The invention discloses a steel strand inhaul
cable tension construction method by taking a slip-resistant stud as a locking device. When one side, with the slip-resistant stud, of each steel strand is tensioned, the side, without the slip-resistant stud, of the steel strand is tensioned as well, the tensioning force applied on the side with the slip-resistant stud is always kept larger than that applied on the side without the slip-resistant stud, and the difference between the tensioning force on the two sides is as 1-2 times as actually measured
frictional resistance; when the side, with the slip-resistant stud, of each steel strand is tensioned to reach monitored target cable tensioning force fc, anchoring is performed firstly, the tensioning force fk of the side, without the slip-resistant stud, of the steel strand is decreased to target cable tensioning force, and then anchoring is performed again to finish the tension construction of the steel strand inhaul cable. The steel strand inhaul
cable tension construction method by taking the slip-resistant stud as the locking device has the advantages that a mounting method is optimized, cable force, on two outer sides of a
tower column, of each steel strand is enabled to be identical, the slip-resistant stud is enabled to be tightly attached to the
tower column and to be provided with enough pressure storage, internal force, on two sides of the
tower column, of each steel strand is enabled to be identical, safety of the integral inhaul cable is improved, locking force of the slip-resistant stud is more reliable, on-site construction is facilitated and less prone to going wrong, and ultra-tensioning-force is prevented from affecting the integral structure largely.