The invention relates to a construction process for a
pile slab type non-soil roadbed highway. In the process, a rotary drilling rig is used for rotary drilling to form holes, after the holes are formed,
cement mortar is poured into the
pile holes, then prefabricated tubular piles are vertically hoisted and then are implanted into the
pile holes, a vibratory hammer is started to hammer so that the tubular piles are effectively in contact with the bottoms of the pile holes, then natural curing is carried out after perpendicularity and plane positions of the tubular piles are corrected, pile heads are treated, prefabricated beam slabs are erected and assembled, assembling joints and expansion joints of the prefabricated beam slabs are treated, a waterproof layer is constructed, in the period, guard bars are mounted,
asphalt concrete is paved, and then construction is finished. The construction process has the outstanding advantages that a roadbed does not require to be heightened by soil, a large use amount of earthwork is reduced, and meanwhile, permanent occupation of a highway roadbed is reduced. The process conforms to development tendency of
industrial construction, standard design, industrial production and specialized construction can be realized, moreover, a construction period is greatly shortened,
engineering quality is improved, construction cost is reduced, and
working hours can be shortened by about 20%.