The invention discloses a carbonaceous
schist tunnel blasting method and construction method. The carbonaceous
schist tunnel construction method includes the steps of carrying out blasting in the carbonaceous
schist tunnel blasting method, clearing away residues and digging out rock
mass which does not fall off by using
mechanical equipment, and revising a tunnel
contour line. The carbonaceous schist tunnel blasting method includes the steps of dividing a tunnel face into a carbonaceous schist area and a none-carbonaceous schist area; arranging a plurality of blast holes in the tunnel face to form a hole pattern, wherein the density of the blast holes in the carbonaceous schist area is smaller than that of the blast holes in the none-carbonaceous schist area; filling explosives and detonators into the blast holes; connecting the detonators into a network; detonating the explosives according to a preset detonating sequence. The tunneling method of combining blasting and machinery is adopted, blasting is carried out first, rock does not need to be thrown out completely, and therefore disturbance and damage to surrounding rock are reduced; then the residues are cleared away and the rock
mass which does not fall off is dug out by using the
mechanical equipment, thus, tunneling efficiency can be improved, disturbance to the surrounding rock is little, and damage on the surrounding rock is reduced; in addition, the back break
control effect is good, the tunneling effect is improved, and tunneling quality is high.