The embodiment of the invention discloses a tubular column string. The tubular column string at least comprises a
coiled tubing connector, a mechanical releasing tool, a centering device, a collar locator, a
sand blasting perforation sliding sleeve, a hydraulic setting tool and a bridge plug. The
sand blasting perforation sliding sleeve, the hydraulic setting tool and the bridge plug are sequentially connected in series in the direction from one end to the other end of the
coiled tubing connector of the tubular column string, and the
coiled tubing connector is used for being connected with coiled tubing. The whole operation of bridge plug
tripping and setting can be completed through coiled tubing equipment, so that less equipment is used in construction, working procedures are few, and manual work is less;
pyrotechnics equipment can be avoided, safety performance is high, the coiled tubing equipment is high in adaptability to well conditions, and large-
discharge-capacity staged fracturing of a casing horizontal well can be achieved due to the full bore after the bridge plug is removed through drilling. The invention further discloses a bridge plug setting and
sand blasting perforation combining method.