Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

32results about How to "Reduce construction labor costs" patented technology

Tower group smart accurate hoisting control method based on Internet of Things

The invention discloses a tower group smart accurate hoisting control method based on the Internet of Things. The method comprises the steps that (1) an ith tower crane wireless remote control Api applies a hoisting request for a centralized dispatcher AP; (2) the centralized dispatcher AP performs tower crane dispatching according to the hoisting application; (3) the tower crane wireless remote control Api starts the hoisting task; (4) an embedded tower crane monitor unit APk performs path planning and starts a smart cruise; (5) the embedded tower crane monitor unit APk starts a remote control mode and performs accurate positioning, and loading is conducted; (6) the embedded tower crane monitor unit APk starts the smart cruise state again; (7) after an executive tower crane k arrives at the target position, the tower crane wireless remote control Api remotely controls the executive tower crane k for accurate positioning again, and unloading is completed; and (8) the tower crane wireless remote control Api sends a hoisting ending command to the centralized dispatcher AP, the centralized dispatcher AP enables the executive tower crane k to be in an idle state, and so far, the wholehoisting process is completed. The method achieves smart control over hoisting of a tower group.
Owner:XIAN UNIV OF TECH +1

Quick installation method for fully-mechanized coal mining equipment of fully-mechanized coal mining face

The invention provides a quick installation method for fully-mechanized coal mining equipment of a fully-mechanized coal mining face. The quick installation method comprises the following steps that 1, preparation work is conducted; and 2, equipment installation is conducted, and the specific steps comprise that 21, scraper installation is conducted, specifically, a system winch is used for hitting and conveying a scraper chute car to the position of an upper-opening four-corner-channel, and then a cut-hole opposite-pull winch is used for hitting and conveying the scraper chute car to a corresponding position of installation; and then a hydraulic crane is utilized to hoist the chute car to be separated from an installation forklift, after the installation forklift is hit away, the crane continues to hoist and rotate, and the chute car is installed to be in place; and 22, installation of hydraulic supports is conducted, specifically, after hitting, conveying and installing of a working face scraper and a coal machine are completed, a cut-hole upper-opening winch is used for hitting and conveying a hydraulic forklift to pass a four-corner channel to be parked in front of the winch, the hydraulic forklift is parked to be stable and hidden to be compact, and it is ensured that a support car can be smoothly hit and conveyed to the four-corner channel; and then the hydraulic supports are installed sequentially. The fully-mechanized coal mining face equipment is installed and dismantled by using mechanized equipment, the labor intensity of employees is relieved, the working efficiency is further improved, and a future development direction of installation and demolition of fully-mechanized coal mining equipment is pointed out.
Owner:HUAINAN MINING IND GRP

Preparation method of bondable polyfluortetraethylene plate anti-corrosion lining

The invention discloses a preparation method of a bondable polyfluortetraethylene plate anti-corrosion lining. The preparation method comprises the specific steps that a polyfluortetraethylene plate is grinded with abrasive paper, is cleaned with acetone and is put into a mixed solution of sodium, naphthalene and tetrahydrofuran for surface activation treatment; the surface of the treated polyfluortetraethylene plate is coated with an epoxy resin pre-coated adhesive to obtain the treated polyfluortetraethylene plate instant to adhere; then, a steel plate and the polyfluortetraethylene plate are superposed and bonded together through an epoxy hot-melt adhesive, and the anti-corrosion lining is obtained after curing is performed for 24 hours. Due to the fact that a preparation process is simple, the construction is easy, the labor costs for construction is low, the raw materials are easy to obtain, the price is relatively cheap, and the obtained polyfluortetraethylene plate anti-corrosion lining has the advantages of high bonding tensile strength, short drying time, high in bonding stability, excellent physical and chemical properties and the like, and is expected to replace a most often used glass fiber reinforced plastic lining.
Owner:王兆华

Installation method of overlength thin-wall flow guiding wall templates

The invention discloses an installation method of overlength thin-wall flow guiding wall templates. The installation method includes the following steps of 1, carrying out processing on the templatesaccording to design standards; 2, conducting baseplate pouring operation after previously poured wall concrete is subjected to rough chiseling, an then utilizing a movable scaffold platform to installwall reinforcing steel bars and the templates; 3, carrying out pouring of a concrete wall body in the concrete templates; 4, after pouring is finished, detaching the templates after the concrete strength reaches final strength. By adopting the method above, the construction speed is higher, the efficiency is higher, the cycle period of the wall body is effectively shortened, the construction progress is accelerated, and the manpower cost for construction is saved.
Owner:CHINA GEZHOUBA GROUP NO 5 ENG +1

Construction method of full-prefabricated assembly type concrete freight transport suspension type monorail structure

The invention discloses a construction method of a full-prefabricated assembly type concrete freight transport suspension type monorail structure. The method includes the steps that required prefabricated parts are prefabricated and machined and comprise prefabricated raft foundations, prefabricated hollow concrete piers, prefabricated concrete crossbeams and prefabricated concrete track beams; asoil layer in the installation positions of the prefabricated raft foundations is compacted; all the prefabricated parts are transported to a construction site; all the prefabricated raft foundationsare fixed to a treated foundation; each prefabricated raft foundation is provided with the corresponding prefabricated hollow concrete piers and connected with the corresponding prefabricated hollow concrete piers through sleeves in a grouting mode; each prefabricated concrete crossbeam is erected on the corresponding pair of the hollow concrete piers, and each pair of the hollow concrete piers and the corresponding prefabricated concrete crossbeam are connected through plugs; and the corresponding prefabricated concrete track beams are installed on the two sides of each prefabricated concretecrossbeam, each prefabricated concrete crossbeam and the corresponding prefabricated concrete track beams are connected through bolts, and therefore installation of the monorail structure is finished.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

High pile bearing platform tower crane foundation reinforced structure and construction method thereof

The invention provides a high pile bearing platform tower crane foundation reinforced structure which comprises a steel pipe pile, a bearing platform, a sleeve, a sleeve bottom plate and a connectingreinforcing bar. Concrete is poured in the steel pipe pile, one end of the connecting reinforcing bar is fixed into the bearing platform, the other end of the connecting reinforcing bar is fixed intothe sleeve, the steel pipe pile is sleeved with the sleeve, the sleeve bottom plate is fixed to the bottom of the sleeve, the sleeve bottom plate is fixed to the outer wall of the steel pipe pile, thewall of the sleeve is provided with a grouting hole, the grouting hole is connected with a grouting pipe, and the bearing platform and the steel pipe pile are fixed in the mode that grouting materials are injected by the grouting pipe into the sleeve. By means of the reinforced structure, the antidumping performance and distortion resistance of a tower crane pile can be greatly improved, construction steps are simplified, operation is easy and convenient, the construction labor cost is saved, certain economic benefits can be created for construction units, and relevant requirements for environmentally-friendly construction are greatly met.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Water-based metal paint with high adhesive force, and preparation method thereof

The invention discloses a water-based metal paint with high adhesive force, and a preparation method thereof. The water-based metal paint with the high adhesive force comprises the following raw materials by weight: 600-700 parts of fluorocarbon emulsion, 200-300 parts of a water-based alkyd resin, 80-120 parts of water-based aluminum paste, 30-50 parts of composite nano powder, 2-4 parts of sodium carboxymethylinulin, 15-25 parts of propanediol, 1-2 parts of dodecafluoroheptyl-propyl-trimethoxysilane, 1-2 parts of hydrogenated tallowamine polyoxypropylene, 2-3 parts of amino trimethylene phosphonic acid, 3-5 parts of sodium petroleum sulfonate, 1.5-2.5 parts of sodium lauroyl sarcosinate, 1-2 parts of monoethaneamine benzoate, 20-30 parts of magnesium powder, 3-5 parts of a dispersant HT-5040, 1.5-2.5 parts of a wetting agent X-405, 15-20 parts of 2,2,4-trimethyl-1,3-pentanediol monoisobutyrate, 2.5-4.5 parts of a multi-functional additive AMP-95, 2-3 parts of a thickening agent HT-935 and 120-160 parts of water. The water-based metal paint provided by the invention has relatively high adhesive force and excellent performances of salt fog resistance, acid and alkali resistance, gasoline resistance, ultraviolet light resistance, aging resistance, high temperature resistance and low temperature resistance, has an anti-corrosion effect and anti-corrosion life two times better than that of common anti-rust paint, and is suitable for application in various steel structural components.
Owner:SUZHOU ZHONGLI HEAT PRESERVATION & ENERGY SAVING MATERIAL CO LTD

Releasing device for cable laying in tunnel and using method thereof

The invention discloses a releasing device for cable laying in a tunnel and a using method thereof. The device comprises a right triangle frame structure, a cable pulley and a cable feeding angle adjusting structure, wherein the cable pulley is arranged on the bevel edge of the right triangle frame structure and used for transporting a cable; the cable feeding angle adjusting structure is arrangedat the junction of the bevel edge and the vertical edge of the right triangle frame structure and used for adjusting the horizontal angle of the tail end of the cable and guiding the cable to a cablerack; the right triangle frame structure comprises telescopic rods; the telescopic rods are arranged on the bevel edge and the vertical edge of the right triangle frame structure respectively and areused for adjusting the height of the releasing device. According to the releasing device, all the components are detachably connected, assembling difficulty is low, and working efficiency can be effectively improved; meanwhile, the upper end of the cable feeding angle adjusting structure is movably connected, only the weight of a small section of cable is borne in the using process, borne load issmall, and the risk of rollover of a cable laying vehicle is avoided.
Owner:国网四川省电力公司技能培训中心 +1

An unreinforced steel-UHPC composite bridge deck structure and a construction method thereof

An unreinforced steel-UHPC composite deck structure comprises a UHPC bridge deck, an orthotropic steel bridge deck and a connecting bolt, and that main part of the UHPC bridge deck is not provided with stress reinforcement and structural reinforcement. When the UHPC bridge deck is cast in-situ in sections, the joint part adopts a keytooth bite joint or a flat joint with close reinforcement, and the keytooth bite joint is matched with a metal corrugated sleeve and a joint thread steel bar. The invention also discloses a construction method of the composite bridge deck structure. This steel-UHPCcomposite bridge deck structure is simple, which significantly reduces the raw material cost of composite bridge deck structure, reduces the construction human cost, and shortens the construction period, and the overall bearing capacity and fatigue resistance of bridge deck meet the stress requirements. the unreinforced steel-UHPC composite bridge deck structure is suitable for fatigue strengthening of orthotropic steel bridge deck and rigid deck paving of new steel bridge.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Air exhaust type drainage device for water-rich foundation pit with low permeability coefficient and construction method

The invention discloses an air exhaust type drainage device for a low-permeability-coefficient water-rich foundation pit and a construction method. The air exhaust type drainage device comprises a drill bit and an outer pipe arranged outside an inner pipe in a sleeving mode; a positioning groove is formed in the periphery of the top end of the drill bit and internally provided with a rubber lining; the air exhaust type drainage device further comprises water seepage holes formed in the lower half pipe body of the inner pipe; and a water suction hose is arranged in the inner pipe, the lower end of the water suction hose is coiled in a downwards-sunken arc-shaped groove in the upper end face of the drill bit, and the upper end of the water suction hose penetrates through a hose hole in the side wall of the top of the inner pipe and then is connected with a small water pump. The construction speed is high, drainage is conducted from the peripheral side of the foundation pit through mounting holes, and the influence on the foundation pit is avoided; a negative pressure state is created in the inner pipe in an air suction type drainage mode, the device is suitable for drainage of a soil layer with a low permeability coefficient and is also suitable for foundation pit soil layers under other working conditions, and the universality is high; and meanwhile, the cost is low, a constructor does not need to watch at any time, the construction labor cost is saved, and high economic benefits are achieved.
Owner:SINOHYDRO BUREAU 5

Self-drilling exhaust screw easy to use

The invention relates to a self-drilling exhaust screw easy to use, and belongs to the technical field of water circulation system equipment. When exhaust devices are additionally arranged in the later period of network construction, the technological process is complex, the workload is high, the cost is high, water resource waste is prone to being caused, such technical problems are solved with the self-drilling exhaust screw easy to use. According to the scheme for solving the technical problems, the self-drilling exhaust screw easy to use comprises a self-drilling screw body and a sealing gasket. An annular sealing gasket groove is formed in the bottom surface of the head of a self-drilling screw body in the circumferential direction of the top of a screw rod. The sealing gasket is installed in the annular sealing gasket groove. The screw rod of the self-drilling screw is provided with an exhaust channel in the direction of a central axis, an air inlet of the exhaust channel is formed in the bottom of the screw rod of the self-drilling screw rod, and an air outlet of the exhaust channel is formed in the side wall of one side of the upper portion of the screw rod of the self-drilling screw. The head of the self-drilling screw body is a hex screw head. The self-drilling exhaust screw easy to use has the advantages of being reasonable in structural design, safe to use, easy andquick to operate and the like.
Owner:山西桐鑫宇环保设备有限公司

Transferring, weighing and feeding device and distribution system

InactiveCN112985554ASolve the problem that the thickness does not meet the design requirementsPrecise weighing controlBuilding material handlingWeighing apparatus with automatic feed/dischargeDistribution systemLoad cell
The invention relates to a transferring, weighing and feeding device and a distribution system. The device comprises: a support which is provided with a material receiving end and a material discharging end; a carrying trolley which is movably arranged on the bracket and can reciprocate between the receiving end and the unloading end; a hopper arranged on the carrying trolley, wherein a door opening and closing mechanism capable of being opened and closed is arranged at a discharging opening of the hopper; a weighing sensor arranged between the carrying trolley and the hopper; a door opening executing mechanism arranged at the discharging end and used for opening the door opening and closing mechanism; and a door closing execution mechanism arranged on the bracket and used for closing the door opening and closing mechanism. The transferring, weighing and feeding device has the functions of automatic weighing, automatic transferring, automatic discharging and the like, manual participation is not needed in the whole process, and the construction labor cost can be greatly reduced.
Owner:GUANGDONG BOZHILIN ROBOT CO LTD

Whole bathroom frame foaming tile floor and manufacturing method thereof

The invention discloses a bathroom floor and a manufacturing method thereof. The defects of low manual tile fixing efficiency, long period, high labor cost, difficult quality guarantee and working environment unfavorable to body health of a traditional bathroom are overcome, and the problem that common whole bathroom floor in the prior art are non-heat-preservation and non-sound-insulation and tiles fixed on the surface easily drop are solved. A whole bathroom frame foaming tile floor consists of a reinforced frame, a polyurethane foaming material and tiles. The reinforced frame is made of a polyester laminar film plastic or glass reinforced plastic of a composite material having certain strength. The reinforced frame is provided with a plurality of grooves corresponding to and matched with the tiles. The sunken bottom faces of the grooves are inclined faces located in one plane so as to form a certain inclination face for water draining on the floor surface fixed with the tiles. The sunken bottom faces of the grooves are higher than the bottom face of the reinforced frame. The reinforced frame is provided with a dropping water groove facilitating water draining of the bathroom.
Owner:苏州有巢氏家居有限公司

Integrated composite wall decorative building block and construction method thereof

The invention discloses an integrated composite wall decorative building block and a construction method thereof. The decorative building block comprises a finish coat and a brick body, the finish coat and the brick body are formed by integrally mixing foaming cement and ceramic particles, the finish coat is integrally formed on the front face of the brick body through foaming, a longitudinal splicing groove is formed in one of the left side and the right side of the brick body, a longitudinal splicing protruding strip is formed in the other of the left side and the right side of the brick body and corresponds to the longitudinal splicing groove, a horizontal splicing groove is formed in the bottom face of the brick body, a horizontal splicing protruding strip is formed on the top face ofthe brick body and corresponds to the horizontal splicing groove, and a cross groove is formed in the back face of the brick body; the finish coat and the brick body of the decorative building block are formed integrally, and have the advantages that the finish coat never falls off, aging and corroding are resistant, anti-permeability is high, the weight is small, and the properties of heat preservation and sound insulation are good; according to the construction method, high efficiency and rapidness are realized, and construction and labor costs are low.
Owner:JINJIANG MSMK HANDICRAFT ARTICLE CO LTD

Decorative board with sound insulation function

The invention discloses a decorative panel with sound insulation function, which comprises an outer panel, an inner panel, a groove, a bump, a bolt hole, a clamp block, a clamp slot, a solid block and a sound insulation panel. The invention has a simple structure and ensures the stability of its connection structure. The sound insulation board can directly remove external noise. One end of the inner plate is provided with a groove and the other end is provided with a bump. The groove can form a closed inner panel for the end-to-end connection of the protrusions, which is conducive to rapid sound insulation and has a good sound insulation effect. A variety of colors and shapes can be selected for combination to coordinate with the surrounding environment to form a beautiful landscape. Prefabricated construction improves work efficiency, shortens construction time, and saves construction and labor costs. Installed in parallel with other products, easy to maintain and update. Using ultra-fine glass wool, because of its high melting point, non-flammable, fully meet the requirements of environmental protection and fire protection regulations.
Owner:全南县韬寻机械设备开发有限公司

Anti-peeling thermal insulation material, and construction method thereof

InactiveCN109851286AReduce the chance of cold shrinkage crackingEnhance cold and heat shrinkabilityCovering/liningsFiberThermal insulation
The invention discloses an anti-peeling thermal insulation material, and a construction method thereof. The anti-peeling thermal insulation material comprises 0.8 part of a component A and 1.0 part ofa component B; the component A comprises water, X-405 alkylphenol polyoxyethylene wetting agent, glycol, BIT bactericide, an aerogel, and a dodecanol film forming auxiliary agent; the component B comprises a cement inorganic coagulant, S18 glass micro bead, anti-cracking fiber, low temperature anti-cracking argil, filling material 200 mica powder, water retention methyl cellulose, and a cement dispersant water reducer. According to a preparation method, organic inorganic adhesive material combination is adopted, so that an obtained product possesses inorganic material durability and rigidity.Adoption of the anti-peeling thermal insulation material and the construction method are capable of reducing construction worker labor cost, saving materials, and shortening machinery construction period. Cold and hot shrinkage cracking safety problems are solved, rigidity and flexibility combination is realized, the durability is better, and product is capable of reaching A flame resistance grade.
Owner:湖南梨树园涂料有限公司

Drill tail exhaust screw

The invention relates to a drill tail exhaust screw, and belongs to the technical field of water circulation systems and equipment. The drill tail exhaust screw solves the technical problems that whenan exhaust unit is added to a pipe network in the later period, the technological process is complicated, workload is high, cost is high and water resource waste easily occurs. As one solution, the drill tail exhaust screw comprises a drill tail screw, a sealing gasket and a conical exhaust screw body. An annual sealing gasket groove is formed in the bottom face of the head portion of the drill tail screw in the circumferential direction of the top of a threaded rod. The sealing gasket is disposed in the annual sealing gasket groove. An exhaust passage is formed in the threaded rod of the drill tail screw in the direction of central axis. A threaded hole matched with the conical exhaust screw body is formed in the head portion of the drill tail screw body in the direction of central axis.A conical port is formed in the bottom of the threaded hole. The bottom of the threaded hole communicates with the top of the exhaust passage. The conical exhaust screw body is disposed in the threaded hole. The bottom of the conical exhaust screw body is matched with the conical port. The drill tail exhaust screw has the advantages of being reasonable in structural design, safe to use, easy andrapid to operate and the like.
Owner:山西桐鑫宇环保设备有限公司

An integrated composite wall decorative block and its construction method

The invention discloses an integrated composite wall decorative building block and a construction method thereof. The decorative building block comprises a finish coat and a brick body, the finish coat and the brick body are formed by integrally mixing foaming cement and ceramic particles, the finish coat is integrally formed on the front face of the brick body through foaming, a longitudinal splicing groove is formed in one of the left side and the right side of the brick body, a longitudinal splicing protruding strip is formed in the other of the left side and the right side of the brick body and corresponds to the longitudinal splicing groove, a horizontal splicing groove is formed in the bottom face of the brick body, a horizontal splicing protruding strip is formed on the top face ofthe brick body and corresponds to the horizontal splicing groove, and a cross groove is formed in the back face of the brick body; the finish coat and the brick body of the decorative building block are formed integrally, and have the advantages that the finish coat never falls off, aging and corroding are resistant, anti-permeability is high, the weight is small, and the properties of heat preservation and sound insulation are good; according to the construction method, high efficiency and rapidness are realized, and construction and labor costs are low.
Owner:JINJIANG MSMK HANDICRAFT ARTICLE CO LTD

A support system for inspection wells in municipal road renovation construction

The invention discloses an in-well supporting system for a municipal road overhauling and constructing inspection well. The in-well supporting system for the municipal road overhauling and constructing inspection well comprises a main supporting pipe, a first triangular supporting frame, a second triangular supporting frame and an iron chain; a bolt hole is reserved in the top of one end of the main supporting pipe, the bottom of the main supporting pipe is provided with a notch, and the other end of the main supporting pipe is provided with a clamping groove; the first triangular supporting frame comprises three supporting rods; one end of the first supporting rod and one end of the second supporting rod are jointly connected with a connecting plate, a nut then is connected to the connecting plate, and the other end of the first supporting rod and the other end of the second supporting rod are fixedly connected with the two ends of the third supporting rod correspondingly; one end of the iron chain is arranged on the first / second supporting rod in a sleeving manner; the second triangular supporting frame comprises three auxiliary supporting pipes; the first auxiliary supporting pipe is arranged outside the third supporting rod in a sleeving manner; the two ends of the first auxiliary supporting pipe are fixedly connected with one end of the second auxiliary supporting pipe and one end of the third auxiliary supporting pipe correspondingly; and the other ends of the second auxiliary supporting pipe and the third auxiliary supporting pipe are rotationally connected to the main supporting pipe correspondingly. The supporting system can achieve fast installing and detaching, can be disassembled after being used, and is convenient to transport and high in generalizability.
Owner:HUANGHUAI UNIV

Large-size embedded part carrying and mounting equipment in narrow and small space of pipe gallery

The invention discloses large-size embedded part carrying and mounting equipment in a narrow and small space of a pipe gallery. The large-size embedded part carrying and mounting equipment comprises a movable base; a bearing platform is installed above the movable base in a lifting mode, and a through groove is formed in the upper portion of the bearing platform; a sliding part is used for placing a large embedded part and is arranged in the through groove in a sliding manner; a pulling rope assembly is obliquely pulled between the sliding part and the upper portion of the embedded part, after the embedded part is placed on the sliding part, the length of the pulling rope assembly is adjusted, and the embedded part is made to turn towards the pulling rope assembly with the lower portion of the embedded part as a fulcrum. The problem that the embedded part of the underground comprehensive pipe gallery is low in embedded installation efficiency is solved.
Owner:中建八局轨道交通建设有限公司

Intelligent and precise hoisting control method for group towers based on Internet of Things

The invention discloses a tower group smart accurate hoisting control method based on the Internet of Things. The method comprises the steps that (1) an ith tower crane wireless remote control Api applies a hoisting request for a centralized dispatcher AP; (2) the centralized dispatcher AP performs tower crane dispatching according to the hoisting application; (3) the tower crane wireless remote control Api starts the hoisting task; (4) an embedded tower crane monitor unit APk performs path planning and starts a smart cruise; (5) the embedded tower crane monitor unit APk starts a remote control mode and performs accurate positioning, and loading is conducted; (6) the embedded tower crane monitor unit APk starts the smart cruise state again; (7) after an executive tower crane k arrives at the target position, the tower crane wireless remote control Api remotely controls the executive tower crane k for accurate positioning again, and unloading is completed; and (8) the tower crane wireless remote control Api sends a hoisting ending command to the centralized dispatcher AP, the centralized dispatcher AP enables the executive tower crane k to be in an idle state, and so far, the wholehoisting process is completed. The method achieves smart control over hoisting of a tower group.
Owner:XIAN UNIV OF TECH +1

Disassembered insulation tube shell

The invention provides a detachable thermal insulation casing and an assembling and installation method thereof and belongs to the technical field of thermal insulation casing. According to the detachable thermal insulation casing, a first layer of thermal insulation cotton, a second layer of thermal insulation cotton and a third layer of thermal insulation cotton are arranged in a staggered mode in the annular and longitudinal directions; the exterior of the third layer of thermal insulation layer cotton is provided with a pipe casing fixing frame; the first layer of thermal insulation cotton, the second layer of thermal insulation cotton, the third layer of thermal insulation cotton and the pipe casing fixing frame are fixedly connected through high temperature resistant low heat conducting connecting parts; an extensible pipe casing is arranged inside the thermal insulation casing according to the extension capacity of a pipeline; an extension portion is formed by materials with super low thermal conductivity coefficient; the extensible pipe casing is formed by an inner portion and an outer portion which are overlapped; the two portions are in normal thermal insulation thickness and accordingly when the extensible pipe casing is stretched out or draws back, the thermal insulation effect at the extensible pipe casing position is not influenced. The detachable thermal insulation casing has the advantages of being convenient and rapid to install, not easy to fall off when being installed, good in insulation effect, allowing detachment for a plurality of times and allowing integral detachment due to the fact that the pipe casing is connected by the high temperature resistant low heat conducting connecting parts.
Owner:潘文丽

Construction method of foundation reinforcement structure of high pile cap tower crane

The invention provides a high pile bearing platform tower crane foundation reinforced structure which comprises a steel pipe pile, a bearing platform, a sleeve, a sleeve bottom plate and a connectingreinforcing bar. Concrete is poured in the steel pipe pile, one end of the connecting reinforcing bar is fixed into the bearing platform, the other end of the connecting reinforcing bar is fixed intothe sleeve, the steel pipe pile is sleeved with the sleeve, the sleeve bottom plate is fixed to the bottom of the sleeve, the sleeve bottom plate is fixed to the outer wall of the steel pipe pile, thewall of the sleeve is provided with a grouting hole, the grouting hole is connected with a grouting pipe, and the bearing platform and the steel pipe pile are fixed in the mode that grouting materials are injected by the grouting pipe into the sleeve. By means of the reinforced structure, the antidumping performance and distortion resistance of a tower crane pile can be greatly improved, construction steps are simplified, operation is easy and convenient, the construction labor cost is saved, certain economic benefits can be created for construction units, and relevant requirements for environmentally-friendly construction are greatly met.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

A construction method for a fully prefabricated concrete freight suspension monorail structure

The invention discloses a construction method of a full-prefabricated assembly type concrete freight transport suspension type monorail structure. The method includes the steps that required prefabricated parts are prefabricated and machined and comprise prefabricated raft foundations, prefabricated hollow concrete piers, prefabricated concrete crossbeams and prefabricated concrete track beams; asoil layer in the installation positions of the prefabricated raft foundations is compacted; all the prefabricated parts are transported to a construction site; all the prefabricated raft foundationsare fixed to a treated foundation; each prefabricated raft foundation is provided with the corresponding prefabricated hollow concrete piers and connected with the corresponding prefabricated hollow concrete piers through sleeves in a grouting mode; each prefabricated concrete crossbeam is erected on the corresponding pair of the hollow concrete piers, and each pair of the hollow concrete piers and the corresponding prefabricated concrete crossbeam are connected through plugs; and the corresponding prefabricated concrete track beams are installed on the two sides of each prefabricated concretecrossbeam, each prefabricated concrete crossbeam and the corresponding prefabricated concrete track beams are connected through bolts, and therefore installation of the monorail structure is finished.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products