The invention discloses an earthwork transportation
system used for foundation pit
engineering and a construction method. The transportation
system comprises a steel protective
barrel, a power device,a
grout separating device, a guide
pipe, a gas conveying
pipe, a
pipe-blocking-preventing device, a gas-liquid mixing device and a fixed supporting structure; the steel protective
barrel is embeddedinto soil and is filled with mud and earthwork mixing liquid, the power device is an
air compressor, the
grout separating device is used for guaranteeing the using performance and circulated utilization of mud, the guide pipe is divided into a vertical part and a horizontal part, the vertical part of the guide pipe is inserted into the steel protective
barrel, and the horizontal part of the guidepipe is paved on the ground and fixed; the starting end of the gas conveying pipe is connected with the power device, the vertical part of the guide pipe is inserted into the steel protective barrel in a fixed connection manner, and the
tail end is connected with the gas-liquid mixing device; and the pipe-blocking-preventing device prevents the transporting pipe from being blocked. The influencesof surrounding environments on the construction process using the transportation
system are small, the occupied construction floor space is small, the earthwork transportation system is suitable for city compact district foundation trench earthwork construction, and
pollution to the surrounding environment can be reduced.