The invention discloses a strip mine
drilling and blasting design, construction and management method. The method comprises the steps that drilling design is conducted automatically within a planed range, and a drilling coordinate report is automatically formed; drilling coordinates are transmitted to an automatic
drilling system through a
wireless terminal; and after drilling is completed, actual drilling coordinates and hole depth
information data are automatically transmitted to a mining MES, and
drilling and blasting design is automatically conducted. By adoption of the strip mine
drilling and blasting, construction and management method, the drilling design efficiency is improved, it is guaranteed that construction on the site is conducted according to the design, a drilling
standard operation procedure is automatically generated,
semi automation of drilling and blasting design is achieved by adoption of
software assistance, the design efficiency is extremely improved, the previous two-dimensional
software design is replaced with three-dimensional
software design, the design is more visualized, and the morphology of an ore body is understood more authentically through a three-dimensional profile. The blasting design is more close to actual situations through importing of measured data.