Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

52results about How to "Reduce resource loss" patented technology

Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel

The invention discloses a stepped on-pillar continuous filling mining method for deep well super high large breaking ore body panel. An ore body is divided into a front part and a rear part in a super high large breaking ore body center by an transportation roadway, then the front part and the rear part are respectively divided into a plurality of panels, no pillar exists between pillars, each panel is partitioned into a primary extracting drift and a second extracting drift, the panels in the front part are extracted at first and then the panels in the rear part are extracted, the front and rear panels are extracted in a stepped manner, each production technology is carried out in the same level, and procedures can not influence each other; after the stop back production is finished, the primary extracting drift is filled with cement and the secondary extracting drift is filled by classifying tailings while roof-contacted filling is ensured; and the primary extraction drift and the secondary extraction drift adopt high strength filling topping, and binding materials are added in the filling tailings so as to improve the compression strength of a topping layer. The invention has the characteristics of high extraction safety, small loss and dilution, high mechanical degree, large stope amount, large back production strength, high production capability, short back production time and the like.
Owner:CENT SOUTH UNIV

Integrated managing and controlling system and method of mass production enterprise

The invention provides an integrated managing and controlling system and a method of mass production enterprises in transportation construction industry; the system comprises two parts, namely, hardware and software; the hardware includes a plurality of production devices, a plurality of production device terminal computers, a plurality of data collectors, a plurality of controllers, a plurality of video devices, a plurality of dippers or GPS satellite positioning devices, a plurality of service management terminal computers, a plurality of monitoring management terminal machines, a service management server and a monitoring mechanism server; the software includes data collecting software, service management software, monitoring management software, service management database software andmonitoring management database software; the integrated managing and controlling system of mass production enterprises is divided into three layers based on structure; the first layer is a data collecting layer, the second layer is a service management layer and the third layer is a monitoring management layer. The system and the method are scientifically and rationally designed, and creative, not only improve the production automation level and production continuity, but also guarantee the systematicness, visibility and reliability of intelligent operation of the whole production; meanwhile,the system and the method can prevent resource loss, reduce production cost and improve economic benefits.
Owner:石庆生 +1

Middle-waisted bidirectional filling and mining method under canopy guard in thick and great metal mine in sea bed

The invention discloses a middle-waisted bidirectional filling and mining method under canopy guard in a thick and great metal mine in sea bed, which is characterized in that a safety isolating layer is preserved between an ore body and the sea bed; the ore body is divided into an upper part and a lower part at the middle waist in the altitude direction; the altitude from the middle waist position to the sea bed sea mud is 100-150m; stoping is carried out from the middle waist position of the ore body, wherein the upper part adopts upstroke mining and the lower part adopts downstroke mining; a rock trackless quasi-upward slicing cemented method with a regular post pillar is adopted in the upstroke mining method; a rock trackless quasi-ordinary slicing cemented method is adopted in the downstroke mining; the gob in the stope is filled with filling materials. The invention is characterized by having high safety of mining, little loss of resources, high degree of mechanism, low labor intensity, great production capacity, short stoping time, low mining settlement and the like.
Owner:CENT SOUTH UNIV +1

Air column well completion back coming subsequent filling mining method

The invention discloses an air column well completion back coming subsequent filling mining method of a thick and large metal ore bed under an ore rock unstable condition. Subsections are divided in a vertical level to carry out stope preparation; a stope is divided along the moving direction of a crushed body to be used as a back stoping unit; in each stope, back coming is carried out by a middle depth hole from an upper disc to a lower disc; the back stoping is carried out at the same time in the plurality of subsections; and the roof exposed area of the stope is controlled. When one section is exploited and ores are discharged, an air column is put down from an upper subsection rock drilling roadway and is distributed nearby an unexploded ore body; after filling and curing, 1-2 rows of cannon arrangement holes in the rear row are exploded for two times to form grooves. The stope width, the recovery length of each time, the filling material ratio, the strength of a filling body and the like are obtained by an ore rock mechanical parameter test, mechanical analysis and numerical value simulation analysis. The rock drilling, the explosion, the ore removal and the shoring are finished by trackless equipment; and the air column well completion back coming subsequent filling mining method has the characteristics of high exploiting safety, small resource loss, high mechanical degree, low labor intensity, great production capability, short back stoping time, and the like.
Owner:SHANDONG GOLD MINING LINGLONG

Method and a cleaning system for cleaning industrially produced components

In order to recover the resources (cleaning agents, heat) contained in the cleaning agent vapors suctioned off a cleaning system for cleaning industrially produced components, according to the invention the suctioned off waste air (I) is guided in a recovery device (5) via a heat register (9) of a refrigeration device (6), is thereby substantially heated to the temperature of the waste air (I), and the thus heated, dried waste air (I) is supplied to the cleaning chamber (2) in the region of a bulkhead door (16) as preheated, dry supply air (II).
Owner:TMS TURNKEY MFG SOLUTIONS

Downlink transmitting method, and control device, base station and heterogeneous system in heterogeneous network

The invention provides a downlink transmitting method, and a control device, a base station and a heterogeneous system in a heterogeneous network. The method comprises the following steps of determining at least one of one or more micro-stations, which needs to be joined with a macro-station to transmit information to edge users through a control device when one or more micro-stations need to schedule the edge users on a quiet subframe ABS; and adopting the control device to instruct the macro-station and the micro-station needing to be joined with the macro-station to collectively transmit the information to the edge user to transmit the information to the edge user on the ABS. By adopting the downlink transmitting method, the performance of the micro-station edge user can be enhanced, the resource waste of the macro-station can be overcome, and the system performance can be enhanced.
Owner:HUAWEI TECH CO LTD

ASP.NET-based travel management system

The invention discloses an ASP.NET-based travel management system, which comprises a scenic spot management module, a travel route management module, a travel order management module, a news management module, a spot browsing module, a news browsing module and an order submission module. An administrator edits scenic spot information through the scenic spot management module, edits travel route information through the travel route management module, and edits tour-related news information through the news management module; a user browses the scenic spot information through the spot browsing module, and submits travel order information to a background through the order submission module; and the administrator can browse all order information, query corresponding order information and process the order information through the travel order management module. The ASP.NET-based travel management system adopts a modular design, is reasonable in structure and simple in operation, can establish an efficient information management system, performs standardized management on service operation and process of a travel agency, simplifies service process, and increases working efficiency.
Owner:YANCHENG INST OF TECH

Mechanical sublevel filling mining method adopting vertical hole and horizontal hole cooperative recovery

The invention discloses a mechanical sublevel filling mining method adopting vertical hole and horizontal hole cooperative recovery. According to mine sublevel recovery, vertical hole recovery and horizontal hole recovery are cooperatively performed in a sublevel recovery unit; a vertical hole comprises a pre-splitting hole and an ore breaking hole, most of the ore in the unit is recovered in the vertical ore breaking hole, a unit ejector plate is formed by horizontal hole recovery, two outlines of the unit are controlled by the vertical pre-splitting hole, the ore is discharged cooperatively by a common scraper and a remote control scraper after recovery canopy guard, a unit goaf is filled at a time, and a drilling space is reserved for the upper recovery next sublevel. The operation is cycled until the whole one-step stope recovery is finished. The characteristics of high strength, high efficiency and low cost of sublevel recovery are exerted, the two outlines of the sublevel recovery unit are controlled by utilizing pre-splitting blasting, and the outline of a recovery unit ejector plate is controlled through the horizontal hole recovery. The method has the advantages of safety, high efficiency, simple process, low loss and dilution and high mechanical degree.
Owner:CENT SOUTH UNIV

Method for preventing roadway impact ground pressure through hydraulic roof cutting and roadway leaving

The invention provides a method for preventing roadway impact ground pressure through hydraulic roof cutting and roadway leaving. The method comprises main steps of tunneling of a roadway to circle out a working surface mining area, vertical drilling in the roadway, placement and direction adjustment of an ejector, oriented hydraulic gap cutting, and use of the roadway after gap cutting and roof cutting as an air return way of a next working surface. The method for preventing the roadway impact ground pressure through hydraulic roof cutting and roadway leaving can reduce the roadway tunnelingand maintenance workload, reduces the coal resource loss, and achieves important significance on control of the airport roadway mine pressure, in particular the impact ground pressure disaster.
Owner:TIANDI SCI & TECH CO LTD

Method and device for generating risk warning information and electronic equipment

The invention relates to a method and device for generating risk warning information based on user behavior data, electronic equipment and a computer readable medium. The method comprises the steps ofobtaining behavior data of a user in a point pre-burying mode, wherein the behavior data comprises a preset behavior and corresponding time; inputting the behavior data into a word vector model to generate a user word vector; inputting the user word vector into a user risk model to generate a user risk score, the user risk model being generated through bidirectional recurrent neural network training; and when the user risk score is smaller than a threshold, generating risk warning information. According to the method and device for generating the risk warning information based on the user behavior data, the electronic equipment and the computer readable medium, historical information of a user account is not depended on, the future risk behavior of the user can be recognized only according to the user behavior data, then early warning is conducted in advance, and enterprise resource losses are reduced.
Owner:SHANGHAI QIYUE INFORMATION TECH CO LTD

Flood prevention high-low voltage power distribution cabinet with good sealing effect

The invention discloses a flood prevention high-low voltage power distribution cabinet with a good sealing effect, and belongs to the technical field of power distribution cabinets. The flood prevention high-low voltage power distribution cabinet comprises a cabinet body, wherein an adjusting mechanism is arranged at the bottom part of the cabinet body, a sealing mechanism is arranged at the top part of the cabinet body, protection mechanisms are arranged on the two sides of the top part of the cabinet body, the bottom part of the protection mechanism on the front side is clamped with the adjusting mechanism through a clamping mechanism, a lifting mechanism is arranged on the rear side of the cabinet body, each protection mechanism comprises an inner anti-collision sleeve, the inner anti-collision sleeves are attached to the two sides of the top part of the cabinet body, and fixing plates are fixedly connected to the two sides of the cabinet body. According to the flood prevention high-low voltage power distribution cabinet, through arrangement of the lifting mechanism and the protection mechanisms, an energy absorption plate can absorb impact force through bending of an energy absorption groove and prevent impact from being introduced into the inner wall of the cabinet body to cause damage to electrical elements, so that the cabinet body can move upwards to avoid water immersion under flood disasters, the impact resistance of the cabinet body is improved, flood impact can be resisted, and the use requirements of extreme flood disasters are met.
Owner:杭州潘达科技有限公司

Application access method, device and equipment

The embodiment of the invention discloses an application access method, device and equipment, and the method comprises the steps: obtaining an access request for triggering a second application in a first application, and enabling the first application to be an external application program of the second application; obtaining an access rule of the second application, and performing skip identification on the access request according to the access rule to obtain an identification result; and determining whether to allow access to the second application according to the identification result.
Owner:ADVANCED NEW TECH CO LTD

Method for manufacturing fused magnesia and pig iron by using waste magnesia carbon bricks and rolled steel sheets

The invention relates to a method for manufacturing fused magnesia and pig iron by using waste magnesia carbon bricks and rolled steel sheets. The method comprises the steps that (1) the waste magnesia carbon bricks and the rolled steel sheets are broken to form magnesia carbon brick powder and rolled steel sheet powder respectively; (2) the magnesia carbon brick powder is mixed with the rolled steel sheet powder after water is added to the magnesia carbon brick powder to enable the magnesia carbon brick powder to be wet; (3) adhesion agents are added to enable mixed materials to be pressed so as to form iron carbon magnesium pellets; (4) the iron carbon magnesium pellets containing water are dried; (5) the iron carbon magnesium pellets and magnesite are fed into a high-capacity magnesium electrofusion furnace in a layered material distribution mode, and the iron carbon magnesium pellets serve as the first layer of raw materials; (6) the iron carbon magnesium pellets are distributed in the central region of the magnesium electrofusion furnace, and the magnesite is distributed on the periphery of the iron carbon magnesium pellets, so that the second layer of raw materials is formed by the iron carbon magnesium pellets and the magnesite together; and (7) the step (5) and the step (6) are repeatedly conducted, various layers of raw materials are distributed in sequence, refining and precipitation are conducted, and finally the fused magnesia and the pig iron are obtained. The method for manufacturing the fused magnesia and the pig iron by using the waste magnesia carbon bricks and the rolled steel sheets achieves comprehensive and efficient utilization of the industrial waste.
Owner:鞍山澳海耐火材料有限公司

Unmanned aerial vehicle channel resource allocation method supporting different QoS

The invention discloses an unmanned aerial vehicle communication channel resource allocation method supporting different QoS (Quality of Service). The method comprises the steps of calculating the number of unmanned aerial vehicles, predicting newly arrived unmanned aerial vehicles, predicting departed unmanned aerial vehicles according to movement, optimizing time frames and the like. According to the channel allocation method, channel resources are allocated according to the service flow requirements of the unmanned aerial vehicles, a bandwidth of a video service is guaranteed, and the method comprises the steps of mobile prediction, flow testing, channel resource allocation for the video service, channel resource allocation for other services and the like. According to the scheme disclosed by the invention, link interruption generated by movement of the unmanned aerial vehicles is avoided so that the reliability of security grouping is improved, and the bandwidth of the video service is guaranteed.
Owner:NAT UNIV OF DEFENSE TECH

Arrearage risk identification method based on customer payment information and credit investigation information

The invention relates to an arrearage risk identification method based on customer payment information and credit investigation information. The arrearage risk identification method comprises the steps of collecting original data, collecting a target field from the original data based on a preset index, and generating an arrearage risk evaluation model based on the target field. Compared with theprior art, the customer arrearage risk identification method has the advantages that a big data technology and a data mining algorithm model are used, the related conditions of customer payment information are truly and timely known through mass data, the arrearage risk of a customer can be timely identified through characteristic analysis, and the national resource loss is reduced.
Owner:国家电网有限公司客户服务中心 +2

Novel heterogeneous moisture evaporation inhibitor preparation method

InactiveCN104772094AGood inhibition rateWater time extension decayProductsReagentsAlcoholEvaporation
The present invention belongs to the technical field of research on moisture evaporation inhibitor preparation processes, and more particularly relates to a novel heterogeneous moisture evaporation inhibitor preparation method. The inhibitor comprises 0.8-1.4% of even carbon fatty alcohol or 0.6-1% of odd carbon fatty alcohol, 4-10% of short-chain alcohol, 40-65% of petroleum ether, 0.7-1.1% of a fatty alcohol polyoxyethylene ether series emulsifier AEO-3 and / or AEO-5 and / or AEO-7, and the balance of distilled water. The preparation method comprises: (1) according to the ratio, weighing even carbon fatty alcohol or odd carbon fatty alcohol and short-chain alcohol, completely dissolving in petroleum ether at a room temperature, adding a fatty alcohol polyoxyethylene ether series emulsifier, and completely and uniformly mixing so as to be used as a moisture evaporation inhibitor oil phase system; and (2) weighing distilled water, adding to the obtained oil phase system, placing the oil phase system into an ultrasonic wave treatment apparatus, and carrying out intermittent shaking so as to prepare the stable water-in-oil type heterogeneous moisture evaporation inhibitor. The moisture evaporation inhibitor of the present invention has the significant technical effect in the water resource protection field.
Owner:TARIM UNIV

Adhesive sheet stamping device, adhesive sheet stamping method, part mounter display panel manufacturing method

An adhesive sheet attaching device is provided with: a stage (6); a feeder (10) for feeding adhesive sheet (8) onto the stage (6); a cutter (16); a pressurizer (7) for attaching the adhesive sheet (8) to a target object mounted on the stage (6); a detector (11) for detecting a connecting portion (18); and a controller. When the detector (11) detects the connecting portion (18), the controller stops the operation of the feeder (10) after adhesive sheet (8) of an attachable length up to the connecting portion (18) has been attached. This makes it possible to reliably prevent adhesive sheet (8) containing a connecting portion (18) from being attached to a target object, and to effectively use the adhesive sheet up to the connecting portion (18), thus making it possible to suppress resource loss.
Owner:PANASONIC CORP

Continuous Mining Method of Gently Inclined Vein Based on Combined Chessboard Bottom Structure

InactiveCN106640075BThe production capacity of the panel stope is largeMining time is shortUnderground miningSurface miningCheckerboardMineralogy
The invention discloses a continuous mining method of a gently inclined vein based on a combined checkerboard type bottom structure. The continuous mining method comprises the following steps that (1) an ore body with the inclined angle being 20-35 degrees is divided into middle sections along the tendency of the ore body, inclined top pillars, ore rooms and ore pillars are reserved at the upper ends and the lower ends of the middle sections correspondingly, the ore rooms and the ore pillars are divided and alternately arranged along the trend of the ore body, and an extraction sequence that the ore rooms are mined firstly and then the ore pillars are mined is implemented; (2) a checkerboard type ore removal structure is set below the ore body, and V-shaped trenches are formed at the bottoms of each ore room and each ore pillar; (3) a plurality of short draw shafts are arranged at the bottom of each V-shaped trench at intervals in the horizontal direction of each V-shaped trench, the upper portions of the short draw shafts are connected with the V-shaped trenches, and the lower portions of the short draw shafts are connected with mining roadways of the checkerboard type ore removal structure; (4) extraction is conducted on the ore rooms; and (5) under the protection of a cementation body of an ore room goaf, extraction is conducted on the ore pillars. The continuous mining method of the gently inclined vein has the advantages that production capacity of a panel stope is large, ore removal time is short, the mining safety is high, resource loss is little, and the ore removal structure is reasonable.
Owner:FUZHOU UNIV

Prevention and control method for underground ore mining ground pressure disasters

ActiveCN110017170AEnsuring Safe MiningIncrease recyclingMining devicesUnderground chambersRebarSatellite
The invention discloses a prevention and control method for underground ore mining ground pressure disasters. The prevention and control method comprises the following steps that the position of a stoping block of an underground horizontal stope is obtained; g the position of the stoping block is compared and verified with a corresponding satellite picture; according to the position relation between an upper horizontal roadway and a lower horizontal roadway and a comparison and verification result, an open-air slope slippage model is obtained; a ground pressure action area is determined according to the open-air slope slippage model; and for the ground pressure action area, a prevention mode of changing an ore body stoping sequence, a steel grating anchor supporting mode and a reinforced concrete wall supporting mode is adopted. The method can effectively prevent and control ground pressure disasters, achieves the expected target, and guarantees the safety of ore production.
Owner:CHINA HUAYE GROUP

Intelligent analysis and processing method for surveying and mapping data based on feature recognition and cloud computing

The invention discloses an intelligent analysis and processing method for surveying and mapping data based on feature recognition and cloud computing. The intelligent analysis and processing method for surveying and mapping data based on feature recognition and cloud computing comprises the following steps of: obtaining historical wind blowing information and historical rainfall information corresponding to a surveying area; acquiring a historical water level corresponding to a river in the surveying area; detecting the span corresponding to the river in the surveying area and the pH value of a water body corresponding to the river; detecting soil parameters corresponding to the water bottom of the river in the surveying area and the shores on the two sides of the river in the surveying area; analyzing historical weather information, historical water level information, river water body parameters, river water bottom soil parameters and parameters of the shoreside soil on the two sides of the river in the surveying area. The accuracy and the reliability of a surveying and mapping data analysis result are greatly improved through the method; and accurate analysis of the bridge survey data is realized.
Owner:武汉财源通网络科技有限公司

Arrangement and construction method of special roadway for withdrawing working face of coal mining area

The invention discloses an arrangement and construction method of a special roadway for withdrawing a working face of a coal mining area. The method comprises the following steps of: firstly, arranging a roadway parallel to an uphill and downhill of the mining area as the special roadway for withdrawing the working face of the mining area at the middle position between the uphill and downhill of the mining area and a mining stopping line of the working face, and tunneling the withdrawing roadway by adopting an existing uphill and downhill roadway tunneling method, wherein the tunneling direction is from a transportation gate road to an air return gate road; tunneling and primarily supporting the withdrawing roadway; after supporting is finished, constructing a blasting drill hole in the direction from the vertex angle position of the side face of the working face to a top plate, and carrying out blasting roof cutting, namely cutting off a key layer of the top plate in a blasting mode;and after blasting roof cutting, carrying out secondary reinforcing and reinforcing supporting by adopting an anchor cable. According to the method, smooth withdrawing of the working face can be realized, meanwhile, resource loss can be reduced, and the withdrawing roadway can be arranged between the uphill and downhill of the mining area and the mining stopping line of the working face on the premise of allowable conditions.
Owner:XINWEN MINING GROUP

Reinforced concrete artificial pillar construction method

ActiveCN114109458AHighly precise controlPrecise control of construction heightProps/chocksReinforced concreteArchitectural engineering
The invention discloses a reinforced concrete artificial ore pillar construction method which comprises the following steps: accurately and equally dividing the height of a goaf, prefabricating unit bodies according to the equally-divided height, assembling the prefabricating unit bodies in a top-down inverted manner, and fixing the prefabricating unit bodies which are in top contact with a goaf top plate through anchor cable components. The next prefabricated unit body adjacent to the roof-contacted prefabricated unit body is detachably connected with the lower end of the anchor cable component through a connecting rod component, the subsequent prefabricated unit bodies are sequentially connected with the previous prefabricated unit body through connecting rod components, and the last prefabricated unit body is embedded between the prefabricated unit body above the last prefabricated unit body and a goaf bottom plate. The prefabricated unit bodies are firmly connected to the lower portion of the top plate through the anchor cables and the connecting rods, the top plate is forced to sink to a certain degree under the action of gravity and tension to compress installation gaps between the prefabricated unit bodies, and the artificial pillars are completely connected into a whole. The method is of great significance in improving the stability of the goaf, converting artificial pillars into original pillars to reduce resource loss and ensuring safe mining of mines.
Owner:CHINA MINMETALS CHANGSHA MINING RES INST +1

Polyaniline-adding anti-corrosion peelable high molecular anti-rust film

The invention discloses a polyaniline-adding anti-corrosion peelable high molecular anti-rust film, which is prepared from the following raw materials including aniline, carbon black, ammonium persulfate, lauryl sodium sulfate, aluminum isopropoxide, silane coupling agents A151, tetraethoxysilane, polyoxyethylene aliphatic alcohol ether, polyethylene glycol, octyltriethoxysilane, polyvinyl alcohol, borax, vinyl triamine, sodium citrate, trolamine, aminosilicone, propanetriol, dodecyl sodium sulfate, a proper amount of dodecyl dimethyl betaine, a proper amount of nitric acid, a proper amount of absolute ethyl alcohol and a proper amount of deionized water. The prepared anti-rust agent can form one layer of compact film on the surface of a workpiece. The polyaniline-adding anti-corrosion peelable high molecular anti-rust film has the advantages that the bonding force is high; the adhesion force is high; falling cannot easily occur; the oil-resistant, anti-corrosion and acid-base-resistant performance is good; the peelable performance is good; the operation is convenient; the resource loss can be reduced; the economic benefits are good; the anti-rust film is worthy of being popularized.
Owner:江海涛

Method for cutting and pre-breaking top coal to improve mining efficiency by utilizing water power

The invention relates to a method for cutting and pre-breaking top coal to improve mining efficiency by utilizing water power, which solves the problem that a relatively hard and complete roof coal seam, particularly a coal seam tightly attached to an upper rock body, is difficult for top coal caving, large in coal falling lumpiness and not high in mining efficiency. The method comprises the following steps of: drilling advanced boreholes in a roof coal body to a coal rock boundary surface on a mining working surface by utilizing a drilling machine; extending a high-pressure water pipe in the boreholes; and cutting a plurality of subhorizontal semicircular transverse slots by utilizing the impact force of high-pressure water from top to bottom in the top coal. A plurality of yielding regions are formed by the boreholes in linear distribution in the roof coal body, the mechanical conditions in the coal body are changed, the hard and complete coal body is promoted to be deformed and broken under the effect of advanced concentrated stress, and a plurality of cracks are generated; the coal-rock and coal-coal contact areas are reduced through the transverse slots, and the coal body on the boundary surface is further extruded under the effect of roof high stress, so that the coal body is broken, the adhesive power is lost, manual layering is achieved, and coal is convenient to fall. The method is simple and quick, high in operability and good in timeliness, the coal mining speed can be efficiently increased, and the mining efficiency of the top coal is improved.
Owner:CHINA UNIV OF MINING & TECH

Household photovoltaic anomaly identification method based on intelligent electric meter and geographic information grouping

The invention discloses a household photovoltaic anomaly identification method based on an intelligent electric meter and geographic information grouping, and relates to the field of photovoltaic anomaly identification. At present, abnormal photovoltaics are identified, the calculated amount is large, and the accuracy is low. The method comprises the following steps: finding out three normal usersclosest to a fault user, solving a photo-generated current value according to a single-diode model formula of a photovoltaic module, calculating a power loss time sequence of the fault user in a single day, fitting power loss by using a least square method, and combining output characteristics of a photovoltaic array, and obtaining a fault diagnosis result according to the fitting result. According to the technical scheme, comprehensive judgment is carried out through two modes, the accuracy is high, and resource losses caused by recognition errors are reduced. Through abnormal user identification, the abnormal diagnosis range and calculation amount can be reduced, the abnormal diagnosis time is shortened, and the method has important significance for subsequent maintenance and overhaul of abnormal users; the income and the equipment utilization rate are improved.
Owner:HUZHOU ELECTRIC POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD +1

Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel

The invention discloses a stepped on-pillar continuous filling mining method for deep well super high large breaking ore body panel. An ore body is divided into a front part and a rear part in a super high large breaking ore body center by an transportation roadway, then the front part and the rear part are respectively divided into a plurality of panels, no pillar exists between pillars, each panel is partitioned into a primary extracting drift and a second extracting drift, the panels in the front part are extracted at first and then the panels in the rear part are extracted, the front and rear panels are extracted in a stepped manner, each production technology is carried out in the same level, and procedures can not influence each other; after the stop back production is finished, theprimary extracting drift is filled with cement and the secondary extracting drift is filled by classifying tailings while roof-contacted filling is ensured; and the primary extraction drift and the secondary extraction drift adopt high strength filling topping, and binding materials are added in the filling tailings so as to improve the compression strength of a topping layer. The invention has the characteristics of high extraction safety, small loss and dilution, high mechanical degree, large stope amount, large back production strength, high production capability, short back production time and the like.
Owner:CENT SOUTH UNIV

LED tube with light-emitting module

The invention discloses a LED lamp tube with module light emitting. And the middle section is an aluminum alloy structure with grooves, the inner cavity of the bracket is an integrated hollow structure, the left and right ends of the bracket are provided with covers, and are connected as a whole by a fitting installation method, the spring is arranged on the inner wall of the bracket, The upper plate of the bracket is provided with steel plates installed side by side, the suspension is provided with radial struts, and the struts extend upward to connect with the ceiling, and both ends of the lower cavity of the bracket are connected with the lamp tubes. The present invention is provided with a module frame , when installing, align the LED module board with the inner gap of the installation ring and install it, and pull the connecting piece to make it buckle on the left and right LED module boards. When one end of the lamp board fails, the other lamp boards can continue to illuminate, which can reduce resources. Loss, effectively reducing the cost of lamps.
Owner:江苏天白光电有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products