Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

37 results about "Dry stone" patented technology

Dry stone, sometimes called drystack or, in Scotland, drystane, is a building method by which structures are constructed from stones without any mortar to bind them together. Dry stone structures are stable because of their unique construction method, which is characterized by the presence of a load-bearing façade of carefully selected interlocking stones.

Face plate rock-fill dam structure of reasonably utilizing sand gravel material and construction method thereof

The invention relates to a face plate rock-fill dam structure of reasonably utilizing sand gravel material and a construction method thereof. The invention aims at providing a face plate rock-fill damstructure of reasonably utilizing sand gravel material and a construction method thereof; a sand gravel material near a dam site is put in a drying area of the middle part of a dam body so as to avoid additionally open up a rock-fill material field and protect the biological environment. The face plate rock-fill dam structure of reasonably utilizing sand gravel material is provided with a dam main body; the upstream side of the dam main body is sequentially laid with a transition layer, a cushion layer and a face plate from inside to outside; a special cushion layer is arranged below the cushion layer; a dam base of the upstream side of the main body is provided with a rock ballast backfill area and a silt backfill area, the downstream side of the main body is provided with a dry stone pitching, and a downstream dam base is provided with an oversize stone pressing stone area; and the main body comprises a main rock-fill area and a secondary rock-fill area, a sand gravel area positioned above a seepage line is arranged in a hollow cavity surrounded by both the main rock-fill area and the secondary rock-fill area, and the bottom part of the sand gravel area and the low altitude position of a downstream surface are provided with inverted filter protection layers. The invention is used in face plate dam engineering of the natural sand gravel material near the dam site.
Owner:POWERCHINA HUADONG ENG COPORATION LTD

Concrete excess material recycling treatment system

The invention relates to a concrete excess material recycling treatment system which comprises an excess material collecting device, a sand-stone separating device, a drying device, a ball milling device and a slurry treatment device, and the excess material collecting device is arranged on the upper portion of the sand-stone separating device and used for collecting concrete excess materials. Theslurry treatment device is arranged below the sand-stone separating device and used for treating separated slurry, the drying device is connected to one side of the sand-stone separating device and used for drying separated stones, and the ball milling device is connected to one side of the drying device and used for carrying out surface ball milling treatment on the dried stones. The stones aredried and then subjected to ball-milling treatment, so that adhered substances on the surface are removed, and accordingly the quality of separated aggregates is improved. The concrete excess materialrecycling treatment system has the effect of improving the quality of the aggregates separated from the concrete excess materials.
Owner:汉中尧柏磊金节能环保建材有限公司

Environment-friendly recycling equipment for stone waste and waste utilization method thereof

The invention discloses environment-friendly recycling equipment for stone waste and a waste utilization method thereof, and relates to the technical field of stone processing. The device comprises amounting base plate, a sorting mechanism, a drying mechanism, a crushing mechanism and a transferring mechanism; a sorting mechanism used for sorting non-stone impurities with the density smaller thanthat of water in stone, a drying mechanism used for drying stone waste after the stone waste is soaked in water and a smashing mechanism used for conducting iron removal, screening and smashing on the dried stone are sequentially and fixedly arranged at the top of the mounting base plate from left to right, and transfer mechanisms used for transferring stone are fixedly arranged at the tops of the sorting mechanism and the drying mechanism. The sorting mechanism is arranged, water is added into the water tank, stone to be sorted is placed on the movable plate corresponding to the water tank,the electric push rod corresponding to the water tank is started to drive the fixed plate to descend into the water tank for sorting, so that impurities with the density smaller than that of water inthe stone float on the water surface, and a worker salvages the impurities; and the quality of the product recovered in the later period is ensured.
Owner:SHENZHEN UNION STONE DECORATION TECH

Mixed anti-seepage dam

The invention discloses a mixed anti-seepage dam. The mixed anti-seepage dam comprises an upstream lower rockfill material, a downstream lower rockfill material, an upstream upper rockfill material, adownstream upper rockfill material, a dry stone revetment, transition materials, an asphalt concrete core wall, a concrete base, curtain grouting and a wave wall, wherein the asphalt concrete core wall is arranged in the transition materials positioned between the upstream lower rockfill material and the downstream lower rockfill material; a high-strength reinforced geomembrane is arranged in thetransition materials positioned between the upstream upper rockfill material and the downstream upper rockfill material to replace the asphalt concrete core wall; the upper half part of a traditionalasphalt concrete core wall dam is changed into the high-strength reinforced polyethylene geomembrane, and the anti-seepage effect is achieved through the watertightness of the geomembrane; and the upstream rockfill material and the downstream rockfill material are rockfill materials with the large deformation modulus. The dam body is simple in form and high in construction speed, the requirementfor the upstream rockfill material and the downstream rockfill material is low, and the mixed anti-seepage dam has good popularization value for projects with insufficient dam building materials in dam site areas.
Owner:CHINA WATER RESOURCES BEIFANG INVESTIGATION DESIGN & RES

Stone waste processing equipment

The invention discloses stone waste processing equipment. The stone waste processing equipment comprises a feed conveying frame, a material crushing mechanism connected with a discharge port of the feed conveying frame, a guide mechanism connected with a discharge port of the material crushing mechanism and a material smashing mechanism arranged at a discharge port of the guide mechanism. The stone waste processing equipment directly crushes broken stones and feeds the crushed stones into the smashing mechanism to be smashed. Moreover, a high-temperature medium for drying carries out heat conduction through a stainless steel inner sleeve to dry stone powder without direct contact with the stone powder, and discharged waste gas does not need to be subjected to dust removal treatment in thecrushing process. Besides, an outer sleeve gradually decreases from a feed section to a discharge section, water vapor generated in the crushing process of the stone powder is squeezed from the discharge section to the feed section and finally passes through a guide pipe, the stone powder adhering to water vapor is blocked by the broken stones and adheres to the surfaces of the broken stones to gointo the crushing mechanism for crushing along with the broken stones again, the environment is effectively protected, and environmental pollution is reduced.
Owner:福建惠安新然石材有限公司

Precast clamp slot type hollow brick and ecological land ridge

InactiveCN102668761AImprove stabilityRetain water permeabilitySoil-working methodsBrickEngineering
The invention discloses a precast clamp slot type hollow brick with low manufacturing cost and simple structure. The hollow brick comprises a brick body; a convex outer clamp slot is arranged on one side of the brick body; and an inward-sinking inner clamp slot is arranged on the other side of the brick body. The invention also discloses an ecological land ridge which comprises an ecological land ridge main body; the ecological land ridge main body is formed by splicing the precast clamp slot type hollow bricks; and plants are grown in the holes of the precast clamp slot type hollow bricks. The precast clamp slot type hollow brick disclosed by the invention is a basic composition unit of the ecological land ridge; the precast clamp slot type hollow bricks are spliced through respective inner clamp slots and outer clamp slots, and the cement mortar is not needed for bonding, thus the material and labor force are saved. Multiple precast clamp slot type hollow bricks are spliced through the clamp slots and built into a complete land ridge according to a lattice wall building method, thus the water permeability of the dry-stone land bridge is maintained while improving the overall stability of the ecological land ridge. Moreover, plants can be grown in the holes of the hollow brick body.
Owner:INST OF MOUNTAIN HAZARDS & ENVIRONMENT CHINESE ACADEMY OF SCI

Overflow slag collection weir for water conservancy and hydropower projects and its construction method

The invention discloses an overflow slag collection weir for water conservancy and hydropower projects and a construction method thereof, belonging to the technical field of design and construction of buildings for water conservancy and hydropower projects. Provided is an overcurrent slag collection weir for water conservancy and hydropower projects, which is convenient for collecting construction slag, has a simple structure, and does not cause river channel siltation, and a construction method thereof. The over-current slag collection weir includes an over-current weir body and an over-current protection structure laid outside the over-current weir body. In the construction method described above, gravel slag and riprap are thrown in the natural river channel to form a weir; On the upstream side of the weir body, dry stone slope protection is constructed, and geotextiles are laid on the weir crest, the downstream side of the weir body and the platform at the foot of the slope; The concrete section of the foot platform and its anti-scour piles and connecting beams and slabs; finally, the reinforced gabion permeable and anti-scour pressing body is constructed to complete the construction of the overflow slag collection weir.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE

Imitated double-lotus baluster in ancient buildings and production technology of imitated double lotus baluster

The invention discloses an imitated double-lotus baluster in ancient buildings and a production technology of the imitated double lotus baluster. The production technology comprises the steps as follows: (1) a parent part is produced from gypsum with a genuine double-lotus baluster part as a model; (2) an outer mold is produced; (3) the parent part is placed in the middle of the outer mold and covered with silica gel, and an inner silica gel mold is prepared; (4) iron oxide pigment and cement are uniformly mixed, dry stone powder, water and a water reducer are added, the mixture is uniformly mixed, and a cement stone material is prepared; (5) the inner silica gel mold is placed outside the outer mold and filled with the cement stone material; (6) a semi-finished imitated double-lotus baluster product is cured; (7) the semi-finished imitated double-lotus baluster product is subjected to sand blasting treatment and drying; (8) the outer surface of the semi-finished imitated double-lotusbaluster product is subjected to old making treatment; and (9) a stone protective agent is sprayed onto the semi-finished imitated double-lotus baluster product and a finished imitated double-lotus baluster product is produced. The imitated double-lotus baluster which is cheap and widely sourced can be produced with the production technology of the imitated double-lotus baluster in the ancient buildings.
Owner:德清红朝岗石科技有限公司

Dry stone slope fruit cultivation and forestation technique

InactiveCN102388784ASolve the key technical problems of low survival rate of afforestationLess investmentClimate change adaptationAfforestationFruit treeEarth surface
The invention relates to a dry stone slope fruit cultivation and forestation technique and belongs to the field of fruit and fruit-bearing forest cultivation management. The dry stone slope fruit cultivation and forestation technique comprises the steps of: building a stone weir; filling stone weir gap soil; laying water gathering films; filling cultivation soil; planting fruit trees; covering the ground surface with films; covering the films with soil; covering with anti-aging reflecting films; fixing the covering films with soil bags; and opening field planting water seeping ditches. The dry stone slope fruit cultivation and forestation technique has the advantages that the design is novel, the structure is unique and the application scope is wide; the key technical problem that the survival rate of forestation trees planted on dry stone slopes is low is thoroughly solved; the investment is small, the method is easy to operate and the effect is taken rapidly; and the practicability and the easiness in popularization are extremely high.
Owner:BEIJING UNIV OF AGRI

Quick-drying stone-like paint, quick-drying thick stone-like paint stone-like sheet and preparation method thereof

The invention provides quick-drying stone-like paint, a quick-drying thick stone-like paint stone-like sheet and a preparation method thereof. The quick-drying stone-like paint is prepared from mixedemulsion and natural color sand or sintered color sand, wherein the weight ratio of the mixed emulsion to the natural color sand or sintered color sand is 1 : (2 to 4); the mixed solution is preparedfrom 55 to 65 percent of film-forming resin, 15 to 25 percent of a low-viscosity hydroxyethyl cellulose ether water solution, 1 to 1.5 percent of a thickener, 0.3 to 0.5 percent of a PH (Potential ofHydrogen) regulator, 10 to 25 percent of water and the balance of an assistant; the film-forming resin is a mixture of thermosetting acrylic resin, water-borne thermosetting amino resin and thermoplastic acrylic resin of which the glass transition temperature is smaller than or equal to 5 DEG C; the thickener is one or a mixture of several of an alkali swelling thickener or a polyurethanes thickener. According to the quick-drying stone-like paint provided by the invention, the thermosetting acrylic resin and the water-borne thermosetting amino resin are capable of enabling bubbling not to appear in a coating layer and air holes not to be form in the surface of the coating layer while the coating layer is quickly cured and dried at high temperature, so that defects of the prior art are overcome.
Owner:亚士创能新材料(滁州)有限公司

Dry stone particles with simulation effect, rock plate and preparation method and application of rock plate

The invention belongs to the technical field of brick product coatings, and discloses dry stone particles with a simulation effect, and a rock plate, and a preparation method and an application thereof, and the product ismainly prepared from a main flux, a high temperature raw material, a fluxing agent, a filler and cerium oxide. The main flux is potassium feldspar, the quartz is a filler and plays a role of a skeleton structure, and the addition of the cerium oxide not only enables the dry stone particles to have a colorful flashing effect, but also is helpful for reducing the high-temperature viscosity of the dry stone particles. In addition, the boehmite, the zinc oxide, the dolomite and the calcite are used as fluxing agents, so that the viscosity of the dry stone particles at high temperature is reduced, and the leveling effect is good; barium carbonate and aluminum oxide are used as high-temperature raw materials, so that the initial melting point of the stone dry particles is increased. The obtained dry stone particles can be used as one of preparation raw materials of the rock plate, are moderate in permeability and distinct in gradation, have the simulation effect and thethree-dimensional effect of real stone dry particles, have the performance requirements for a high initial melting point, proper high-temperature viscosity and the like, and are wide in application prospect.
Owner:FOSHAN TAOYING NEW MATERIAL CO LTD

Hillside fruit planting afforestation technology

InactiveCN103650733ASolve the key technical problems of low survival rate of afforestationLess investmentLiquid fertiliser distributionClimate change adaptationFruit treeEarth surface
The invention discloses a hillside fruit planting afforestation technology belonging to fruit forest cultivation management. The technology comprises the following steps: building a stone weir; filling the gaps of the stone weir with soil; paving a water gathering film; filling with cultivation soil; planting fruit trees; covering the earth surface with a film; covering the film with soil; covering the soil covering the film with an anti-aging reflective film; fixing the cover film with soil bags; and forming a field planting infiltration ditch. The technology disclosed by the invention is novel in design, unique in structure and widely applicable. The key technical problem of low survival rate of afforestation on a dry stone hillside landform is thoroughly solved. Moreover, according to the technology, the investment is small, the operation is easy and the effect is quickly realized. The technology has great practicability and generalization performances.
Owner:尹发明

Automatic spraying protection process for stone slab

The invention relates to an automatic spraying protection process for a stone slab. The stone slab is sprayed, dried by a fan and dried by an oven while being conveyed on a conveying frame. The automatic spraying protection process is characterized by comprising the following steps: i) atomizing a protective agent through compressed air; ii) spraying the atomized protective agent onto the six surfaces of the stone slab; iii) drying the stone slab protected for the first time by the fan; iv) drying the protected stone slab by the oven; v) spraying the atomized protective agent onto the six surfaces of the dried stone slab; and vi) drying the stone slab by the fan. According to the stone slab processed by the method, the labor cost is saved, the protection efficiency is improved, and the protective agent permeates into the interior of the stone slab to form a deep protection layer for preventing the stone slab from being polluted and damaged.
Owner:环球石材(山东)有限公司

Method for evaluating adhesion of anti-rut agent to stone material

The invention belongs to the technical field of highway engineering testing, and in particular relates to a method for evaluating adhesion of an anti-rut agent to a stone material. The method includesthe steps of taking an appropriate amount of clean and dry stone sample of 2.36-9.5mm size, recording the sample as m1, placing the sample in an oven of 180+ / -2 DEG C for 5 h or more; according to the engineering actual additive amount, weighing the dry anti-rut agent sample in proportion, and recording the sample as m2; discharging the mixture into a clean enamel tray, performing film sealing, freezing the mixture into at 80 DEG C below zero for 1 h or more, taking the mixture and removing the film, immediately placing the mixture into a 120 DEG C oven with a shaking table function, performing heating for 30 min, shaking out at 100 rmp, scraping the anti-rut agent out and weighing the anti-rut agent, and recording the anti-rut agent as m3; wherein when the mass adhesion ratio is calculated, the greater the value, the better it indicates the adhesion of the anti-rut agent to the stone material. Compared with the prior art, the method is simple to operate and good in repeatability, theadhesion between the anti-rutting agent and the stone material can be evaluated directly and quickly, and the method is of great significance for construction and production.
Owner:SHANXI PROVINCIAL RES INST OF COMM

Construction process of pavement structure of ecological cold-mixed permeable asphalt structure

The invention discloses a construction process of a pavement structure of an ecological cold-mixed permeable asphalt structure. The process comprises the following steps: S1, cleaning and drying stones, cleaning the stones, checking whether soil remains on the surfaces of the stones or not, and drying the stones by a dryer to keep the stones dry as much as possible; S2, screening the stones, specifically, screening the sizes of the stones through a screen, and selecting the stones with a particle size of 0.5-1 cm; and S3, cleaning and checking a base layer, washing and cleaning the base layer,and waiting for the surface of the base layer to be dried. The invention relates to the construction process of the pavement structure of the ecological cold-mixed permeable asphalt structure. Cold-mixed asphalt stirred in a factory can be suitable for all-weather use, hot-mixing construction of traditional colored permeable asphalt is improved, an asphalt hot-mixing station does not need to be found any more, construction in winter does not affect strength, raw materials are easy to obtain, only a colored permeable asphalt stock solution and the stones of a set specification are needed, environment protection is facilitated, construction is simple, and operation is easy and convenient.
Owner:湖南砼艺市政工程建设有限公司

Method for preparing enteric stone-like omphalia for treating cancers

The invention discloses a method for preparing enteric stone-like omphalia for treating cancers. The preparation method comprises the following steps: performing ultrasonic cleaning on fresh high-quality stone-like omphalia in a sodium bicarbonate solution; drying the cleaned stone-like omphalia in a fume hook; slicing the dried stone-like omphalia, putting the sliced stone-like omphalia into a container, immersing with a sodium chloride solution, and drying to obtain dried stone-like omphalia; crushing the stone-like omphalia to obtain stone-like omphalia fine powder; granulating with certain auxiliary materials by adopting a dynamic extraction low-temperature concentration process; tabletting, and taking film coating for enteric medicines as a coating material. The traditional Chinese medicine is sclerotium of polyporaceae omphalialapidescens, massive clinical tests prove that the enteric coated stone-like omphalia has the effects of softening hard mass and removing tumor, and reducing lumps, can be used for promoting a human body to restore the capability of synthesizing albumin and increasing immunity, has the effects of relieving dysuria and relaxing, is good in effect, and adopts the enteric coating material to ensure that the stone-like omphalia is not dissolved in stomach and is dissolved and absorbed in small intestine, so that the drug effect can be better played, and the stomach can be protected.
Owner:GANSU HEXI PHARMA

Quick-dry stone-like coating special for interior architecture wall surfaces

The invention relates to a quick-dry stone-like coating special for interior architecture wall surfaces. The stone-like coating is prepared from, by weight, 30-70 parts of pure acrylic emulsion, 6-12 parts of manganese naphthenate, 2-6 parts of hydroxyethyl cellulose, 3-7 parts of ethylene glycol, 8-10 parts of quartz sand, 2-8 parts of hollow glass microspheres, 1-5 parts of a curing agent, 1-3 parts of a stabilizing agent, 2-4 parts of an antifoaming agent, 0.5-2.5 parts of a film formation assistant and 10-20 parts of deionized water. According to the quick-dry stone-like coating, the ingredients of raw materials such as the hollow glass microspheres, the curing agent and the stabilizing agent are added, after the stone-like coating prepared with a method is coated, the drying speed is greatly quickened, and after the architecture wall surfaces are coated with the stone-like coating, the stone-like coating can be rapidly dried, and dust cannot be easily attached to the stone-like coating.
Owner:ANHUI MEILIN BUILDING MATERIAL

Dry sand, stone, beach and slope water accumulation and rainwater collection transplanting tube

The invention discloses a dry sand, stone, beach and slope water accumulation and rainwater collection transplanting tube and belongs to equipment for dry stone differentiation beach and slope fast one-step ecological and economic type renovation and sealed greening in the dry area, desert area and rocky desertification area. The tube comprises a tube bottom and a tube cover which are connected to a rope fastener. The transplanting tube is novel in design, unique in structure and wide in application, and the problems of water retention of the domestic and international dry sand and stone differentiation beach and slope fast one-step ecological and economic type renovation and sealed greening operation are solved; the survival rate of seedlings transplanted by the transplanting tube can be larger than 96% in one growth period (4 to 10 months); the transplanting tube has the advantages of low investment, easiness for operation and high efficiency, practicality and popularization.
Owner:HUNAN XISI ECOLOGY TECH

Dry stone pitching method

The invention provides a dry stone pitching method. A rubble masonry and a pebble masonry serve as a masonry body. Rubble in the rubber masonry is of a block shape, the middle thickness of the rubble is larger than or equal to 20 cm, the thickness of pebbles in the pebble masonry is smaller than or equal to 30 cm, and the ratio between the length and the thickness ranges from 1.0 to 1.5. A downstream slope is flattened and punned so that the slope is smooth; selected rock blocks are conveyed to a filler portion for filling; ultimately, a protective fence is formed through a steel mesh with the thickness of 2 mm on a built work face, and the inner side of the work face is provided with a steel mesh with the thickness of 2 mm. The type and the specification of the masonry are strictly selected, so that the protective function of a dry stone slope is greatly improved.
Owner:SHAANXI LONGHAI ENG CONSTR

Earth and rockfill dam ice pushing and pulling prevention structure and construction method thereof

The invention discloses an earth and rockfill dam anti-ice pushing and pulling structure and a construction method thereof, an anti-ice pushing and pulling box comprises a frame of a cuboid structure, dry stone is placed in the frame, and iron wires are arranged on all faces of the frame and used for blocking the dry stone. The anti-icing and ice-pushing pulling boxes are sequentially arranged on a riding track in the dam axis direction of the earth and rockfill dam, and the riding track is located in a winter water level change area of an upstream dam slope of the dam. During construction, the lowest temperature and the maximum ice thickness of the earth and rockfill dam in winter over the years are firstly collected, then ice thrust is calculated, and an anti-ice-pushing pulling box capable of meeting the static ice pressure requirement is manufactured; and finally, the anti-icing and ice-pushing pulling boxes are sequentially arranged on an upstream dam slope riding track in the dam axis direction of the earth and rockfill dam. The device has the advantage of being high in ice pushing and pulling prevention capacity, and earth and rockfill dam slope protection ice pushing and pulling damage can be avoided; an original dam protection slope does not need to be changed, the method can adapt to earth and rockfill dams of different structures, slope ratios, dam heights and dam lengths, and the applicability is high; the construction is simple; the cost is low, and the like.
Owner:NANJING HYDRAULIC RES INST

Rubber face rockfill dam and its construction method

The invention discloses a rubber face rockfill dam and a construction method thereof. It comprises a main body structure of the rockfill dam. The water-facing surface of the main body of the rockfill dam consists of a transition layer, a dry stone cushion and an inner foam board cushion in sequence from the inside to the outside. , the anti-seepage layer of the rubber panel, the outer foam board layer and the bedding layer; the anti-seepage layer of the rubber panel is provided with an expansion joint in the middle; a base is arranged on the peripheral edge of the anti-seepage layer of the rubber panel, and the edge expansion joints are set, and a certain margin is left quantity. The rubber face rockfill dam of the present invention has good plasticity, flexibility, anti-permeability, simple construction, and low cost. Compared with the concrete face rockfill dam, the rubber face rockfill dam does not need to consider factors such as temperature stress and foundation settlement. Panel joints open, break, etc. The rubber face rockfill dam of the present invention has relatively high strength and high stability, and the rubber face rockfill dam is more suitable for the construction of middle and high dams.
Owner:NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER

A processing method for civil air defense door hinge seat

The invention discloses a method for processing a hinge seat of a civil air defense door, which comprises a core layer, a protective layer and a stable layer. The present invention improves the steel casting process. By controlling the thickness of the coating material, dry quartz sand without adhesives and additives is selected, and a double-structure sand box is used to set air holes and leakage nets to prevent gravel from entering the vacuum chamber. Guarantee the grasp of the gas tension scale during casting, and then improve the characteristics of the steel, so that the steel can reduce the porosity defects in the pouring process, improve the quality of the steel material, fundamentally improve the quality of the core layer steel, and ensure the stability of the steel. The protective layer ensures that the core layer still plays a fixed role after the cracked state. The outer periphery of the flexible layer is protected by a strong material, which again ensures the solid performance of the door hinge seat, improves safety and is easy to install and use, and adds a stable layer to the door hinge seat. Perform further base stabilization to further strengthen the combination between the door hinge seat and the wall.
Owner:惠州市中新人防工程有限公司

Teaching model for construction of earth and rockfill dam

The invention discloses a teaching model for construction of an earth and rockfill dam. The earth and rockfill dam has a clay core and is constructed by filling and laminating earth and rockfill layer by layer, clay masonry is substituted by bricks within 60cm of the outline of the earth dam, two sides of the cross section of the earth and rockfill dam are supported by channel steel 6.3, pulled and fixed by round steel phi20 and enclosed by toughened glass with the thickness of 8mm; the earth and rockfill dam comprises an earth and rockfill dam top, a dam body seepage-proofing body, a drainage facility, a protective slope and dam slope drainage facility and a visiting passageway, wherein a standard traffic road is built on the earth and rockfill dam top, border stones and drainage ditchesare arranged on the downstream side of the earth and rockfill dam top; rock mounds and the drainage ditches are arranged at the foot of the earth and rockfill dam to constitute the drainage facility;a dry stone pitching is arranged on the upstream face of the dam body of the earth and rockfill dam, and a turf protective slope provided with concrete meshes is arranged on the downstream slope of the dam body of the earth and rockfill dam; and the visiting passageway is arranged in a laboratory. According to the invention, field teaching and actual practices are combined to make the shortage ofthe work site practice outside schools.
Owner:YANGLING VOCATIONAL & TECHN COLLEGE

Recycling and reusing method of slag-containing wastewater in stone processing process

The invention relates to the field of stone waste treatment, and particularly discloses a recycling and reusing method of slag-containing wastewater in a stone processing process, wherein the method comprises the following steps: step 1, settling stone powder-containing water generated by stone processing, separating the water from bottom sediments, and then introducing the bottom sediments into a tunnel furnace for baking to obtain semi-dry stone powder; step 2, putting the semi-dry stone powder and molten paraffin into a stirrer according to a weight ratio of 1:(3.5-5), and uniformly stirring to obtain a paraffin-stone powder mixture; and step 3, introducing the paraffin-stone powder mixture into a candle mold to be subjected to injection molding, and cooling to obtain the candle. By means of the method, the stone powder can be recycled, the current stone powder treatment difficulty is solved, the gain effect can be achieved on an existing candle, and two purposes are achieved.
Owner:龙海市仁吉建材有限公司

A dry stone granule and rock slab with simulation effect and its preparation method and application

The invention belongs to the technical field of coatings for brick products, and discloses dry stone granules and slabs with simulation effects and a preparation method and application thereof, which are mainly prepared from main flux, high-temperature raw materials, flux, fillers and cerium oxide. Among them, the main flux is potassium feldspar, quartz is the filler and plays the role of the skeleton structure, and the addition of cerium oxide not only makes the dry stone particles have a colorful flashing effect, but also helps to reduce the high-temperature viscosity of the dry stone particles. In addition, calcium boronite, zinc oxide, dolomite and calcite are all used as fluxes, which help to reduce the viscosity of dry stone particles at high temperatures, and have good leveling effects; barium carbonate and aluminum oxide are used as high-temperature raw materials, which help to improve the stone Onset melting point of dry particles. The stone dry granules obtained in the present invention can be used as one of the raw materials for rock slab preparation, and have moderate transparency, clear layers, simulation effects and three-dimensional effects of real stone dry granules, and have a higher initial melting point and a more suitable high-temperature viscosity, etc. Performance requirements, broad application prospects.
Owner:FOSHAN TAOYING NEW MATERIAL CO LTD

Test method for evaluating cement stabilized macadam skeleton structure

The invention discloses a test method for evaluating a cement stabilized macadam skeleton structure, which specifically comprises the following steps: preparing a to-be-tested air-dried stone mixed sample: sieving the to-be-tested air-dried stone mixed sample by adopting standard sieves with different particle sizes, and recording the passing rate of the to-be-tested air-dried stone mixed sample passing through each standard sieve; loading a to-be-detected air-dried stone mixed sample into the test mold in batches; pressurizing the test mold, crushing the air-dried stone mixed sample to be detected, carrying out grading sieving treatment again, and recording the mass of the air-dried stone mixed sample to be detected passing through each standard sieve at the moment; calculating mass loss rates of the to-be-detected air-dried stone mixed sample passing through the standard sieves before and after pressurization, adding the mass loss rates of the to-be-detected air-dried stone mixed sample passing through the standard sieves, and defining the sum as a skeleton damage index I; according to the test method for evaluating the cement stabilized macadam skeleton structure, the performance of the cement stabilized macadam skeleton structure can be pre-judged more conveniently, and the pre-judgment result is close to the actual performance of the skeleton structure.
Owner:SOUTHEAST UNIV

A combined energy-dissipating embankment of vegetation and artificial embankment and its construction method

The invention discloses a vegetation and artificial levee combined type energy dissipation dike which comprises a sloping dike and wave absorbing vegetation, wherein the top of the sloping dike is covered with the wave absorbing vegetation; the sloping dike comprises a riprap foundation bed, a riprap dike core, a trepanning caisson, a dry stone protective face and an artificial wetland material; the riprap dike core is thrown to and fills the top of the riprap foundation bed; the trepanning caisson is embedded in the riprap dike core; the dry stone protective face covers the slope of the riprap dike core; the artificial wetland material is filled in the trepanning caisson and the dike top of the riprap dike core; and the surface of each of the dry stone protective face and the artificial wetland material is covered with the wave absorbing vegetation. The vegetation and artificial levee combined type energy dissipation dike organically combines structural wave absorption and vegetationwave absorption to ensure and keep the beautiful natural landscape of a coastal wetland and obtain a better wave absorption effect with a smaller floor space and engineering quantity. The invention further provides a construction method of the vegetation and artificial levee combined type energy dissipation dike.
Owner:OCEAN UNIV OF CHINA

A water-repellent brushing treatment process for building decoration dry-hanging stone materials before construction

ActiveCN111042466BThe amount is consistent with the application areaGuaranteed application qualityCovering/liningsGrinding machinesStructural engineeringDry stone
The invention relates to a waterproofing agent brushing process before construction of architectural decoration dry-hanging stone materials, which mainly includes the following steps: cutting stone materials, polishing stone materials, back waterproofing, board installation, wall surface repairing and surface waterproofing, and using waterproofing agent brushing The device includes a mounting frame, a conveying set, a feeding set, a spraying set and a receiving set, and the conveying set is installed on the mounting frame, and the feeding set, the spraying set and the receiving set are arranged in sequence from right to left inside the mounting frame. It can solve the following problems in the back waterproofing of the existing dry-hanging stone materials: a: When spraying the waterproofing agent, the waterproofing agent is artificially sprayed, and then the phenomenon of missing coating and uneven application occurs, which affects the quality; b: the existing After the dry-hanging stone is sprayed with waterproofing agent, the stone is placed in the air to dry, but there are impurities in the air, which cause impurities to penetrate during the drying process and affect the waterproof effect.
Owner:CHINA STATE CONSTR HAILONG TECH CO LTD +2

Method for building city watercourse regulation and storage waterlogging prevention system

The invention provides a method for building a city watercourse regulation and storage waterlogging prevention system. The city watercourse regulation and storage waterlogging prevention system comprises an overflow dyke, wet pond wetland areas and a river bank land area which are sequentially arranged from a watercourse to river bank direction, and a mucky clay layer is arranged on a foundation surface layer located between the watercourse and the river bank land area. The method for building the city watercourse regulation and storage waterlogging prevention system comprises the following steps that parts of waterfront belts located on the two sides of the watercourse are arranged as the wet pond wetland areas, parts of existing watercourses located outside the watercourse blue line range are arranged as wet ponds, and the position of the wet ponds is enabled to correspond to a watercourse upper edge line planned originally; and building is carried out by using a construction mode ofloading soil with a straw bag to form the overflow dyke, the levee crown of the overflow dyke corresponds to the design water level control line, and dry stone walls are built on the levee crown of the overflow dyke and a levee slope of a backward watercourse. According to the method for building the city watercourse regulation and storage waterlogging prevention system, the parts of existing watercourses can be fully used, a foundation with the surface layer of the mucky clay layer is adapted, the ecological environment of the watercourse waterfront belts is enriched, and the regulation andstorage amount of the watercourse is increased.
Owner:SHANGHAI INVESTIGATION DESIGN & RES INST

River section structure for relieving urban land tension

The invention relates to a river section structure for relieving urban land tension. The river section structure consists of a rectangular section, a water accessibility bank slope and a land territory control ground in sequence, wherein the rectangular section consists of a natural river bottom and a dry stone upright wall; the water accessibility bank slope consists of a water accessibility platform and an ecological side slope; the land territory control ground is positioned above the water accessibility bank slope. The river section structure is characterized in that the land territory control ground rises no less than a planned safe free board in the outward longitudinal direction, and the rise value is 0.5-1 meter. By designing the land territory control ground with the safe free board, the blue-line land territory control range can be fully utilized. By adopting a rectangular section structure on a main river channel, land is saved, the safety is ensured, and various functions of the river channel are not weakened, thereby eliminating the contradiction between urban land development and water.
Owner:HOHAI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products