The invention relates to the field of
tunnel engineering construction, in particular to a control method of surrounding rocks in water-rich very-broken surrounding
rock tunnel collapse sections. According to the control method, problems in the existing methods that managing circle is long, reinforcing range and effect are bad, secondary geological disasters are triggered easily because of deformation and
cracking of exceeding clearance limit of preliminary bracing and the like are solved. The method includes the following steps: searching and analyzing factors leading to collapse and disaster degree, stabilizing exposed face of an accumulation body and
dewatering and decompressing deep parts, strengthening supporting intensity in the collapse sections and influencing areas, outburst prevention filling and strengthening the collapse accumulation body, grouting reinforcing asymmetrical
peripheral curtains, confirming an excavating method in grouting reinforcing collapse sections and primary supporting patterns, replenishing grouting in parts, excavating inverted arches, and constructing second liners. The control method of surrounding rocks in water-rich very-broken surrounding
rock tunnel collapse sections has the advantages that collapse disposing construction period of water-rich very-broken surrounding rock tunnels is shortened, reinforcing range and intensity of the surrounding rocks are guaranteed, grouting reinforcement is fully conducted on the surrounding rocks in direct collapse areas, deformation in the preliminary bracing is relieved, occurrence of the exceeding clearance limit and the secondary geological disasters is avoided, disposing quality of collapse accidents is improved effectively, and good social benefit and economical benefit are created.