The invention discloses a method for putting in and taking out a
coiled tubing being used as a
production tubing string. The method for putting in the
coiled tubing being used as a
production tubing string comprises steps of mounting a well head
blowout preventer system, an injection head and the
coiled tubing above a tubing head four-way joint and a main valve, mounting a tool string to the lower end of the coiled tubing, and putting into a designed depth;
cutting the coiled tubing off by a shear ram of a first
blowout preventer; sequentially mounting a hanging connector and a
tubing hanger to the upper end of the
cut low-half coiled tubing, stretching the
cut up-half coiled tubing out of a blowout preventing tubing, and connecting the
cut up-half coiled tubing with a hydraulic retractable feeding / recycling tool; putting the
tubing hanger in the tubing head four-way joint; and fixing the
tubing hanger of the coiled tubing into the tubing head four-way joint. According to the method for putting in and taking out the coiled tubing being used as the
production tubing string, the coiled tubing replaces a conventional tubing and is directly used a production tubing string, a standard gas production tree well head is achieved after construction, and the sealing effect of the well head can be ensured at the same time.