8 parts of modified isophorone diamine
[0037] Stone basalt crushed stone and mineral powder total 83 parts
[0038] Stone particle size and dosage: the dosage of mineral powder is 24%, and the dosage of particle size 0-10mm is 76%.
[0039] (2) Preparation process
[0040] 1. Add No. 90 asphalt, bisphenol A epoxy resin E44, modified nonylphenol, and cresol glycidyl ether into a mixing pot, heat to 120°C, and stir and mix for 1 hour to obtain component A;
[0041] 2. Heat the stone to 160°C, add it into the mixing pot, and fully stir with component A for 5 minutes, keeping the temperature at 120°C;
[0042] 3. Heat component B to 130°C, add it to the mixture of stone and component A, fully stir at 120°C for...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com