Strip mine drilling and blasting design, construction and management method

A management method and technology of open-pit mines, applied in the direction of drilling equipment and methods, blasting, drilling equipment, etc., can solve problems such as low work efficiency, easy to make mistakes, and lack of comprehensive management methods, so as to achieve visual design and improve design efficiency Effect

Inactive Publication Date: 2017-05-10
CHINA GOLD INNER MONGOLIA MINING
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to solve the problem that existing mining production management relies more on human experience for overall planning, there is no systematic, intuitive and advanced comprehensive management means; mining perforation design mainly focuses on the layout of blast holes and the calculation of loss rate and dilution rate; The method of hole layout in mining design uses GPS to place points on site, and the drilling machine finds points to perforate; the work efficiency is low and mistakes are easily made, which is not conducive to the loss and dilution of large-scale outsourced mining and the control of ore grade control.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Strip mine drilling and blasting design, construction and management method
  • Strip mine drilling and blasting design, construction and management method
  • Strip mine drilling and blasting design, construction and management method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0024] exist figure 1 In the process, according to the monthly mining and stripping plan, the grade control model loaded into the status constraints is colored according to the ore-rock attributes, and then the blasting zone is further refined according to the ore-rock boundary, and the blasting zone is finally determined by the ore-rock boundary control function area, to realize the separation and explosion of ore and rock, through figure 2 Calculate the lo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a strip mine drilling and blasting design, construction and management method. The method comprises the steps that drilling design is conducted automatically within a planed range, and a drilling coordinate report is automatically formed; drilling coordinates are transmitted to an automatic drilling system through a wireless terminal; and after drilling is completed, actual drilling coordinates and hole depth information data are automatically transmitted to a mining MES, and drilling and blasting design is automatically conducted. By adoption of the strip mine drilling and blasting, construction and management method, the drilling design efficiency is improved, it is guaranteed that construction on the site is conducted according to the design, a drilling standard operation procedure is automatically generated, semi automation of drilling and blasting design is achieved by adoption of software assistance, the design efficiency is extremely improved, the previous two-dimensional software design is replaced with three-dimensional software design, the design is more visualized, and the morphology of an ore body is understood more authentically through a three-dimensional profile. The blasting design is more close to actual situations through importing of measured data.

Description

technical field [0001] The invention relates to the field of open-pit mining design and construction management, in particular to an open-pit mine blasting design, construction and management method. Background technique [0002] At present, in formulating production plan management, mining stripping construction plan, mining design and ore supply and distribution management, people rely more on human experience for overall planning. Without a systematic, intuitive and advanced comprehensive management method, it is difficult to ensure production planning, mining The interconnection of stripping construction plan, mining design and mine supply management is completely smooth and free of omissions. In addition, in terms of implementation methods, due to the large number of mining pit operators, the wide range of points, and the long duration of the alpine climate, it is impossible to monitor the situation and safety status of each operating point on the site in real time; the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21C41/26E21B7/00F42D1/00F42D3/04
CPCE21C41/26E21B7/00F42D1/00F42D3/04
Inventor 张海涛王泽军王恒生李晨王骞梁海明
Owner CHINA GOLD INNER MONGOLIA MINING
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products