The invention discloses an anti-seismic prefabricated
assembly bridge
pier and a construction method thereof. The bridge
pier is formed by assembling a
pier column upper section, a pier column lower section, prestressing tendons and a rubber elastic layer to form a bridge pier body, notches are reserved around the prefabricated bridge pier body, energy-consuming
steel plates are anchored into thenotches, and it is ensured that the energy-consuming
steel plates do not be bent to the inner side of a prefabricated pier column under the effect of loads; and split bolts are arranged between the oppositely-arranged energy-consuming
steel plates, and it is ensured that the energy-consuming steel plates cannot be bent to the outer side of the pier column. By arranging the rubber elastic layer, onthe one hand, the anti-
seismic energy dissipation capacity of the externally-mounted energy-consuming steel plates and the built-in rubber elastic layer is fully utilized, and the energy-consuming steel plates and the rubber elastic layer cooperate to jointly ensure the anti-seismic performance; on the other hand, collision between the upper and lower sections and caused by the earthquake can beprevented, and
cracking and crushing of concrete are effectively prevented. By means of the construction method, the technical
route of pre-
prefabrication and on-site
assembly is adopted, and the prefabricated energy-consuming steel plates, the pier column upper section and the pier column lower section can be connected together through an anchoring device and the prestressing tendons, and
assembly is completed simply and efficiently.