The invention relates to a
natural gas interactive scheduling method for an
offshore oil and gas platform group. The method comprises the steps of obtaining a
natural gas network topology structure and a
power grid topology structure of the
offshore oil and gas platform group; acquiring design parameters and operation parameters of key equipment of a
natural gas system and key equipment of a powersystem of the offshore oil-gas platform group; establishing an optimization model of the interconnected power
system according to the design parameters and the operation parameters, determining an objective function to be minimum in natural gas self-consumption of all
turbine units and minimum in unit
pollutant emission penalty cost, and determining constraint conditions; establishing an optimization model of the interconnected natural gas
system according to the design parameters and the operation parameters, determining that an objective function is the minimum sum of all
torch emptying amounts and the minimum overall
pollutant emission penalty cost of the system, and determining constraint conditions; and solving the two optimization models, wherein a solving result is used for realizing interactive scheduling of the natural
gas pipeline network. The
energy consumption of the offshore platform can be reduced, the energy mutual assistance between the platforms is improved, and the
energy supply stability of the platform group is improved.