The invention provides an electric
transmission line project foundation prefabricated construction method. The electric
transmission line project foundation prefabricated construction method comprisesthe steps of a construction
preparation stage, foundation prefabricated construction, prefabricated foundation transporting, excavation of a foundation pit and construction of an under layer, foundation hoisting in position, foundation backfilling and the like. The construction
preparation stage comprises the steps of field selection, manufacturing of a
movable type construction platform, manufacturing of a template, manufacturing of a suspension center pre-buried piece, hoisting of a steel
wire rope and the like. The foundation prefabricated construction comprises the steps of preparation, mounting of inserting angle iron, rib braiding and template erecting, pouring, foundation identification, transferring and maintenance of the prefabricated foundation, quality detection of raw materials and concrete and the like. The prefabricated field in the construction method is fixed, the reshipment quantity of the construction raw materials, equipment and instruments are reduced, wear and loss in the reshipment process of the materials and the instruments are reduced, interference of outside factors is eliminated, resource investment is reduced, the influence of
terrain to construction iseliminated, the operation frequency and time in the foundation pit are decreased, construction potential safety hazards are lowered, and the labor condition is improved.