Excavation construction method for super large cross section tunnel of bias shallow buried weak surrounding rock

The invention discloses an excavation construction method for a super large cross section tunnel of bias shallow buried weak surrounding rock. A temporary median lamella wall is adopted to divide a tunnel face into a left part and a right part; and the left part and the right part are excavated simultaneously through a three-bench-five-step method. According to the three-bench-five-step excavation method of the median lamella, when the geological condition changes, construction processes can be converted flexible and timely, the construction method is adjusted, and the construction period is shortened. The excavation method is simple in process and reliable in excavation, excavation of the super large cross section tunnel of the bias shallow buried weak surrounding rock is provided an important guarantee, the failure rate is low, and the project profitability is enhanced. A locking anchor pipe replaces a traditional locking anchor rod, the stability of the structure is also improved, meanwhile, steel pipes are adopted to fix steel frames, so that the steel frames form a whole through the connected steel pipes, the system bearing load is improved, the fixing effect of the steel frames is better, and control of tunnel deformation is very favorable.
Owner:CCCC SECOND HARBOR ENG

Conveying device for heavy load conveyor belt

The invention discloses a conveying device for a heavy load conveyor belt. The conveying device for the heavy load conveyor belt comprises a steel ball seat, a half sphere body groove is formed in the top of the steel ball seat, C8 steel balls distributed evenly are arranged on the surface of the groove, a steel ball cap is further arranged on the upper edge of the steel ball seat, a steel ball cap top, an inner cavity and a cap inner wall define an arc-shaped hole for penetrating through of a C100 steel ball, the diameter, located on the top of the steel ball cap, of the arc-shaped hole is smaller than the diameter, located in the inner cavity of the steel ball cap, of the arc-shaped hole, a spherical surface on one side of the C100 steel ball penetrates out through the steel ball cap top, and a spherical surface on the other side of the C100 steel ball is connected with the C8 steel ball in a sliding mode. An annular groove is further formed in the inner wall of the arc-shaped hole of the steel ball cap, C6 steel balls capable of rolling are arranged in the annular groove, and the C6 steel balls are connected with the C100 steel ball in a sliding mode. According to the conveying device for the heavy load conveyor belt, the problems that a traditional universal wheel structure has limitation and bearing load is limited are solved, 5-ton load can be born, the problem that the traditional universal wheel deflects due to universal rotational damping is also solved, and power device burdens are reduced.
Owner:上海林春万向轮制造有限公司

Three-dimensional silicon carbide fiber preform reinforced yttrium silicate composite material and preparation method thereof

The invention discloses a three-dimensional silicon carbide fiber preform reinforced yttrium silicate composite material. The composite material comprises a three-dimensional silicon carbide fiber preform and yttrium silicate, the yttrium silicate is a mixed crystalline phase of Y2Si2O7 and Y2SiO5, a crystalline phase of the Y2Si2O7 or a crystalline phase of the Y2SiO5, the pores of the three-dimensional silicon carbide fiber preform are uniformly filled with the yttrium silicate, and the porosity of the three-dimensional silicon carbide fiber preform reinforced yttrium silicate composite material is 10%-16%. A preparation method comprises the following steps: (1) preparing a Y2O3-SiO2 composite sol; (2) performing impregnating; (3) performing drying; (4) performing heat treatment; and (5)repeating processes including impregnating-drying-heat treatment in the steps (2)-(4). The three-dimensional silicon carbide fiber preform reinforced yttrium silicate composite material has the advantages of low porosity, a high compact degree, high-temperature resistance, oxidation resistance, excellent mechanical properties and the like; and the preparation efficiency of the preparation methodis high, and the compact degree and mechanical properties of the prepared composite material are remarkably improved.
Owner:NAT UNIV OF DEFENSE TECH

Admixture for marine engineering concrete and preparation method of admixture

InactiveCN110668731AImprove workabilityLarge amount of bubblesTetramethylammonium iodideMeth-
The invention relates to the field of buildings, in particular to an admixture for marine engineering concrete and a preparation method of the admixture. The admixture is prepared from raw materials in parts by weight: 100-150 parts of a water reducing agent, 0.5-1 part of tetramethylammonium iodide, 1-5 parts of sodium ethoxide, 3-5 parts of polyacrylamide, 30-50 parts of a surfactant, 15-20 parts of a rust inhibitor, 30-50 parts of an expansion agent, 3-5 parts of a retarder, 6-10 parts of a deforming agent and 0-80 parts of water. The invention aims to overcome the shortcomings of the priorart and provide the admixture for the marine engineering concrete and the preparation method of the admixture, the effects of water reduction, rust resistance, defoaming and retarding are achieved, and the effects are improved; the admixture is added into the concrete, so that the flowability of concrete slurry is improved, retentivity is good, the water reduction rate is high, the density of theconcrete is improved, good flocculability is achieved, and the friction resistance between liquid can be reduced; and the grinding efficiency is improved, and the admixture has the characteristics ofexcellent anti-permeability, fast hardening and early strength, high later strength and the like.
Owner:广西云燕特种水泥建材有限公司

Three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material and preparation method thereof

The invention discloses a preparation method of a three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material. The preparation method of the three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material comprises the following steps of (1) stabilizing SiO2-ZrO2 composite sol; (2) impregnatingthree-dimensional carbon fiber prefabricated members into the stabilized SiO2-ZrO2 composite sol; (3) drying the impregnated three-dimensional carbon fiber prefabricated members; (4) performing thermal treatment; (5) repeating the impregnation-drying-thermal treatment process in the steps of (2) to (4) until the weight gain rate of a three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material intermediate in a current impregnation-drying-thermal treatment process relative to a previous impregnation-drying-thermal treatment process is smaller than 1% to obtain the three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material. The prepared three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material has the advantages of being high in high-temperature resistance and antioxidant and mechanical performance and the like.
Owner:NAT UNIV OF DEFENSE TECH

Chain cable securing device for ship

The invention relates to a chain cable securing device for a ship, which can be widely used for water drum mooring of the ship during defending against a hurricane. The chain cable securing device for the ship comprises a base and a manual opening and closing mechanism which is configured together with the base, wherein the manual opening and closing mechanism comprises a press cover with one end hinged with the base; an internal arc groove and an external arc groove are respectively formed inside and outside the press cover configured together with the base; the press cover is connected with a manual rocking bar by a connecting bar and the other end of the manual rocking bar is hinged with the base so that a double-rocking-bar type manual opening and closing mechanism; the manual rocking bar of the manual opening and closing mechanism is connected with a self-locking mechanism; and the self-locking mechanism is connected with a manual unlocking device. The chain cable securing device for the ship, provided by the invention has the advantages of compact and reasonable structure, high reliability, small appearance, light weight, high bearing load, strong hurricane defending mooring function, convenience in use, functions of rapidly clamping, automatically locking and rapidly unlocking hurricane defending chain cables and capability of being widely used for water drum mooring of the ship during defending against the hurricane.
Owner:CHINA SHIPBUILDING INDUSTRY CORPORATION

Three-dimensional carbon fiber preform reinforced yttrium silicate composite material and preparation method thereof

The invention discloses a three-dimensional carbon fiber preform reinforced yttrium silicate composite material. The composite material comprises a three-dimensional carbon fiber preform and yttrium silicate, the yttrium silicate is a mixed crystalline phase of Y2Si2O7 and Y2SiO5, a crystalline phase of the Y2Si2O7 or a crystalline phase of the Y2SiO5, the pores of the three-dimensional carbon fiber preform are uniformly filled with the yttrium silicate, and the porosity of the three-dimensional carbon fiber preform reinforced yttrium silicate composite material is 9%-14%. A preparation methodcomprises the following steps: (1) preparing a Y2O3-SiO2 composite sol; (2) performing impregnating; (3) performing drying; (4) performing heat treatment; and (5) repeating processes including impregnating-drying-heat treatment in the steps (2)-(4). The three-dimensional carbon fiber preform reinforced yttrium silicate composite material has the advantages of low porosity, a high compact degree,high-temperature resistance, oxidation resistance, excellent mechanical properties and the like; and the preparation efficiency of the preparation method is high, and the compact degree and mechanicalproperties of the prepared composite material are remarkably improved
Owner:NAT UNIV OF DEFENSE TECH

Three-dimensional carbon fiber preform enhanced yttrium oxide-aluminum oxide complex-phase ceramic composite material and preparation method thereof

The invention discloses a three-dimensional carbon fiber preform enhanced yttrium oxide-aluminum oxide complex-phase ceramic composite material and a preparation method thereof. The composite materialcomprises a three-dimensional carbon fiber preform and yttrium oxide-aluminum oxide complex-phase ceramic, in the yttrium oxide-aluminum oxide complex-phase ceramic, the molar content of Al2O3 is 5%-95%, pores of a three-dimensional carbon fiber preform are uniformly filled with the yttrium oxide-aluminum oxide complex-phase ceramic, and the porosity of the three-dimensional carbon fiber preformenhanced yttrium oxide-aluminum oxide complex-phase ceramic composite material is 10%-15%. The preparation method comprises the following steps; (1) preparing yttrium oxide-aluminum oxide composite sol; (2) carrying out dipping; (3) drying; (4) carrying out heat treatment; and (5) repeating a dipping-drying-heat treatment process in the step (2)-step (4). The composite material has the advantagesof low porosity, high compactness, high temperature resistance, oxidation resistance, excellent mechanical property and the like. The preparation method is high in preparation efficiency, and the compactness and mechanical property of the prepared composite material are improved remarkably.
Owner:NAT UNIV OF DEFENSE TECH

Light-weight large-load commercial vehicle stabilizer bar and suspender assembly and preparation method thereof

The invention discloses a light-weight large-load commercial vehicle stabilizer bar and suspender assembly and a preparation method thereof. The stabilizer bar and suspender assembly comprises a composite material rod body and a reinforcement body, wherein the reinforcement body is fiber or metal wires and comprises a plurality of reinforcement body sections, a first sleeve is arranged at one end of the rod body, and a second sleeve and a third sleeve are arranged at the other end of the rod body; a bushing is arranged in each sleeve, at least one fourth bushing is arranged in the rod body, when the number of the fourth bushing is one, a reinforcing body section is wound between the first bushing and the fourth bushing, reinforcing body sections are wound between the second bushing and the fourth bushing, reinforcing body sections are wound between the third bushing and the fourth bushing, and when the number of the fourth bushings is more than two, reinforcing body sections are also wound between two adjacent fourth bushings. The preparation method comprises injection molding or pouring molding. The stabilizer bar assembly has the advantages of being light in weight, high in bearing load, high in design freedom degree and the like, and can be suitable for rod pieces with longer lengths and more complex structures.
Owner:BOGE RUBBER&PLASTICS ZHUZHOU CO LTD

Steel bar concrete precast floor slab

The invention relates to improvement of the traditional steel bar concrete precast floor slab, which is characterized in that the upper surface layer and the lower surface layer of a precast concrete hollow floor slab are internally provided with a two-way steel bar framework, an upper and lower layer connecting steel bar concrete ribs consisting of a vertical steel bar connecting steel bars of the upper surface layer and the lower surface layer and wrapping concrete is arranged between the upper surface layer and the lower surface layer; heat insulation and sound insulation materials are filled between the two steel bar concrete ribs; two sides and two ends of the floor slab in an axial direction are both provided with connecting steel bars and side wings of the extending thickness less than the thickness of the floor slab; and shelf beams at two end parts of the floor slab are internally provided with transverse steel bar frameworks forming beam structures and anti-shearing diagonalsteel bars connecting the steel bars at the lower surface layer. The precast floor slab integrates the advantages of the precast floor slab and the cast-in-place floor slab, overcomes all defects of the precast floor slab and the cast-in-place floor slab, especially has small cast-in-place construction workload and high construction speed, can meet requirements of the construction for rapid operation, materials saving and no pollution in an assembled building, accords with the development direction of the building industrialization production, and has high earthquake resistance of the cast-in-place floor slab.
Owner:张吉华 +1

Bearing for robot arm

The invention discloses a bearing for a robot arm. The bearing comprises an inner ring, an outer ring arranged out of the inner ring in a sleeving manner and a spherical rolling body. Two parallel chutes are formed in the outer circumferential face of the inner ring and the inner circumferential face of the outer ring, the chutes of the inner ring and the chutes of the outer ring are formed oppositely, the rolling body is arranged between the chutes of the inner ring and the chutes of the outer ring, the axial sections of the chutes comprise first arcs and second arcs, the radiuses of curvature of which are greater than the radius of the rolling body, and the rolling body is in contact with the first and second arcs, so that the rolling body and the chutes have four contact points, and therefore, the bearing not only can bear the radial load, but also can bear the axial load, and the bearing load of the bearing is improved; one of the inner and outer ring is fixedly connected to a large arm of the robot while the other one is fixedly connected to small arm, and the rotating axis of the inner ring is deviated from the rotating axis of the outer ring, so that the moving track of theend part of the small arm is changed and the rotating area range between the small arm and the large arm is enlarged.
Owner:临清市海瑞轴承制造有限公司

Three-dimensional carbon fiber reinforced silica-zirconia composite ceramic composite material and preparation method thereof

The invention discloses a preparation method of a three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material. The preparation method of the three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material comprises the following steps of (1) stabilizing SiO2-ZrO2 composite sol; (2) impregnatingthree-dimensional carbon fiber prefabricated members into the stabilized SiO2-ZrO2 composite sol; (3) drying the impregnated three-dimensional carbon fiber prefabricated members; (4) performing thermal treatment; (5) repeating the impregnation-drying-thermal treatment process in the steps of (2) to (4) until the weight gain rate of a three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material intermediate in a current impregnation-drying-thermal treatment process relative to a previous impregnation-drying-thermal treatment process is smaller than 1% to obtain the three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material. The prepared three-dimensional carbon fiber-reinforced silicon dioxide-zirconium dioxide multiphase ceramic composite material has the advantages of being high in high-temperature resistance and antioxidant and mechanical performance and the like.
Owner:NAT UNIV OF DEFENSE TECH

Novelbridge crane beam bearing platform structure of underground power house and construction method of novel bridge crane beam bearing platform structure

The invention discloses a novel bridge crane beam bearing platform structure of an underground power house and a construction method of the novel bridge crane beam bearing platform structure. The novel bridge crane beam bearing platform structure comprises a rock mass and a cantilever beam, wherein the cantilever beam is divided into an embedding section and a cantilever section; an embedding groove is excavated in the rock mass; an embedding section of the cantilever beam is embedded in the embedding groove; the cantilever beam comprises longitudinal ribs and stirrups; the longitudinal ribs are sleeved with the stirrups, are distributed in the periphery of the cantilever beam and extend out of the end face of the embedding section of the cantilever beam; a plurality of first embedding channels are formed in the end of the embedding section, and the longitudinal ribs are embedded in the first embedding channels. The embedding grooves embedded in the embedding section of the cantileverbeam is excavated in the rock mass, and by embedding the cantilever beam in the rock mass, stability of the bridge crane beam bearing structure is improved, and the problem of structural instability of the rock anchor beam due to plastic damage between the rock wall and an inclined platform when quality of the rock wall is poor in the prior art is solved.
Owner:中国葛洲坝集团第三工程有限公司

High-rigidity dust-free assembled laboratory

The invention relates to the technical field of precision equipment laboratories, in particular to a high-rigidity dust-free assembled laboratory which comprises a wall and a ground. The ground comprises two side edge buckling beams and a unit plate located between the two side edge buckling beams, first arc-shaped long grooves are formed in the side faces, close to the unit plate, of the two side edge buckling beams correspondingly, and second arc-shaped long grooves are formed in the two side faces, close to the side edge buckling beams, of the unit plate correspondingly. Cylindrical long grooves are formed between the first arc-shaped long grooves and the corresponding second arc-shaped long grooves, and core columns used for fixing the side edge buckling beams and the unit plates are arranged in the cylindrical long grooves. A fixing piece used for fixing the two wall plates is arranged between the two adjacent wall plates. The assembled type floor is adopted, consumables are saved, the construction period is greatly shortened, and cyclic disassembly and utilization can be achieved; in addition, the laboratory wall body is a prefabricated semi-finished product field assembly type, so that the field installation time is greatly saved, procedures are few in interpenetration, and construction is convenient; and meanwhile, the possibility of environmental pollution to a laboratory in the construction process is reduced.
Owner:CHINA CONSTR EIGHTH ENG DIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products