The invention relates to a shield construction method for clearing obstacles by
punching a rock stratum section, comprising the following steps of: at first, determining a
punching obstacle-clearing construction area as full-section
punching construction; lapping at a
pile hole position, wherein a bottom elevation of a
pile is lower than a bottom elevation of a shield tunnel; determining a last-stage punching
pile width range according to a probing result; carrying out punching obstacle-clearing construction by using a drilling construction process of a punching and filling pile; and directly injecting rapid-rigid
slurry to fill an underground guide
pipe after clearing the obstacles by punching. The obstacle-clearing construction method of a punching pile
machine provided by the invention has the advantages of simple equipment, low manufacturing price,
high security,
rapid construction, smaller environment influence and the like, provides a novel treatment means for meeting the obstacles in underground
engineering, such as shield,