Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

1187 results about "Water stop" patented technology

A water stop is a break and a place to break for drinking water in sports events (sports competitions or training) for some types of sports, such as various long distance types of running (e.g., marathon), cycling, etc. Similarly, a water break is a break to drink water in some sports events held in one place.

Construction method of fully pouring tunnel invert

The invention relates to the field of construction of a tunnel invert, particularly relates to a construction method of fully pouring a tunnel invert, and solves the problems that the construction speed is low, the construction cost is high, and the construction quality does not achieve the requirements in the prior art. The construction method comprises the steps of measuring and lofting before excavating the tunnel invert, excavating the tunnel invert, preliminarily bracing the tunnel invert, primarily spraying concrete, and lofting an inverted arch steel locating bar; marking out a top elevation line of a small wall of the tunnel invert on a primary bracing surface of a lower bench, exerting force on inner and outer inverted rebars, and mounting a center concrete drainage pipe; mounting a set-shaped steel formwork at the tip of the tunnel invert; mounting a buried rubber water stop of a girth joint; mounting a longitudinal steel-edged water stop of the small wall of the tunnel invert; and pouring inverted arch concrete to construct by a slide chute, filling concrete into the tunnel invert to pour and finish the surface, circulating the procedures, and finishing the entire tunnel invert pouring construction. The construction method is low in construction cost, high in construction speed and strong in pertinence; the construction standard is improved; the construction quality is guaranteed; and the reference function is provided for specified construction of the tunnel invert of the domestic large cross-section passenger-dedicated tunnel at present.
Owner:CHINA RAILWAY 12TH BUREAU GRP +1

Bridge expansion joint device

The invention belongs to the technical field of bridge auxiliary members, and relates to a bridge expansion joint device. The bridge expansion joint device comprises left and right comb plate supporting beams, left and right comb plates, a water stop belt, left anchor bars and right anchor bars and further comprises a set of left supporting blocks and a set of right supporting blocks, wherein the set of left supporting blocks are distributed at intervals in the length direction of the left comb plate supporting beam and fixed through left comb plate fixing bolts, and the set of right supporting blocks are distributed at intervals in the length direction of the right comb plate supporting beam and fixed through right comb plate fixing bolts; a left water stop belt embedding base is fixed to one side, facing the right comb plate supporting beam, of the left comb plate supporting beam, a right water stop belt embedding base is fixed to one side, facing the left comb plate supporting beam and corresponding to the left water stop belt embedding base, of the right comb plate supporting beam, and the water stop belt is embedded between the left water stop belt embedding base and the right water stop belt embedding base. It is avoided that shear force on bolts of the left and right comb plates is generated in the heat expansion and cold contraction process of a bridge floor and a bridge abutment, the water stop belt is convenient to install and replace, operation intensity is relieved, and construction efficiency is improved.
Owner:常熟市双惠路桥工程构件有限公司

Adjustable water cofferdam

PendingCN107780423AAvoid enteringCreate a dry construction environmentFoundation engineeringWater stopCofferdam
The invention relates to an adjustable water cofferdam. The adjustable water cofferdam comprises a middle water retaining part used for retaining water in the width direction of a canal and two end water retaining parts arranged on two sides of the middle water retaining part respectively, wherein each end water stopping part comprises a fixed tank body and an inner water retaining structure mounted in the fixed tank body; the inner water retaining structure comprises an inner water stopping plate and a water stopping plate driving structure used for driving the inner water stopping plate to stretch and retract, and a foldable water stop structure used for spacing inside space of the fixed tank body in the stretching and retracting direction of the inner water retaining plate is arranged between the inner water retaining plate in the fixed tank body and the fixed tank body. When the water cofferdam is used on a lower slope, the inner water retaining plates in the end water retaining parts can be opened up to make up the insufficient height of the fixed tank bodies, and water is prevented from entering the inner side of the water cofferdam by passing by the inner side of the inner water retaining plates. Compared with the prior art, the adjustable water cofferdam can be adapted to slopes with more gradients and is wider in use range.
Owner:HENAN WATER CONSERVANCY CONSTR ENG

System for automatically draining water on side slope and method therefor

The invention provides a system for automatically draining water on a slide slope and a method therefor. The system comprises an energy storing device, a triggering device and a drainage device, wherein the energy storing device comprises a water storage tank, an energy storage tank, a water outlet pipe, a water stopping plug and the like; the triggering device comprises a suspension cylinder, a rigid suspension cylinder rod, a guide cylinder, an elastic connecting rope, a guide rod, a floating ball, a rigid pressing rod and the like; and the drainage device comprises a water pumping pipe, a drainage pipe and the like. The system is placed at the upper portion of a converging hole of a step of the side slope, when a water level in the converging hole reaches a designed automatic drainage starting water level, the triggering device is started, the water stopping plug is opened, water stored in the energy storage tank flows into the drainage pipe, and when the drainage pipe is filled with the stored water and the water stopping plug is closed, a siphonage phenomenon appears in the system, and accumulated water in the converging hole is discharged to the lower portion of the side slope through the water pumping pipe and the drainage pipe. According to the system, the structure is simple, energy sources such as electric energy, solar energy and wind energy are not required, the system is provided with no precise component or quick-wear part, good adaptability for drainage of various side slopes in the wild is achieved, drainage construction is achieved, the management is simple, the cost is low, and the drainage effect is good.
Owner:UNIV OF SCI & TECH BEIJING

Final joint water stop device and installation method

The invention belongs to the technical field of seabed immersed tunnel installation, and particularly relates to a final joint water stop device and an installation method. The final joint water stop device comprises a telescopic water stop belt, wherein the telescopic water stop belt is provided with a telescopic part, a first fixing part and a second fixing part, the first fixing part and the second fixing part are located at the two ends of the telescopic part correspondingly, the first fixing part is fixedly connected to the outer end face of an expanding section, and the second fixing part is fixedly connected to the peripheral face of a jacking section; before the jacking section is pushed out, the first fixing part is adjacent to the second fixing part, and the telescopic part is in a natural bending state between the first fixing part and the second fixing part; when the jacking section is pushed out, the jacking section drives the telescopic part to extend outwards; after the jacking section is pushed out in place, the telescopic part stretches out and flatly covers the peripheral face of the jacking section, and the stretchable length of the telescopic part is at least equal to the pushing-out distance of the jacking section. According to the final joint water stop device, sealing and water stopping between the jacking section and the expanding section during installation of a final joint are achieved, and the blank in the aspect of sealing and water stopping in construction of the final joint through a push-out type jacking section method is filled up.
Owner:CCCC FIRST HARBOR ENG +2

High and watery coastal area underground continuous wall connector water stop device

The invention belongs to the technical field of foundation pit supporting and relates to a high and watery coastal area underground continuous wall connector water stop device. Continuous wall horizontal ribs are mechanically connected with continuous wall vertical main beams. Steel flower pipes are bond to a first wall reinforcement cage in a lap joint manner. Galvanized sheet iron is installed on the outer side of an I-shaped steel plate. The galvanized sheet iron is welded to pressing bar steel bars in a spot welding manner. The I-shaped steel is connected with the first wall reinforcementcage in a welded manner. A U-shaped stirrup is connected with the single faces of the continuous wall horizontal ribs in a welded manner. Grouting pipes are bond to a second wall reinforcement cage ina lap joint manner. The second wall reinforcement cage is embedded and fixed in an I-shaped steel plate wing plate in a lifting manner. Sand bags are stacked on the outer side of an I-shaped steel plate connector web, and the lower filling height of the sand bags is the height of an underground continuous wall. The high and watery coastal area underground continuous wall connector water stop device is ideal in waterproof effect, concrete can be effectively prevented from streaming around, and due to the arrangement of the steel flower pipes, the water stop effect at the seam position is ensured.
Owner:QINGDAO TECHNOLOGICAL UNIVERSITY

Method for horizontal dynamic controlled-freezing water stopping between pipe roofs

The invention discloses a method for horizontal dynamic controlled-freezing water stopping between pipe roofs. The method comprises the steps that temperature measuring pipes are arranged in top pipes; a controlled-freezing pipeline system is laid in the top pipes; the controlled freezing pipeline system is connected with a freezing device; controlled-freezing operation is conducted on soil between the top pipes, and a waters-stopping frozen curtain is formed between the top pipes; after the requirement for water stopping does not exist between the top pipes, soil is unfrozen, and thaw settlement track grouting is conducted. The method for horizontal dynamic controlled-freezing water stopping between the pipe roofs has the advantages that the water stopping effect is good, the influence to the water surface is small, safety and reliability are achieved, and operation is easy and convenient. In addition, the method can be adopted in the severe complicated and special geological conditions with soft soil, high-pressure water and the like, so that the environment adaptability is high, and the method is particularly suitable for water stopping construction between the pipe roofs in the section where a building is arranged or the surface requirement is strict under the complicated geographical conditions.
Owner:CCCC SECOND HIGHWAY CONSULTANTS CO LTD

Method and device for replacing pipe section or valve on water supply pipeline without water stopping

The invention provides a method and a device for replacing a pipe section or a valve on a water supply pipeline without water stopping. The method comprises the following steps that pipeline flange plates and a pipeline cutting beveling machine are installed on the two sides of the to-be-placed pipeline or the valve, a pipeline seal bin is installed, thus the to-be-placed pipeline or the valve is located in a lower seal bin body of the pipeline seal bin, the to-be-placed pipeline is cut and beveled, and the replaced pipeline and the pipeline cutting beveling machine are taken out; and a connecting pipe fitting is placed into an upper seal bin body, the two ends of the connecting pipe fitting are connected with the pipeline flange plates on the two sides of the pipeline correspondingly, continuous action of the connecting pipe fitting and the pipeline flange plates is kept, the pipeline seal bin is detached, and the two ends of the connecting pipe fitting are fixed to the pipeline flange plates on the two sides correspondingly. With the adoption of the technical scheme, the partial pipe section or the valve is replaced without water stopping, and through the method, no opening is formed in the original water supply pipeline and no damage is caused to other structures while uninterrupted water supply is ensured.
Owner:SHENZHEN WATER TECH SERVICE CO LTD

Construction method of stiffening core curtain pile and wall protection pile anchor combined supporting structure

The invention discloses a construction method of a stiffening core curtain pile and wall protection pile anchor combined supporting structure. The supporting structure comprises concrete cast-in-placepiles and a water stop curtain, wherein the water stop curtain is a high-pressure rotary jet pile water stop curtain; a shape steel stiffening core is driven into the water stop curtain along the axis to form a stiffening core water stop curtain; the stiffening core water stop curtain and the concrete cast-in-place piles are arranged at intervals and meshed to be arranged in a straight line, theconcrete cast-in-place piles and the stiffening core water stop curtain are connected into a whole through top beams, and the waist of each concrete cast-in-place pile is connected with a waist beam;and prestressed anchor rods are installed on the waist beams between every two adjacent concrete cast-in-place piles. The method accords with the stress characteristic of the supporting structure, thestrength of the stiffening core water stop curtain is fully utilized on the premise of meeting the water stop requirement, the rigidity and strength of the combined pile supporting structure are improved, deformation of the side wall of a foundation pit can be better controlled, materials are saved under the same deep foundation pit condition, the shape steel stiffness core can be recycled, the cost is reduced, and underground space pollution caused by the shape steel stiffness core left underground is avoided.
Owner:DALIAN UNIV OF TECH

Water stop belt and deformation joint waterproof structure

The invention relates to the field of building waterproofing and discloses a water stop belt and a pipe gallery deformation joint waterproof structure. The water stop belt comprises a waterproof layerand a lining layer in the thickness direction and an extending-and-retracting portion and connection portions in the width direction, wherein the waterproof layer is arranged on one or more faces ofthe lining layer in a covering manner; and the extending-and-retracting portion is located in the middle, and the connection portions are located at the two sides. The extending-and-retracting portionis folded, so that an extendable-and-retractable structure is formed. The strength and rigidity of the material of the lining layer are greater than those of the waterproof layer. The waterproof layer and the lining layer are compounded in the water stop belt; the stress generated by the vast majority of self weight on the extending-and-retracting portion of the water stop belt is borne by the lining layer, and thus the fatigue and aging problems of the waterproof layer are avoided to a great extent; the service life of the water stop belt can be prolonged; by means of physical deformation ofthe extending-and-retracting portion of the water stop belt, deformation, caused by differential settlement, of a pipe gallery can be resisted against; after deformation is generated, the strength, sealing performance and material performance are not affected; the waterproof effect can be achieved better; and the water stop belt is particularly applicable to deformation joint waterproofing of thecomprehensive pipe gallery.
Owner:CHINA 19TH METALLURGICAL CORP

Structure form of final joint of immersed tunnel

The invention discloses a structure form of a final joint of an immersed tunnel and relates to the technical field of communication and transportation. A foundation pad is provided with adjacent long pipe sections on the two sides. The adjacent long pipe sections on the two sides are both provided with jack pushing systems. The end face on one side of one of the adjacent long pipe sections on the two sides is in a wedge shape, the end face on the other side of the other one of the adjacent long pipe sections on the two sides is a vertical end face, and the end faces on the two sides are both provided with steel end shells. A single-sided wedge-shaped block is inserted between the end faces on the two sides of the adjacent long pipe sections on the two sides. The end faces on the two sides of the adjacent long pipe sections on the two sides are provided with the first steel end shells. GINA water stops are mounted on the peripheries of the first steel end shells. The adjacent long pipe sections on the two sides are both internally provided with end sealing walls. The two sides of the single-sided wedge-shaped block are provided with second steel end shells. The immersed final joint is small in structure size and convenient to prefabricate, and the construction quality can be ensured easily; through the double-sided wedge shape, the construction difficulty is low, compression of the water stops is facilitated, and the final joint block is not liable to be squeezed out by water pressure; and the construction speed of underwater mating of prefabricated parts is high.
Owner:CHINA RAILWAY LIUYUAN GRP CO LTD

Bridge durability dustproof sliding plate stretching device and construction method thereof

The invention discloses a bridge durability dustproof sliding plate stretching device which comprises a stretching joint component and a stretching plate, wherein one end of the stretching plate is fixed on one side of the stretching joint component through an anchoring bolt, and the other end of the stretching plate is tightly attached to the other side of the stretching joint component and covers the stretching joint of the stretching joint component. The invention also discloses a bridge durability dustproof sliding plate stretching device and a construction method thereof. The bridge durability dustproof sliding plate stretching device has the advantages that when the beam body stretches and deforms, a comb-tooth-shaped steel plate slides along with the beam body, and the stretching plate slides along with the beam body, so that the self-stretching of the stretching plate is realized; the stretching joint is covered by the stretching plate, so that the dust-proof effect is achieved, a water stop belt can be prevented from aging in the expose to the sun, the service life of the stretching joint component is prolonged, and the top of the stretching plate is flush with the top ofconcrete pouring, so that the bridge deck is flat, and the traveling comfort is good; one end of the stretching plate is designed into a wedge-shaped structure, and sand particles cannot be accumulated at the stretching joint, so that the stretching joint can work normally for a long time.
Owner:XIAN HIGHWAY INST

Pipe segment waterproof structure for pipe seam expansion and construction method

The invention relates to a pipe segment waterproof structure for pipe seam expansion. The pipe segment waterproof structure for the pipe seam expansion comprises a pipe segment, a first waterproof sealing pad, a second waterproof sealing pad, a first water expansion water stop strip, a second water expansion water stop strip, a joint material, surface grouting holes, first pipe seam grouting holes, second pipe seam grouting holes, grouting openings, main grouting pipes, branch grouting pipes, weak current circuit wires, an indicator lamp a, an indicator lamp b and an external battery. The first water expansion water stop strip, the first waterproof sealing pad, the second water expansion water stop strip, the second waterproof sealing pad and the joint material are arranged in a peripheralabutted seam of the pipe segment in sequence from outside to inside. The pipe segment waterproof structure for the pipe seam expansion has the beneficial effects that a pipe segment grouting system is independent, and the pipe seam is repaired in a partitioned and targeted mode; multiple waterproof measures are set, and the emergency waterproof quality is ensured; the special pipe segment is prefabricated in a factory, and the quality of the pipe segment is guaranteed; a waterproof warning system is set, and the water leakage situation is grasped immediately; and multiple grouting hole channels are reserved, and quick sealing of water leakage is achieved.
Owner:杭州临安中民筑友智造科技有限公司

Middle buried type water stop belt installation die and installation method thereof

The invention provides a middle buried type water stop belt installation die and belongs to the technical field of building construction. The middle buried type water stop belt installation die comprises a water stop belt, die plates, connecting steel bars and steel bar nets, the water stop belt is provided with a center circular ring part with the section in a circular ring shape, the multiple die plates are spliced to form a clamping space, the connecting steel bars are connected with the steel bar nets and the die plates, all the die plates are connected to the outer side faces of the steelbar nets, and therefore a pouring space is formed. An installation method of the installation die is used, positioning on the water stop belt is achieved through the die plates and clamping plates, and it is ensured that the position of the water stop belt cannot be deflected in the process of pouring concrete and tamping the concrete. By means of the installation method of the middle buried typewater stop belt, the defects existing in the prior art are overcome, and the work efficiency of the installation die is also improved.
Owner:CHINA FIRST METALLURGICAL GROUP

Test method and device for testing sealing property of pipe-jacking construction device

The invention provides a test method and device for testing the sealing property of a pipe-jacking construction device. The two ends of a receiving bin are provided with sealing rings and connected with a pressure stabilizing bin to form a pipe-jacking receiving device. A casing pipe is installed at the rear end of the pipe-jacking receiving device. A starting opening water stopping sealing device is installed at the rear end of the casing pipe, and pipe joint sets are jacked forward in sequence to enable the front ends to enter the receiving bin and the rear ends to be located outside the casing pipe, so that a sealing cavity is formed between the casing pipe and the pipe joint sets, and a sealing cavity is formed between the pipe-jacking receiving device and the pipe joint sets; the two sealing cavities are filled with mud to simulate a mud sleeve; the pipe joint sets are jacked and pressed, then the two sealing cavities are inflated and pressurized till air pressure is equal to stratum water pressure verified through testing, and whether mud overflows from the outside of the starting opening water stopping sealing device, joint positions in the pipe joint sets and the outside of the pipe-jacking receiving device is observed. According to the method, before construction is carried out, the sealing property of a pipe-jacking construction device can be tested in advance, and the test device is low in cost, convenient to operate and capable of testing the sealing property of the pipe-jacking construction device under the high water pressure condition.
Owner:CHINA UNIV OF GEOSCIENCES (WUHAN)

Basement top plate deformation joint waterproof system and technology

The invention relates to the technical field of underground construction waterproof protection, in particular to a basement top plate deformation joint waterproof system and technology. The basement top plate deformation joint waterproof system comprises a buried type water stop belt used for preventing external water from entering a deformation joint, a deformation joint backer plate with which the deformation joint is filled, an externally-bonded type metal plate pressure-bearing water stop belt used for sealing the deformation joint, and a waterproof structure used for preventing water for the externally-bonded type metal plate pressure-bearing water stop belt. According to the basement top plate deformation joint waterproof system, by arranging the externally-bonded type metal plate pressure-bearing water stop belt, environment water isolation treatment is carried out on a waterproof weak joint of the building underground construction top plate deformation joint, the waterproof structure is laid on the deformation joint, has the certain performance guarantee and can bear a certain environment pressure, and the effect of joint enhancement is achieved.
Owner:BEIJING ORIENTAL YUHONG WATERPROOF ENG

High-rise building basement roof settlement post-pouring joint advanced water stop construction method

The invention relates to a building engineering construction method, in particular to a high-rise building basement roof settlement post-pouring joint advanced water stop construction method. The construction method includes the steps that the two sides of a post-pouring joint are chiseled and cleaned; a formwork and a supporting system are erected on the lower portion of the post-pouring joint; waterproof coiled materials are laid at positions, on the two sides of the post-pouring joint, of a basement roof; walls are built on the waterproof coiled materials respectively; the upper portions of the walls are covered with reinforced concrete cover plates; an underground body structure waterproof layer is constructed; backfill construction is carried out; post-pouring joint concrete is poured. The construction method has the advantages that a basement roof waterproof layer, a protective layer and outdoor backfill can be integrally constructed and are prevented from being interfered by basement roof post-pouring joint construction, and the construction quality of an underground waterproof structure is guaranteed. Impurities, rainwater and water for construction are effectively prevented from flowing into a basement through the post-pouring joint.
Owner:CHINA 22MCC GROUP CORP

Synchronous tunnel grouting and drainage construction method for controlling ground heaving

ActiveCN110985055APrecise control of tunnel precipitationAccurate Precipitation ControlUnderground chambersDrainageWater stopPore water pressure
The invention discloses a synchronous tunnel grouting and drainage construction method for controlling ground heaving. The method comprises the following steps that rotary spraying piles are arrangedfrom the ground surface to the two sides of a tunnel to form water stop curtains; after tunnel support is finished, drilling and grouting are carried out above the tunnel face to form an advanced reverse curved arch connecting the water stop curtains on the two sides; after the advanced reverse curved arch is formed, a drainage channel is drilled at the bottom of the advanced reverse curved arch along the tunneling direction, and accumulated water is drained through the drainage channel; and full-section grouting operation is carried out on the tunnel while opening of the drainage channel is guaranteed. The advanced reverse curved arch is in the shape of an arc which is opened towards the ground, water accumulation is easy, and the drainage effect is good after a hole is drilled at the bottom; the originally closed grouting system can be opened by reserving the drainage channel at the bottom of the reverse curved arch, so that drainage work can be synchronously carried out during tunnel advanced pouring construction, excess accumulated water in the stratum is further squeezed and drained by utilizing the lifting effect of grouting, excess pore water pressure caused by grouting construction can be remarkably reduced, and the purpose of preventing excessive ground heaving is achieved.
Owner:中铁南方投资集团有限公司 +1

Construction method for subsurface excavated underground pipe rack and storage well

ActiveCN106545343ASolve world-class engineering problemsHigh speedArtificial islandsUnderwater structuresRoad surfaceEngineering
The invention relates to a construction method for a subsurface excavated underground pipe rack and storage well. Construction of the pipe rack and storage well is conducted through a reverse construction method in a subsurface excavation manner, reinforced concrete bearing piles, plain concrete water stop piles and reinforced concrete support piles are engaged with one another to be used as the wall of the pipe rack and storage well, a water storage well is arranged at the bottom of a pipe rack to be used for flood prevention, water storage and water resource secondary utilization of seaside cities, and seasonal water in a soil layer can effectively seep and be discharged through water seepage holes formed in the wall. By means of the technical scheme, the world-class engineering problem of successfully implanting the pipe rack in the underground portion of an old city on the premise of less influencing the city road surface traffic is solved, the comprehensive structure of the underground pipe rack and storage well which is high in speed, low in manufacturing cost and short in period and is obtained through subsurface excavation is provided for the seaside city construction in China, and therefore the construction method has wide market prospects and social value.
Owner:江西中恒地下空间科技有限公司

Water stop section for crossing floor layer installation of building drainage pipeline and installation method of water stop section

PendingCN111237550AAvoid corrosionNo change in water flow patternPipesRubber ringWater stop
The invention discloses a water stop section for the crossing floor layer installation of a building drainage pipeline and an installation method of the water stop section. The water stop section includes a water stop section body, a flange gland, a sealing ring sleeve, a sealing rubber pad, a sealing rubber ring and a fastening bolt, the water stop section body and the flange gland are assembledin a fastened mode by the fastening bolt, the inner cavity of the water stop section body is connected with the sealing ring sleeve by the sealing rubber ring in a sealed mode, and the sealing ring sleeve and the flange gland are connected in a sealed mode through the sealing rubber pad inside of the sealing ring sleeve. The risk that water leakage is prone to occurring at openings in the two endsof an embedded connecting pipe or a center-adjustable embedded connecting pipe structure is avoided, a bolt connection fastening method of a T-shaped groove formed in the water stop section body witha cross groove of a flange pressure plate long bolt hole is adopted, when the position of the water stop section poured on a reinforced concrete floor is deviated, the installation position of the pipeline can be conveniently adjusted in any horizontal direction by displacing adjustment to ensure the verticality of the vertical pipe installation, the product structure is simplified, the manufacturing cost is reduced, and the efficiency of installation and construction are improved.
Owner:广州观景文化科技有限公司

Mounting method and mounting device for embedded water stop

The invention provides a mounting method and a mounting device for an embedded water stop, and belongs to the technical field of building waterproof construction. The mounting method for the embeddedwater stop comprises the following steps of: acquiring mounting information, and arranging an adaptive mounting device; mounting the embedded water stop on the mounting device, and keeping the mounting device in a clamping state; mounting the embedded water stop to a deformation joint by using the mounting device; and fixing the mounting device to the deformation joint. The mounting device comprises a clamping piece and a bolt assembly, wherein the clamping piece can be used for being clamped on a hollow cavity of the embedded water stop and is fixed to a template on one side of the deformation joint through a split bolt; and the bolt assembly is arranged on the clamping piece and is used for keeping the clamping piece in a state of clamping the embedded water stop. By the mounting device,the mounting precision of the embedded water stop is guaranteed, and the embedded water stop can be attached and clamped well; and the embedded water stop is fixed to the template of the deformationjoint through the split bolt, and is fixed firmly. The mounting method and the mounting device are convenient to mount and fix, and can be detached and recycled, and the cost is saved.
Owner:CHINA FIRST METALLURGICAL GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products