The invention discloses a construction method of aqueducts above a bridge. The construction method comprises the steps of support arrangement, technological process, construction method, support prepressing,
aqueduct supporting frame dismantling, support construction safety protection, formwork
engineering construction method,
steel bar engineering, concrete construction, formwork dismantling and road and bridge support constructing. The road and bridge supports comprise two
layers of H-shaped steel, chain blocks and a support body, wherein the H-shaped steel is arranged on the two sides of a stand column, the H-shaped steel on the lower layer is tensioned and fixed to the stand column through the chain blocks, the H-shaped steel on the upper layer is vertically installed on the H-shaped steel on the lower layer, and then the support body is erected on the H-shaped steel on the upper layer. The support arrangement is composed of two steps of super-large load formwork technical parameters design and
supporting system design. According to the technological process,
aqueduct columns, longitudinal and transverse beams and
aqueduct bodies are constructed separately; the construction method comprises the steps of foundation treatment of the
supporting system, support erection and support inspection and acceptance; the formwork construction method comprises the steps that longitudinal and transverse formworks are installed; and the reinforcing
steel bar engineering comprises two steps of reinforcing
steel bar storage and reinforcing steel bar installation.