The invention provides an intelligent scheduling and control implementation method for deterministic time
delay service, and aims to solve the problems that a conventional network cannot realize deterministic time
delay service transmission and cannot meet the requirements of cooperative application on the upper bound of deterministic time
delay jitter. According to the method, a time delay service and an end-to-end time delay demand are determined through configuration of a forwarding equipment
management plane in a network, an identifier and
timestamp information of a deterministic time delay service during transmission are defined, a network node selects a forwarding path and a sending time slice for the deterministic service based on the time delay demand and a
clock stamp, and end-to-end deterministic time delay is realized. The network node adjusts the number of forwarding queues and scheduling period parameters according to the forwarding condition of the deterministic time delay service, adapts to the transmission of the deterministic time delay service, and improves the overall
transmission performance. Besides, a reliable and sequential transmission mechanism for the determined time delay service is realized through the serial number of the data packet,
reliable transmission is realized through packet-by-packet confirmation,
packet loss and overtime feedback mechanisms, and the copy and
elimination of the deterministic time delay service are realized.