Offshore oil-gas platform group natural gas interactive scheduling method

A scheduling method and natural gas technology, applied in the fields of instruments, constraint-based CAD, data processing applications, etc., can solve the problems of large hot backup, low power generation efficiency of a single platform, less consideration of optimal scheduling, etc. Reasonable utilization and realization of the effect of load demand response

Active Publication Date: 2020-07-24
CHINA NAT OFFSHORE OIL CORP +2
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The traditional offshore oil production platform is an isolated system. The platform meets the power demand of the platform through its own associated gas and crude oil. Due to the limitation of the space size of the platform and the energy conversion efficiency of the power generation equipment, the platform generally uses multiple micro gas turbines to generate electricity in parallel. A single platform The power generation efficiency is not high, and the thermal backup is large. The energy management system mainly focuses on the stable operation of the power grid, and seldom considers optimal scheduling

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Offshore oil-gas platform group natural gas interactive scheduling method
  • Offshore oil-gas platform group natural gas interactive scheduling method
  • Offshore oil-gas platform group natural gas interactive scheduling method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0043] Such as figure 1 As shown, this implementation case includes three oil and gas production equipment groups (CEP1, CEP2, CEP3), two land natural gas terminals, the oil field is divided into three production areas, each production area contains a central oil and gas processing platform, and each center There are several oil wells and gas wells around the processing platform, and natural gas turbine generators are installed on the central platform. The platform group includes two onshore natural gas terminals, and the central platform sends natural gas to the terminals through natural gas pipelines. The three central platforms realize the interconnection of electricity and natural gas through cables and natural gas pipelines. The entire regional platform group forms a natural gas and electric power interconnection system to realize mutual energy support. Since the energy of the platforms comes from natural gas, the interactive scheduling of natural gas is particularly imp...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a natural gas interactive scheduling method for an offshore oil and gas platform group. The method comprises the steps of obtaining a natural gas network topology structure and a power grid topology structure of the offshore oil and gas platform group; acquiring design parameters and operation parameters of key equipment of a natural gas system and key equipment of a powersystem of the offshore oil-gas platform group; establishing an optimization model of the interconnected power system according to the design parameters and the operation parameters, determining an objective function to be minimum in natural gas self-consumption of all turbine units and minimum in unit pollutant emission penalty cost, and determining constraint conditions; establishing an optimization model of the interconnected natural gas system according to the design parameters and the operation parameters, determining that an objective function is the minimum sum of all torch emptying amounts and the minimum overall pollutant emission penalty cost of the system, and determining constraint conditions; and solving the two optimization models, wherein a solving result is used for realizing interactive scheduling of the natural gas pipeline network. The energy consumption of the offshore platform can be reduced, the energy mutual assistance between the platforms is improved, and the energy supply stability of the platform group is improved.

Description

technical field [0001] The invention relates to the technical field of energy comprehensive utilization optimization of offshore oil and gas platform groups, in particular to a natural gas interactive scheduling method for offshore oil and gas platform groups. Background technique [0002] Offshore oil and gas platform is an important work platform for exploiting seabed mineral resources, and its energy power system safety and stability has always been the focus of research. The traditional offshore oil production platform is an isolated system. The platform meets the power demand of the platform through its own associated gas and crude oil. Due to the limitation of the space size of the platform and the energy conversion efficiency of the power generation equipment, the platform generally uses multiple micro gas turbines to generate electricity in parallel. A single platform The power generation efficiency is not high, and the thermal backup is large. The energy management ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/06G06F30/20G06F111/04
CPCG06Q50/06Y04S10/50Y02E40/70
Inventor 娄清辉邱银锋牛洪海魏澈陈俊刘国锋高元李强管晓晨万光芬林阳王凯藤徐彬车久玮
Owner CHINA NAT OFFSHORE OIL CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products