The invention relates to an upper floating body and lower floating body
separation process of an offshore platform. The
separation process comprises the following steps that firstly, a separation
water area near a
wharf is selected and subjected to
field survey and cleaning; 2, lower floating body separation preparation: S1, lower floating body lifting lug installation and sling configuration; s2, a lower floating body locking device buffer
assembly is arranged; s3, a lower floating body measuring scale is arranged; s4, injecting water into the lower floating body, ventilating, and installing a drainage
pipe and a
submersible pump; thirdly, the offshore platform is towed to a separation
water area; 4, separating upper and lower floating bodies; and step 5, ending. The upper floating body and the lower floating body are separated at the
wharf, compared with a
wind field, the
wharf equipment resources are sufficient, the surrounding environment is controllable, the cost is greatly saved while it is guaranteed that the upper floating body and the lower floating body are separated smoothly and safely, and the separation risk of the upper floating body and the lower floating body is reduced; the screened separation
water area meets the requirements of the separation water area through tidal changes, and meanwhile separation work of the upper floating body and the lower floating body is conducted, and follow-up separation operation is facilitated.