Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

113 results about "Long term safety" patented technology

Long-acting special controlled release fertilizer for corn and preparation method thereof

InactiveCN101177365ALess hygroscopic expansion and contractionSimple preparation processFertilizer mixturesPotassiumNutrient
A special controlled-release fertilizer for long-acting corn and its preparation method. The fertilizer core accounts for 80-92% of the total weight of the fertilizer, wherein the weight sum of nitrogen fertilizer, phosphorus fertilizer and potassium fertilizer calculated by pure nitrogen, phosphorus pentoxide and potassium chloride is the fertilizer 25%-50% of the total weight, the weight ratio is: 2-4:1-2:1-3; the coating coating accounts for 8-20% of the total weight of the fertilizer, including: 69.5-93% sulfur, 530 % polyethylene wax, 0.5-2% leveling agent. Melt sulfur, add montmorillonite and stir evenly, then add leveling agent, stir evenly to form molten sulfur. The molten sulfur and polyethylene wax are simultaneously sprayed on the surface of the fertilizer core to form a slow-release coating layer. The process occupies less land, requires less investment in equipment, and consumes less energy. It has the characteristics that one fertilization can meet the nutrient needs of corn throughout the growth period. The fertilizer effect is long and safe, and fertilization is simple.
Owner:SHANDONG AGRICULTURAL UNIVERSITY

Implantable tissue ischemia sensor

InactiveUS20070027371A1Detection and treatment of ischemia is aidedCatheterDiagnostic recording/measuringMedicineImplanted device
An implantable ischemia detection system in which a white LED (105) produces a continuous, visible, broadband light illuminating a target site (125). Light backscattered by the target is collected by a sensor (155), allowing for an index of ischemia to be determined, and subsequently transmitted by a sending unit (167). Power is provided by an internal power source (179). The entire implantable device is encapsulated by a biocompatible shell (102) to add long-term safety with regard to implantation.
Owner:J FITNESS LLC

Device and methods for the detection of locally-weighted tissue ischemia

InactiveUS20070015981A1Simple and safe and non-electrical transmissionDeployment securityCatheterDiagnostic recording/measuringMedicineBroadband
An implantable ischemia detection device in which a broadband light source produces a continuous, visible, broadband light illuminating capillary sites within a well localized target tissue is provided. Light backscattered by the target tissue is collected by a sensor, allowing for an index of ischemia to be determined, and subsequently transmitted by a sending unit. Optionally, the device may be provided with an internal power source, the entire device encapsulated by a biocompatible shell to add long-term safety while implanted at a target tissue site.
Owner:J FITNESS LLC

Storage device of car event data recorder

A storage device of car event data recorders is revealed. The storage device of car event data recorders includes at least two sets of memory or at least one memory set with at least two memory areas. The first memory module (or area) is used to record real time audio / video data with continuous attributes while the second memory module (or area) is for retrieving and recording audio / video data at the time of the accident and / or pre-alarm audio / video data before the accident and / or post-alarm audio / video data after the accident. The interval before or after the accident may be a few decades of seconds. Thereby the storage device of car event data recorders can perform long-term safety control operations and completely record real time audio / video data during, before and after each event. Therefore, certain audio / video data is stored for long-term preservation and checked. Thus the efficiency of the storage device of car event data recorders is improved.
Owner:APPRO TECH

Implantable tissue ischemia sensor

InactiveUS7813778B2Detection and treatment of ischemia is aidedCatheterDiagnostic recording/measuringMedicineImplanted device
An implantable ischemia detection system in which a white LED (105) produces a continuous, visible, broadband light illuminating a target site (125). Light backscattered by the target is collected by a sensor (155), allowing for an index of ischemia to be determined, and subsequently transmitted by a sending unit (167). Power is provided by an internal power source (179). The entire implantable device is encapsulated by a biocompatible shell (102) to add long-term safety with regard to implantation.
Owner:J FITNESS LLC

Method for recognizing load of single vehicle passing through multi-girder type bridge

The invention belongs to the technical field of buildings and traffic bridges, and particularly relates to a method for recognizing the load of a single vehicle passing through a multi-girder type bridge. According to the method, the weight of the vehicle is back calculated through response of the bridge when the vehicle passes through the bridge; the axle weights of all shafts of a large car are obtained according to an axle load distribution ratio after the weight of the vehicle is obtained; goodness fit is conducted on the total weight of a small car and the axle weight of the large car, and the distribution and the parameters obeyed by the vehicle weight and the axle weights are obtained; the distribution of the axle weights of all axles of the large car is obtained, and a vehicle model better meeting the reality is set up; the response of the bridge is obtained under the effect of the vehicle load, the Monte Carlo method or other methods can be used for generating a random traffic flow meeting the local reality, generated random vehicles are analyzed, the safety condition of the bridge under the normal traffic operation condition is evaluated, and a basis is provided for long-term safety evaluation of the bridge.
Owner:CHANGAN UNIV

Lithium ion battery

To provide high energy density, good cycle properties and rate characteristics and long-term safety of a lithium ion battery containing at least an ionic liquid and a lithium salt. The above problems are solved by suppressing reduction and decomposition of the ionic liquid on an anode by using a graphite coated with an amorphous carbon or onto which an amorphous carbon is deposited as an anode active material.
Owner:NEC ENERGY DEVICES LTD

Method for determining long-term strength parameter of surrounding rock of underground water seal petroleum storage cavern

InactiveCN104132848AReflect the characteristics of the surrounding rockMaterial strength using tensile/compressive forcesRock sampleUltimate tensile strength
The invention discloses a method for determining a long-term strength parameter of surrounding rock of an underground water seal petroleum storage cavern. The long-term strength parameter of the underground water seal petroleum storage cavern is calculated through a stress-strain isochronous curve or a rheological rate in a constant-speed steady-state rheological stage according to rheological test data, obtained from triaxial rheological mechanics tests, of a rock sample. According to the method, a relatively actual long-term strength parameter can be obtained by fully considering a stress-seepage flow coupling effect for judging the stability of the surrounding rock of a cavern group. The method is actual and reliable, in the method, the stress-seepage flow coupling effect is fully considered for the first time during the determining of the long-term strength parameter of the surrounding rock of the underground water seal petroleum storage cavern, and the value of the long-term strength parameter is smaller than a value of a long-term strength parameter obtained without considering the seepage effect, relatively accurately reflects the characteristic of the surrounding rock of the underground water seal petroleum storage cavern, and has a reference value for accurately evaluating the long-term safety stability of the underground water seal petroleum storage cavern.
Owner:HOHAI UNIV

Shield tunnel pipe piece designing method taking double-liquid synchronous grouting layer performance degradation into consideration

The invention discloses a shield tunnel pipe piece designing method taking double-liquid synchronous grouting layer performance degradation into consideration. The method comprises a first step of determining different distributing patterns of gel calcium silicate in cement-water glass double liquid based on careful observation and analysis, a second step of calculating occurrence frequency, occupied area proportion and structural effect influence coefficient of the gel calcium silicate in different distributing patterns, a third step of carrying out discount calculation on the mechanical property of the cement-water glass double liquid which is degraded by the gel calcium silicate according to a calculated result, and a fourth step of calculating the internal force and the deformation of a shield tunnel pipe piece lining structure by the adoption of the modified routine method. By means of the method, an accurate and effective evaluation can be carried out on the long-term mechanical property of the cement-water glass double liquid which is degraded by the gel calcium silicate which is a reaction product of the double liquid, then the evaluation is carried out on the long-term safety performance of a tunnel structure and other building structures using the cement-water glass double liquid, the method is used for designing shield tunnel pipe pieces, and the result is realer and more reliable.
Owner:SOUTHWEST JIAOTONG UNIV +1

Brake control method and system of wind generating set

The embodiment of the invention provides a brake control method and system of a wind generating set. The brake control method comprises the steps that according to information of failures of a power grid, the wind generating set is subject to brake load reduction control, and the brake load reduction control comprises the steps that a pitch system of the wind generating set is controlled to execute feathering according to the preset maximum feathering speed, and a converter of the wind generating set is controlled to execute the preset maximum torque set. According to the technical scheme, theshutdown load of the wind generating set can be effectively reduced, the wind generating set can be safely shut down, the influence on the mechanical property of the wind generating set can be avoided, the mechanical service life of the wind generating set is ensured, and long-term safety running of the wind generating set can be ensured.
Owner:BEIJING GOLDWIND SCI & CREATION WINDPOWER EQUIP CO LTD

Supercritical unit CCS side primary frequency modulation method

InactiveCN105896569AFast load changeImprove variable load capacityPower oscillations reduction/preventionLower limitSpeed control system
The invention discloses a supercritical unit CCS side primary frequency modulation method. The method comprises the following steps: 1, the sum of an AGC power instruction and a primary frequency modulation power change requirement value is solved; 2, the sum value acquired in the first step and a power lower limit value are compared, and the larger value between the two is taken; and 3, the larger value acquired in the second step and a power upper limit value are compared, and the smaller value between the two is taken as power instruction output. Thus, the unit primary frequency modulation function can achieve long-term safety input, the unit primary frequency modulation performance is excellent, an important role is played in safety and reliability of a power grid and a power plant, frequency modulation requirements by the power grid can be fully met, and on the above premise, speed control system modeling work of the unit of the kind can be developed smoothly.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO +1

Selenium-rich soybean sprouts and production method thereof

The invention discloses selenium-rich soybean sprouts and a production method thereof and belongs to the technical field of production of selenium-rich agricultural products. The production method comprises the following particle steps of: inoculating rhodopseudomonas bacteria AYGHJ-16 in a culture medium to prepare a selenium-rich bacterial agent; diluting the selenium-rich bacterial agent into selenium-rich bacterial agent diluent of which the volume is 20 to 50 times the volume of the selenium-rich bacterial agent with water; after placing soybean seeds into the 50-times selenium-rich bacterial agent to carry out seed soaking for 24 to 48 hours, enabling the soybean seeds to sprout and grow at a room temperature of 20 to 25 DEG C; in the sprouting process, spraying the soybeans with the 20-times selenium-rich bacterial agent at time intervals of 4 hours, so that after sprouting and growing for 5 to 6 days, bud seedlings grow to 8 to 10cm; and after taking out the bud seedlings, flushing the bud seedlings clean with tap water so as to obtain the selenium-rich soybean sprouts. The selenium-rich soybean sprouts produced by the method has the selenium content of 1 to 1.5mg / L, does not contain inorganic selenate or selenite and can meet the requirement of people for long-term safety selenium supplement.
Owner:SHANGHAI BOCHEN BIOTECH

Method of active coupling support in time and space for control of minimum deformation of surrounding rock of deep well roadway

InactiveCN102337903AEffective control with minimum deformationInhibits the evolution of deformation damageUnderground chambersTunnel liningCouplingPre stress
The invention discloses a method for active coupling support in the time and space for control of minimum deformation of surrounding rocks of a deep well roadway, which is characterized by comprising: excavating a roadway according to the shape of the cross section of the roadway; immediately supporting the surrounding rocks of the roadway with steel bar nets and high-strength prestressed anchor rods so as to promptly limit the deformation of the surrounding rocks; reinforcing the support with high-strength prestressed anchor ropes in the middle of the top plate of the roadway and two spandrels of the roadway to inhibit expansion of destruction; within 20-30 days after roadway tunneling, installing grouted anchor tubes on the surrounding rocks of the top plate, two shoulder supports and abottom plate of the roadway, and grouting cement slurry into the surrounding rocks of the roadway for grouting reinforcement to maintain the stability of the surrounding rocks; and finally backfilling concrete to level the bottom plate of the roadway. In the method, supports of different strengths are emphasized in different periods and on different parts of the roadway, the best active coupling support in the time and space can be achieved for roadway supporting, the deformation of the surrounding rocks of the roadway can be controlled within the minimum range, the repair of the roadway can be avoided, and the long-term safety and stability of the roadway can be achieved.
Owner:ANHUI UNIV OF SCI & TECH

Underground natural gas storage injection-production pipe column designing method

The invention belongs to the technical field of well drilling and discloses an underground natural gas storage injection-production pipe column designing method. By comprehensively considering the influence on a pipe column from self weight of a pipe body, the temperature effect, the pressure effect and the friction effect generated by fluid flowing, on the basis of design of an existing pipe column, compression loads are considered and matched with the compression efficiency of a pipe column connector to design an underground natural gas storage injection-production pipe column, it is ensured that the compression efficiency of a connector of the designed pipe column meets the operation compression load and sealing requirements, and meanwhile as the triaxial stress of the pipe column is considered for design, the overall structural intensity of the injection-production pipe column can meet the operation load requirement. The underground natural gas storage injection-production pipe column designing method not only can meet the airtightness under stretching loads, but also can meet the airtightness of the pipe column after stretching and compression loads interchange, improve the sealing performance of the pipe column under the interchanged loads and ensure long-term safety operation of the injection-production pipe column.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Method for safety precaution of producing area of farm product in long term

InactiveCN101593342AData processing applicationsTemporal changeAgroecosystem
The invention discloses a method for safety precaution of a producing area of a farm product for a long term, which comprises the following steps: taking a standard data of producing area environment of a non-polluted farm product, a product standard data and a background data of actual environment of the producing area as basis to construct a weight matrix of indexes influencing composite index of the producing area environment; calculating composite index of respective year of the producing area through historical actual measurement data of the producing area environment; and finally outputting a line graph of the composite index and a predictor formula of the producing area by using a double exponential smoothing method of a time sequence so as to carry out prediction and warning of composite index and the deterioration speed of a producing area of a future farm product. The method discloses a law that the producing area safe condition changes along with the time through the historical data of the time sequence and predicts the future, has high reliability and accuracy, can carry out prediction and prewarning of an evolution trend, the direction and the speed of the producing area safety of different areas, and can make foreseeable judgment on a system and the like so that pertinence measures are taken, alarming source is eliminated, and agroecosystem safety can be ensured; and the method has wide applicability.
Owner:贵州省理化测试分析研究中心

Compound coating coronary medicament eluting stent and preparation method thereof

The invention discloses a compound coating coronary medicament eluting stent and a preparation method thereof. The compound coating coronary medicament eluting stent comprises a supporting naked stent, a phosphorylcholine polymer coating and a degradable medicament carrying polymer coating, wherein the phosphorylcholine polymer coating is coated on the surface of the naked stent; and the degradable medicament carrying polymer coating is coated on the surface of the phosphorylcholine polymer coating. The stent is transplanted at a lesion position in the bodies of the coronary disease patients, the outer degradable medicament carrying polymer coating gradually degrades and releases the loaded medicament to restrain the blood restenosis caused by smooth muscle proliferation in the blood vessels, after the outer medicament carrying coating degrades completely, the stent of the phosphorylcholine polymer coating is left, the pseudo membrane characteristics of the phosphorylcholine radical makes the metal stent more biocompatible, so cell coverslips are increased, the poststage coalescence of the stent and the blood vessel is promoted, stent endothelialisation is promoted, and better curative effects and long-term safety are provided.
Owner:NANJING UNIV

Mould casting type flexible direct-current cable soft joint reaction force cone structure designing method

InactiveCN106451316ASolve the electric field problemAvoid field strength build-upCable fittingsElectricityElectrical conductor
The invention discloses a mould casting type flexible direct-current cable soft joint reaction force cone structure designing method. The method is characterized by comprising the following steps: (I) determining the parameters of a cable conductor, and calculating the temperature difference between the insulating inner and outer surfaces of a direct-current cable body; (II) calculating the electric field intensity at the center of a direct-current cable insulation layer; (III) calculating a direct-current cable soft joint reaction force cone curve equation; and (IV) obtaining a reaction force cone structure to obtain the specific structure of the cable soft joint. The method has the following advantages: the problem of electrical resistivity mismatching between the cable body insulation material and the mould casting insulation material and consequent field intensity accumulation at the interface of the two are avoided; meanwhile, the influence of temperature and electric field factors on the electrical resistivity is considered, electric field distribution in flexible direct-current cable terminal insulation is proposed, and a theoretical basis is provided for designing a flexible direct-current cable soft joint; uniform electric field at the flexible direct-current cable soft joint is guaranteed; and the electrical property requirement of the whole flexible direct-current cable system on the joint is met, and long-term safety and reliability of the flexible direct-current cable system are guaranteed.
Owner:NANJING NARI GROUP CORP +3

All-backheating drainage system of heat supply network heater for supercritical concurrent boiler thermal power plant

ActiveCN101886804AGuarantee the quality of water supplyGuarantee long-term safe operationFeed water supplyEngineeringHandling system
The invention relates to an all-backheating drainage system of a heat supply network heater for a supercritical concurrent boiler thermal power plant. Condensed water in a condenser passes through a shaft seal cooler of a condensed water system and then enters into a condensed water precision processing device; a drainage water cooling section is arranged in the heat supply network heater, and drainage water in the heat supply network heater is cooled by the drainage water cooling section; the cooled drainage water is boosted by a drainage pump, then passes through a drainage water cooler and exchanges the heat with condensed water from the condensed water precision processing device in the drainage water cooler; the heat-exchanged drainage water and the condensed water from the shaft seal cooler of the condensed water system are mixed to enter the condensed water precision processing device; and the condensed water from the condensed water precision processing device returns to the system after heat exchange, therefore, the desalting of more than 80 percent of a unit steam-water system through a chemical processing system is ensured, the boiler feedwater quality is ensured, and the long-term safety operation of a supercritical concurrent boiler and the heat exchange between the drainage water of the heat supply network heater and the heat supply network are also ensured; and compared with schemes of partially recovering the heat and then discharging the heat to the condenser, the invention improves the efficiency by a larger extent.
Owner:NORTH CHINA POWER ENG

Long term monitoring methods for structure stress of bridge

InactiveCN101363760ARealize long-term security monitoringRealize complementary advantagesForce measurementSurface mountingLong term monitoring
The invention discloses a long-term monitoring method for bridge structural stress. The method comprises the steps: monitoring the structural stress of a bridge through a pre-embedded sensor and a surface mounting sensor; respectively building stress-time curve of the pre-embedded sensor and the surface mounting sensor to seek a correlated parameterization function of two stress-time curve; and reversely educing the stress of the bridge structure under the action of dead load and live load by combining the stress result of the surface mounting sensor and the correlated function, after the pre-embedded sensor is ineffective. The invention has the advantages that the method analyzes and induces the correlation obtained by two stress monitoring means of the pre-embedded sensor and the surface mounting sensor, realizes the complementary advantages of the two stress monitoring means, and realizes long-term safety monitoring for the bridges in operation period.
Owner:CHONGQING JIAOTONG UNIVERSITY +1

Preparation method for zirconolite type manmade rock

The invention discloses a preparation method for a zirconolite type manmade rock. The preparation method is characterized by comprising the following steps: preparing materials from CuO powder, CaO powder, Ti powder, TiO2 powder and ZrO2 powder; performing dry-process ball-milling on the raw materials, uniformly mixing the raw materials and enabling the raw materials to pass through a 100-mesh sieve; feeding 10-50g of the mixed materials into a stainless steel mould, and pressing the mixed materials into cylindrical blank; introducing the blank into a self-propagating quasi-isostatic device, igniting the blank through a tungsten filament to react, and applying pressure of 50-200MPa after the combustion reaction is ended, thereby preparing the high-compactness zirconolite type manmade rock. The preparation method disclosed by the invention can be used for synthesizing the zirconolite type manmade rock within several minutes by adopting a self-propagating high-temperature combined quick compacting process, has the advantages of being high in synthesis speed, high in efficiency, high in reaction temperature, high in product purity, low in energy consumption, simple, and the like; the prepared zirconolite type manmade rock is suitable for long-term safety solidification treatment and disposal of actinide in high-level waste.
Owner:SOUTHWEAT UNIV OF SCI & TECH

Pre-embedded/pre-built-in -hole creating apparatus and pipe bank box having the same

The present invention provides a pre-embedded / pre-built-in hole creating apparatus for buildings, including: a pipe casing for a pipe or a pipeline system of the building to pass there through; at least one thermal-expandable foam detachably accommodated within the pipe casing; an inspection annulus detachably joined with the pipe casing; and a slide cover installed onto the pipe casing and secured to the building structure. The at least one thermal-expandable foam in the hole creating apparatus embedded in the building structure can be removed via the detachable structure for inspection and replacement so as to maintain the flame-retardant function of the hole creating apparatus. Said apparatus further includes an annular shielding plate providing functions of airtight and smoke blocking for the through pipes as well as includes an identifying device providing information, tracking and service associated with the apparatus in order to guarantee long term safety.
Owner:LIN KUAN LUNG

Intracranial drug eluting stent system and preparation method thereof

ActiveCN105833358AReduce late thrombosisReduce restenosis catch-up problemSurgeryCoatingsDiseaseIntracranial Artery
The invention relates to an intracranial drug eluting stent system and a preparation method thereof, in particular to an intracranial drug eluting stent used for treating the intracranial atherosclerotic stenosis disease .The intracranial drug eluting stent is composed of a metal stent body and a coating structure covering the surface of the metal stent body, the coating structure comprises one or more stent substrate coatings and drug coatings, and the drug coatings contain a biodegradable drug carrier and a drug inhibiting excessive proliferation of VSMCs .According to the intracranial drug eluting stent, the diseased artery is expanded with the stent to improve intracranial artery blood perfusion, the drug carried by the stent can prevent excessive proliferation of endangium, and thus the probability of in-stent restenosis is lowered; meanwhile, stent healing in the artery can be rapidly achieved, and thus long-term safety and effectiveness are ensured for patients.
Owner:赛诺神畅医疗科技有限公司

Soil passivation restoration agent and preparation method thereof

The invention relates to a soil passivation restoration agent and a preparation method thereof. Melamine wide in source is used as a core, the cost is low, the characteristic that phosphonyl groups have strong heavy metal ion chelating effect is utilized to design the soil passivation restoration agent provided with 30 phosphonyl radical groups, the phosphonic acid radical groups in the soil passivation restoration agent are far greater than that in existing soil passivation agent molecules in number, and the soil passivation restoration agent is strong in chelating effect, big in molecular space volume and difficult to migrate, has the good performance of stabilizing heavy metals in soil and good acid and alkali resistance capability, meets the long-term safety requirement of the soil, meanwhile is mild in reaction condition, facilitates a large-scale preparation method, is applied to the fields of restoration of industrial and mining heavy metal soil and paddy field and the like and has wide prospect.
Owner:衡南县满堂红生态农业有限公司

Method for directly determining long-term strength of rock mass by quick creep test

The invention provides a method for directly determining long-term strength of a rock mass by quick creep test. The method comprises the following steps of (1) performing graded loading creep test on the studied rock mass, so as to obtain a graded loading creep test curve of the rock mass; (2) according to the graded loading creep test curve, judging the minimum load value of viscous plasticity deformation; (3) for the test curve with viscous plasticity deformation, using a creep deformation formula to fit, so as to obtain the viscous plasticity deformation rate; (4) according to the relationship between the viscous plasticity deformation rate and the stress level, extrapolating to obtain the stress when the viscous plasticity deformation rate is 0, namely the long-term strength. The method has the advantages that the creep test time can be shortened, the long-term strength of the rock mass can be directly determined by the graded loading creep test curve, the artificial judging of inflection points is not needed, and then a reliable basis is provided for the long-term safety evaluation of the rock mass structure.
Owner:POWERCHINA HUADONG ENG COPORATION LTD

Lithium ion battery

InactiveUS20120315546A1Suppress reduction/decomposition activityFacilitate intercalationCell electrodesNon-aqueous electrolyte cellsAluminium-ion batteryDecomposition
To provide high energy density, good cycle properties and rate characteristics and long-term safety of a lithium ion battery containing at least an ionic liquid and a lithium salt. The above problems are solved by suppressing reduction and decomposition of the ionic liquid on an anode by using a graphite coated with an amorphous carbon or onto which an amorphous carbon is deposited as an anode active material.
Owner:TOKIN CORP

Analogs of indole-3-carbinol metabolites as chemotherapeutic and chemopreventive agents

Novel compounds useful as chemotherapeutic and chemopreventive agents are provided. The compounds are analogs of indole-3-carbinol metabolites wherein the structures and substituents of the compounds are selected to enhance the compounds' overall efficacy, particularly with respect to therapeutic activity, oral bioavailability, long-term safety, patient tolerability, and therapeutic window. The compounds are useful not only in treatment of cancer but also in prevention of cancer. One preferred class of the novel compounds have the structure of formula (I)wherein R1, R2, R3, R4, R5, R6, R7, R8, R9, R10, R11, and R12 are defined herein. Pharmaceutical compositions are provided as well, as are methods of synthesis and use.
Owner:SRI INTERNATIONAL

Photoelectric composite railway digital signal cable

The invention is a photoelectric compound railway digital signal cable, comprising a cable core, which comprises plural groups of signal lines, where at least a group of signal lines is an inner-screened four-line group and at least another group of signal lines is a group of loose tube optical-fibers, gaps between signal lines are filled with water stop ointment, the cable core is coated in order with inner jacket layer, outer water stop belt, aluminum jacket layer, metallic armouring layer, and outer jacket layer, the outer water stop belt is made from water soluble expansive material, and water stop glue is filled between the metallic armouring layer and aluminum jacket layer. And it can ensure long-term safety and reliability of railway digital communication and be maintained without aeration, largely saving the operating cost.
Owner:TONGDING INTERCONNECTION INFORMATION CO LTD

Interfacial shear stress measurement device for pre-stressed anchor and testing method thereof

The invention provides an interfacial shear stress measurement device for a pre-stressed anchor. The device comprises a rod body, a PVC pipe which is arranged above the rod body and parallel to the rod body and is used for importing lead wires, at least one PVC pipe ring which is connected with the PVC pipe and is alternately embedded outside the rod body; rectangular slots are respectively formedin two sides of the PVC pipe ring; the rod body comprises an inner anchoring section extending into surrounding rock and a free section extending out of the surrounding rock; strain gauges I are respectively adhered to two sides of the rod body corresponding to the position of each PVC pipe ring, and a fine steel bar is hinged in the position; the strain gauges I are distributed on the inner anchoring section according to testing requirement; strain bricks adhered with strain gauges II are respectively drawn out by the fine steel bar toward two sides of the rod body, and the strain gauges IIface to a to-be-measured interface; preserved holes for lead wires to penetrate are formed in the position, contacted with the PVC pipe, of the PVC pipe ring; and an external deformeter is connected with the strain gauges I and the strain gauges II respectively through lead wires. The device facilitates better studying of the long-term safety and durability of a rock soil prestressed anchoring structure.
Owner:SHANDONG JIANZHU UNIV +1

Urban masonry residence safety assessment method based on uncertainty analysis

The invention discloses an urban masonry residence safety assessment method based on uncertainty analysis, and belongs to the field of engineering structure performance assessment. The method comprises the following steps: firstly, acquiring acceleration of a structure under environmental vibration to obtain acceleration data; secondly, adopting a multi-reference-point covariance driven random subspace method and a convolutional neural network to automatically identify structural modal parameters and uncertainty thereof; then, taking the obtained uncertainty modal parameters as input, adoptinga Bayesian model correction method based on a progressive Markov chain Monte Carlo method (TMCMC) to correct an initial finite element model of the structure, and obtaining the urban masonry residence safety assessment model with the uncertainty parameters; and finally, carrying out safety evaluation on the model by considering the load effect and the structural parameter uncertainty at the sametime. According to the invention, an effective urban masonry residence safety evaluation model can be constructed, so that the goals of long-term safety management and disaster early warning of the residence are achieved.
Owner:ZHEJIANG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products