The invention, which relates to the field of mine
hydrogeology, discloses a method for treating a water-absorbing heaving floor of a bottom plate of a
coal mining roadway. The method comprises the following steps: step one, observing a heaving floor of a bottom plate of a roadway to obtain a maximum height h of the heaving floor and a coordinate of the plane at which the maximum height is located;step two, carrying out slip
casting and hole drilling on two bottom corners of the bottom plate the roadway; step three, carrying out slip
casting reinforcement through the slip-
casting drilling hole; step four, carrying out water-drawing hole drilling on the bottom plate the roadway and arranging a
water pumping pipe and a floral tube in the water-drawing hole; step five, arranging sensors at the top plate and two sides of the roadway; step six, laying a
vacuum pumping system on the bottom plate the roadway; step seven, starting the
vacuum pumping system; step eight, stopping
water pumping after reaching a water-drawing stopping standard; step nine, filling
sedimentation, caused by the
water pumping, of the bottom plate the roadway; and step ten, at
coal mine tunneling and exploitation stages, repeating the steps from the step six to the step nine until
scrap of the roadway under the condition of reaching the h by the height of the heaving floor. According to the invention, vacuum water pumping is carried out on the heaving floor, so that the water-absorbing expansion is eliminated.