The invention provides a hollow floor
system construction method adopting plaster mold boxes, and relates to the technical field of buildings. The method comprises the following steps that S1, construction preparation is carried out, and the specification, the number and the reserved pre-burying condition of the plaster mold boxes are determined; S2, a support is arranged, and a formwork is laid on the support; S3, rib beam position lines, plaster mold box control lines,
steel bar distribution lines and embedded reserved position lines of water and
electricity installation pipelines are markedout on the formwork; S4, rib beam steel bars are bound according to the rib beam position lines, and then bottom plate steel bars are bound according to the
steel bar distribution lines; S5, a plurality of
cushion blocks are arranged at each plaster mold box
control line on each bottom plate
steel bar, and the plaster mold boxes are arranged on the
cushion blocks; S6, the plaster mold boxes are subjected to anti-floating treatment; S7, floor
system upper-layer steel bars and plate end support negative bars are bound; S8, concrete is poured, and vibration is carried out; and S9, after the concrete is shaped, the formwork is dismantled. According to the hollow floor
system construction method adopting the plaster mold boxes, and the cost can be lower.