Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

65results about How to "Save construction resources" patented technology

Light cast-in-situs concrete wallboard

A light concrete wall slab cast in-situ is composed of main body and welded reinforcing steel bar net in said main body. Said main body is made up of water, cement, powdered coal ash, slag powder, silicon powder, efficient composite water-reducing agent, polypropylene fibres, glass fibre fabric or alkali-resistant plastic-coated glass staple, modified cement polymer emulsion (or powder), haydite, and sand. Its advantages are light weight, high strength, low shrinkage, not deforming and cracking, and low cost.
Owner:张英保

Construction method for right-angle skew tunnel-entering cover arch of unsymmetrical-loaded and shallow-buried tunnel

ActiveCN103775093ASafe and smooth entryReduce the amount of earth and rock cut and excavatedUnderground chambersTunnel liningEngineeringLandform
The invention belongs to a construction method for the right-angle skew tunnel-entering cover arch of an unsymmetrical-loaded and shallow-buried tunnel. In the method, conventional cover arches and steel arches are erected by adopting a left and right staggered erecting method, that is, the erecting direction of the steel arches and the slanting direction of the axial lead of a tunnel traveling axial lead form an angle of 45 to 60 degrees, the steel arches at a left side end and the steel arches at the right side end are erected in a staggered manner, the distance between the adjacent steel arches which deviate from the right side of a mountain is smaller than the distance between the adjacent steel arches which are close to left side of the mountain, the distances between the steel arches within a range of 20 to 30 m in a hole are adjusted, a conventional orthogonal cover arch is manufactured into a cover arch which is in the right-angle skew with a tunnel-entering direction. The method provided by the invention can ensure smooth and safe hole entering of an unsymmetrical-loaded and shallow-buried tunnel in a narrow tunnel portal topographic condition, the amount of soil stone excavated from a mountain body can be greatly reduced, the construction resources are saved, environmental protection is facilitated, and the method has the advantages that the method is simple and practical, labor and time are saved, the construction cost is low, the construction period is short, the effects of safety and reliability are realized, and high efficiency and good quality are achieved.
Owner:NO 1 ENG CO LTD OF FHEC OF CCCC

Building rubbish disposal method

The invention discloses a building rubbish disposal method. The building rubbish disposal method comprises the following building rubbish crushing and screening working procedures of soil removal, primary crushing, primary screening, artificial sorting, secondary crushing and secondary screening. Through repeated crushing and screening of building rubbish, the building rubbish can form recyclable aggregate, thus saving building resources.
Owner:BCEG RESOURCES RECYCLING CO LTD

Construction method of basement pile-wall integrated structure system

InactiveCN110080242AEffectively control deformationControl deformationArtificial islandsProtective foundationBasementFloor slab
The invention relates to the technical field of building construction. The invention discloses a construction method of a basement pile-wall integrated structure system. A bottom plate connecting plate, a floor slab connecting plate and a top plate connecting plate are arranged between foundation pit supporting piles and a basement exterior wall. The bottom plate connecting plate, the floor slab connecting plate and the top plate connecting plate are respectively connected with a bottom plate, a floor slab and a top plate of a basement through steel bar planting bars and are poured simultaneously; the foundation pit supporting piles and the basement structure are stably connected, the foundation pit supporting piles are fully used as one part of the permanent structure in the permanent usestage, and the advantages of protecting the environment, saving building resources, shortening the construction period and the like are achieved; meanwhile, basement waterproof operation is carried out while the construction steps of bar planting, formwork erecting, steel bar binding and the like are carried out, all floors are waterproof layer by layer and poured layer by layer, the basement non-poured space can be fully utilized for waterproof construction operation, the waterproof construction is not limited by the space between a basement outer wall and a supporting pile, and the waterproof effect is guaranteed.
Owner:GUANGZHOU URBAN PLANNING & DESIGN SURVEY RES INST

Biochar pulp prepared from garbage leachate serving as raw material and preparation process thereof

The invention discloses a biochar pulp prepared from garbage leachate serving as a raw material and a preparation process thereof, and aims to provide the biochar pulp prepared from the garbage leachate serving as the raw material and the preparation process thereof, which have the advantages of the combination of energy saving and emission reduction and environmental management and low cost. Thepreparation process comprises the following steps of: mixing biochar, the garbage leachate, methanol, high-temperature sand and additives serving as raw materials; and crushing, homogenizing and filtering the mixed raw materials to prepare the biochar pulp. The biochar pulp is used for replacing fuel oil so as to effectively save energy and reduce fuel cost, plays a good part in managing urban environment, and fulfills the aims of promoting economic and environmental health and sustainable development. The biochar can be widely applied in the fields of substitute oil firing such as industrialboilers, power station boilers, industrial furnaces and the fields of urban environment management and the like.
Owner:珠海中水环保科技有限公司

High-resolution video image compression transmission method and system based on FPGA

The invention discloses a high-resolution video image compression transmission method and system based on an FPGA. The method comprises the following steps: acquiring a video data stream and sending the video data stream to the FPGA; obtaining a YCbCr4:4:4 format through color gamut conversion, circularly writing into 16 video row cache RAMs, dividing eight RAMs into one group and two groups, andafter each group of RAMs is written, sequentially reading data from left to right and reading eight columns each time to form an 8X8 image data block until the whole group of data is completely read;performing DCT transform, ZIGZAG scanning, quantification, RLE run length coding and Huffman coding sequentially on the 8*8 image data blocks until all the 8 rows of data are processed according to the 8*8 image data blocks, and if the number of points of the last block is smaller than 8 pixels, performing corresponding complementation; and completing compression until the processing of the wholeframe of image is finished. The system comprises an FPGA, and the FPGA comprises video data stream input, write RAM control, a video cache RAM, 8*8 block generation, DCT, ZIGZAG scanning, quantification, RLE run length coding, Huffman coding and the like. The high-resolution video image compression is realized by only using the single FPGA, so that the data volume is greatly reduced.
Owner:CHENGDU FOURIER ELECTRONICS TECH +1

Road building method based on modified roller compacted concrete pavement on enzyme soil solidified base layer

The invention relates to the technical field of road engineering construction, and particularly to a road building method which solves the problems that an existing road engineering construction road structure is relatively single, easy to damage, difficult in repairing, and high in building cost. The building method comprises the steps of mixing at least biological enzyme, broken stones, soil, an additive and water according to a certain ratio and rolling to form a biological enzyme soil solidified base layer and a subbase layer (enzyme soil solidified base layer for short), and then paving a cement mixing material of the biological enzyme, rubber powder and fibers modified for multiple times on the enzyme soil solidified base layer through a paving machine, rolling and forming to obtain a novel road pavement structure based on the enzyme soil solidified base layer and a multi-element repeated-modified roller compacted concrete pavement. By adopting the road building method of the novel road pavement structure, the difficulties such as high requirement on materials selected by building a road pavement, high cost, complicated construction, difficulty in maintenance, serious environment pollution and the like are solved, and the use performance of a road is greatly improved; the novel road pavement structure has the advantages of environment friendliness without pollution, resource saving, and the like, and is remarkable in economical benefits and social benefits.
Owner:HUNAN RUIBIN TECH

Dual steel pipe-encased concrete anti-seismic column with built-in rubber mixture and construction method

The invention discloses a dual steel pipe-encased concrete anti-seismic column with a built-in rubber mixture. The dual steel pipe-encased concrete anti-seismic column comprises round-in-round, square-in-square, round-in-square, square-in-round, rectangle-in-rectangle cross section forms, is composed of an outer steel pipe, an inner steel pipe, interlayer concrete and the rubber mixture; the inner and outer steel pipes are in fixed connection through welding or a bolt; and the interlayer concretely is disposed between the two steel pipes, the rubber mixture is packed in the inner steel pipe, and the interlayer concrete is self-compacting concrete. The rubber mixture is in the inner-layer steel pipe, has extremely good energy-consumption damping effect, is capable of effectively absorbing earthquake energy, and also is capable of effectively preventing fires. The dual steel pipe-encased concrete anti-seismic column with the built-in rubber mixture is relatively light in deadweight. The anti-seismic column is a main member of a framework structure of high-rise and wide-span buildings, and has the characteristics of high bearing capacity, light weight, good plasticity and toughness, good impact resistance and fatigue resistance, excellent earthquake-proof performance, good endurance and the like.
Owner:SHENYANG JIANZHU UNIVERSITY

Assembled bathroom and construction method for same

The invention relates to an assembled bathroom and a construction method for the same. The bathroom comprises a floor, four wall bodies, a ceiling and bathroom equipment. According to the invention, the floor and the wall bodies have triple functions including entity existence, decoration and waterproof performance; floor drains, horizontal-row pipelines and vertical-pipe socket-and-spigot joints are disposed in the floor; and water supply and drainage pipelines, electric appliance circuits, installation parts of sanitary ware and the like are disposed in the wall bodies. The assembled bathroom provided by the invention is characterized in that the floor and the wall bodies are different from a floor and wall bodies of a traditional box-type bathroom, integrate functions of structure, decoration, waterproof performance, pipelines and the like, and are capable of load bearing, sound insulation and division; each whole-face wall body is prefabricated and integrated at a factory; only the four wall bodies need to be assembled on site; and requirements of construction structure systems such as modern PC structures and steel structures can be satisfied. Meanwhile, a brand-new drainage system is adopted in the floor, so that floor descending is not needed during same-layer drainage, and the drainage system has advantages which cannot be prevailed by a same-layer floor-descending drainage mode.
Owner:焦明先

Ground permeating rainwater recovery system utilizing building waste materials and construction method of ground permeating rainwater recovery system

The invention discloses a ground permeating rainwater recovery system utilizing building waste materials. The ground permeating rainwater recovery system comprises a soil foundation, a permeating layer, a base layer, a planting soil layer and a face layer which are sequentially arranged from bottom to top. The permeating layer is a building waste material rough particle layer which is evenly distributed with the particle size of 30-50 mm, a permeating pipe is laid in the building waste material rough particle layer and permeating pipe is connected with a water collecting well through a connecting pipe. The base layer is a building waste material fine particle layer which is evenly distributed with the particle size of 1-10 mm. The face layer is lawn blocks and waste engineering stones, and the lawn blocks and the waste engineering stones are arranged alternately. The invention further discloses a construction method of the ground permeating rainwater recovery system utilizing building waste materials, and the method includes the steps of site flatting, soil foundation processing, building waste material crashing, permeating layer laying and the like. According to the ground permeating rainwater recovery system utilizing building waste materials and the construction method of the ground permeating rainwater recovery system, building waste is reasonably used, building resources are saved, the environment is protected, rainwater is recycled, and water resources are saved.
Owner:JIANGSU SHANSHUI ENVIRONMENT CONSTR GRP

Green upgrading structure of concrete pavement and a reconstruction method thereof

The invention provides a green upgrading structure of concrete pavement and a reconstruction method thereof. The A reconstruction method comprises the following steps: concrete pavement treatment, concrete pavement joint treatment, reinforcing bar mesh layer laying, filling and excavating partition box laying, recycling concrete layer construction, upper reinforcement layer and partition mortar layer construction, water-proof base layer and asphalt mixture surface layer construction, filling and excavating partition box taking out and draining and storing water partition belt laying. The method provided by the invention realizes the full utilization of the milling material of the concrete pavement and saves the building resources. At the same time, in order to prevent the crack from reflecting, the upper reinforced layer and the spacer mortar layer can effectively prevent the crack from blocking the reflection channel and enhance the integrity of the pavement structure. It reduces thedifficulty of setting up the water drainage and storage partition belt in the later period and improves the compaction effect of the pavement structure. The utility model meets the needs of storing and utilizing rainwater, greening construction of partition belt and assembling installation of curb stone, and effectively improves the construction efficiency on site.
Owner:JIANGXI BOHUI ENG TECH SERVICE CO LTD

Convenient prefabricated plate brick membrane installing method

The invention discloses a convenient prefabricated plate brick membrane installing method which includes the steps of coating mortar bonding layers (5) on the upper surface of a ground beam cushion layer (4), wherein the position of the mortar bonding layer (5) corresponds to the position of a concrete hollow prefabricated plate to be installed (1); arranging the concrete hollow prefabricated plates to be installed (1) on the upper surfaces of the mortar bonding layers (5) to form a prefabricated hollow concrete brick membrane, wherein the concrete hollow prefabricated plate (1) is along a vertical direction; arranging a temporary support (6) between the concrete hollow prefabricated plates (1) for reinforcement; placing soil on the outside of the concrete hollow prefabricated plate (1) and arranging a basic layer (2) on the backfill (3); when the backfill (3) and the basic layer (2) are completed, and the prefabricated plate brick fetal membrane is stabilized, removing the temporary support (6) after the prefabricated plate brick membrane becomes firm. The convenient prefabricated plate brick membrane installing method effectively solves the problems of large work amount of brickmasonry as brick membrane construction and more manpower input.
Owner:上海宝冶建筑工程有限公司 +1

Rapid construction method for tunnel located at bridge and tunnel connected segment

The invention discloses a rapid construction method for a tunnel located at a bridge and tunnel connected segment. The rapid construction method for the tunnel located at the bridge and tunnel connected segment comprises the following steps that an entrance of a construction transverse hole is selected to enter the hole; transverse hole excavation and transverse hole intersection main hole construction are carried out; left line main hole bi-directional excavation construction is carried out; vehicle travelling transverse hole construction is carried out; and right-line main hole bi-directional excavation construction is carried out. Through a mode of excavating the transverse holes to enter the main hole, then the bi-directional excavation is carried out on the main hole, hole exiting iscarried out assisted by a double-row advanced small guide pipe mode, the defects of insufficient cliff construction space in the prior art and mutual interference of a bridge and a tunnel are overcome, and the rapid construction method for the tunnel located at the bridge and tunnel connected segment has the advantages of low construction costs, short construction period, safety and reliability and high efficiency.
Owner:CHANGAN UNIV

Hydrostatic hydraulic flushing and suction sinking well construction method

The invention discloses a hydrostatic hydraulic flushing and suction sinking well construction method. Through modes of arranging a hydraulic mud flushing machine, a mud discharging pipe and other equipment and a pipeline circulation system at the bottom of a well and arranging cast-in-place piles and upper crossbeams on the periphery of a well body and the other modes, static hydraulic pressure and hydraulic flushing and suction mode can be used to smoothly sink the well body when an undrained method sinking well construction meets a local sand layer, and meanwhile, the uneven sinking of thewell body can be rectified in the process of sinking. The hydrostatic hydraulic flushing and suction sinking well construction method is extremely suitable for disaster relief and rescue or tight construction, can effectively solve the difficult problems of sinking well construction under complex geological conditions, significantly improve the construction quality, reduce the construction period,save construction resources, and reduce the construction cost.
Owner:CHINA MCC17 GRP

A preparation method of construction waste recycled artificial landscape stone

The invention provides a method for preparing an artificial landscape stone from regenerative construction wastes. The method is characterized by comprising the following steps of: 1) manufacturing a support of the landscape stone by channel steel or steel angles; 2) brushing a layer of releasing agent on a mould box and putting a processed landscape stone keel into the mould box to be fixed; 3) adding water into a stirring machine, adding construction waste based regenerative fine aggregates, construction waste based regenerative coarse aggregates, construction waste powder, silicate cements, artificial sand and crushed granite into the stirring machine to stir for 3-5 minutes, and pouring the mixture into the mould box; 4) putting the poured mould box into a curing chamber to carry out initial curing at constant temperature for 10-20 days; 5) demoulding the artificial landscape stone which is initially cured; 6) evenly stirring unsaturated resins, accelerants and hardening agents to prepare a binding agent; 7) uniformly smearing the binding agent to a semi-finished product; 8) performing quality inspection; and 9) putting a finished product into a warehouse. The method has the advantages that the construction wastes are comprehensively utilized, so that construction resources are saved, construction cost is reduced, and environment pollution is reduced.
Owner:QINGDAO GREEN SAIL RECYCLED BUILDING MATERIALS

Truck ETC protocol toll system and truck ETC protocol toll method

The present invention discloses a truck ETC protocol toll system and a truck ETC protocol toll method. The system comprises a dynamic weighing area and a trading area. The dynamic weighing area is used for completing the weighing of a vehicle and comprises at least one dynamic weighing unit. The trading area comprises a common ETC lane. Pre-reading equipment and a road side display screen 28 are arranged between the common ETC lane and the dynamic weighing area. The pre-reading equipment is used to read the weighing data obtained by the dynamic weighing area and displaying the data by the road side display screen. The trading area completes a charge operation according to the displayed weighing data. According to the system and the method, a vehicle owner can be informed of a truck weight in advance, the vehicle owner has enough time to select whether to enter the ETC lane to carry out transaction without the involvement of the staff, the human cost is saved, and legal risk is avoided.
Owner:重庆市华驰交通科技有限公司

Construction method of long and narrow deep foundation pit surrounding system

The invention provides a construction method of a long and narrow deep foundation pit surrounding system. High-rigidity steel plate piles are adopted as surrounding piles, and are combined with four steel supports including a top ring beam to guarantee safety of a foundation pit; through adoption of such construction resources as recoverable steel plate piles and steel supports, the construction resources are saved, no curing requirement is generated, and the construction period is saved; and the construction time length of the foundation pit surrounding system is an important factor for guaranteeing safety of the foundation pit.
Owner:SHANGHAI MECHANIZED CONSTR GRP

Device and method for permanently connecting and fixing arc plates

The invention provides a device and method for permanently connecting and fixing arc plates. The device comprises a pair of U-shaped prefabricated arc plate end surfaces, wherein a pair of bottom plates is mounted at the bottom of the end surface of each prefabricated arc plate; the planes of the bottom plates are perpendicular to the plane of the end surface of the corresponding prefabricated arc plate, and half of each bottom plate is inserted and fixed in the end surface of the corresponding prefabricated arc plate; a small connecting plate is mounted at the upper part of the left end surface of the end surface of each prefabricated arc plate, and a large connecting plate which corresponds to the small connecting plate is mounted at the upper part of the right end surface of the prefabricated arc plate; each small connecting plate and the corresponding large connecting plate are connected through transverse beams, so that the corresponding left end surface and the corresponding right end surface are fixed; inclined beams are connected between each large connecting plate and the bottom plate of the corresponding end surface for fixing. According to the method, the device is adopted for connection and fixing. Through the adoption of the device and method, disclosed by the invention, the mounting quality of prefabricated arc plates can be improved, the mounting speed of prefabricated arc plates can be raised, and the input of per machine per team is reduced; besides, the fixing method of joints of the arc plates is simplified, so that the fixing method is convenient for on-site operation, and the high safety is guaranteed.
Owner:CHINA FIRST METALLURGICAL GROUP

Oil depot assembly type fire dike construction method

The invention discloses an oil depot assembly type fire dike construction method. The construction method mainly comprises the steps of ground treatment of a prefabricated site area, prefabrication ofan assembly type fire dike PC component, excavation of a foundation trench, construction of a cushion layer, transportation of prefabricated components, hoisting in place of fire dike PC components,wet connection of PC components, treatment of expansion joints, interaction of dividing dikes, fire prevention coating construction for a fire dike, acceptance inspection and the like. The preparationmethod of a PC component comprises the following steps: customizing a template required by the PC component, processing reinforcing steel bars, splicing a foundation floor mold and a blocking plate mold, conducting penetrating of horizontal ribs, binding longitudinal reinforcing steel bars, conducting reserving, mounting pre-embedded parts, mounting positioning ribs and supports, sealing the moldand conducting reinforcing, pouring concrete, dismounting side molds and blocking plates, conducting maintaining and the like. According to the assembly type fire dike construction method, standardization of a product is achieved, continuity of a construction process is achieved, the structure quality is improved, the construction period is shortened, the influence of weather and manpower on theconstruction quality is reduced, and site construction pollution is reduced.
Owner:中国石油工程建设有限公司华北分公司

Environment-friendly building material containing wastes and preparation method thereof

The invention provides an environment-friendly building material containing wastes and a preparation method thereof and relates to the technical field of building materials. The environment-friendly building material containing the wastes is prepared from the following raw materials: sludge wastes, feldspar, bentonite, zeolite, loess, mica, agalmatolite, waste rock wool board, waste polyethylene foam plastic, activated carbon, aerogel, glass fibers, a flame retardant and a binding agent; the preparation method comprises the following steps: (1) weighing the raw materials; (2) crushing; (3) stirring; (4) feeding into a mold and molding; (5) firing to obtain a finished product. The environment-friendly building material containing the wastes, which is prepared by the invention, has the advantages of energy saving and environment protection, and good flame-retarding performance.
Owner:桐城市景瑞建筑装饰工程有限公司

Green gravity type soil retaining structure

The invention discloses a green gravity type soil retaining structure, and relates to the technical field of soil retaining structures. The soil retaining structure comprises a soil retaining structure and a water storage control device. The soil retaining structure comprises a soil retaining body, a water storage chamber, a drainage hole and a water filtering pipe; the water storage chamber is arranged in the soil retaining body, the drainage opening is formed in the top of the water storage chamber, and the water filtering pipe is arranged on the transverse side face of the water storage chamber; and the water storage control device comprises a water stop valve, a drainage pipe and a communication hole, the drainage pipe is connected to the bottom of the water storage chamber, the water stop valve is arranged in the drainage pipe, and the drainage pipe is connected with the communication hole. Through the water storage chamber, the water filtering pipe and the water storage control device, slope water and soil can be effectively protected, the natural ecological environment is protected, water stored in a water storage chamber can be reasonably distributed and utilized, stored water is used for complementing dead weight, the soil retaining capacity is improved, building resources are saved, and through the communicated drainage hole, focus utilization and directional draining of remaining water can be achieved; and the problems that the load distance of water resources for green belts in the middle of road is long, and irrigation is difficult are solved.
Owner:ANHUI UNIV OF SCI & TECH

Cell business resource distribution method and device

The invention discloses a cell business resource distribution method and device. The method mainly includes judging whether business sharing between a source cell and at least one adjacent cell is balanced according to the business quantity of the source cell and the business quantity of the adjacent cells in the set range by determining the adjacent cells of the source cell in the set range; on no judgment, calculating the idle business traffic channel number of the adjacent cells in the set range, calculating the business quantity to be shared of the source cell, determining the adjacent cells capable of sharing the business quantity of the source cell, and distributing the business quantity to be shared of the source cell to the determined adjacent cells according to a business distribution strategy. The problem that business sharing between the source cell and the adjacent cells is unbalanced due to the fact that a source cell expansion mode is adopted, business balancing between the cells in the same area is achieved, network building resources are saved, the network structure complexity is relieved, and the network service quality is improved.
Owner:XINYANG BRANCH HENAN CO LTD OF CHINA MOBILE COMM CORP

Portable large pipeline welding butting device and method of use

The invention relates to the field of pipeline installation, in particular to a portable large pipeline welding butting device. The device is characterized by comprising an annular retainer, pressingplates and locking bolts, wherein the annular retainer sleeves a butting seam of the two pipelines, a plurality of pressing plates are arranged and are uniformly arranged on the inner side of the annular retainer, the inner side surfaces of the pressing plates abut against outer walls of the two pipelines respectively, the outer sides of the pressing plates are provided with the locking bolts; thelocking bolts pass through the annular retainer and are connected with the annular retainer through threaded through holes; the pressing plates abut against the outer walls of the pipelines by rotating the locking bolts. The butting device is applied to the welding butting construction of a large pipeline, the butting device is fixed on the outer side of the pipeline, and unfitness of butt jointof the pipelined is effectively reduced by adjusting the pressing plates which are arranged around the butt joint of the pipelines. The device is simple in operation and convenient to manufacture, construction resources and pipeline adjustment time are effectively reduced.
Owner:CHINA MCC20 GRP CORP

Construction method of large-span profile steel reinforced concrete beam

The invention discloses a construction method of a large-span profile steel reinforced concrete beam, which comprises the following steps that 1) a plurality of groups of scale guiding rule jacking pipe devices are installed on a bottom form of a to-be-installed profile steel reinforced concrete profile steel beam, and two scale guiding rule jacking pipe devices are oppositely arranged to form a group of supporting units; 2) the profile steel beam is hoisted to a position between the two scale guiding rule jacking pipe devices by adopting a crane, and an upper flange plate of the profile steelbeam is clamped by the scale guiding rule jacking pipe devices; 3) the scale guiding rule jacking pipe devices are jacked by adopting a jack, and the profile steel beam is driven to move to a specified position; 4) binding and welding are conducted on a bottom rib and a surface rib of the profile steel beam; 5) stirrups and stirrup lower cushion blocks are placed; and 6), after the crane is unloaded, a formwork is supported, and concrete is poured. For installation of a large-span profile steel reinforced concrete beam, the very good positioning, supporting and fixing effects are achieved, the structure is simple, a jacking pipe can achieve the very good supporting effect, the jacking position can be fixed according to needs, the construction efficiency is improved, and construction resources are saved.
Owner:CHINA METALLURGICAL CONSTR ENG GRP

Spiral fluid turbine pump

The invention relates to a fluid machine, in particular to a spiral fluid turbine pump. A mechanical spiral rotor moves in a spiral stator, and applies work to a fluid working medium in a cavity so that the fluid working medium is continuously discharged or the spiral rotor is continuously acted in a reverse motion mode of the fluid working medium to output power. The spiral fluid turbine pump of the technology can be used as fluid pump equipment or fluid motor equipment, and can be designed into large, small and micro machine series; and the equipment of the technology has simple structure, good reliability, continuity and pulsation of the working medium, low noise and high efficiency, and can be used for functional conversion of gas and liquid, energy conservation, emission reduction, production and the like.
Owner:王跃

Cutting machine for building boards

The invention discloses a cutting machine for building boards. The cutting machine comprises a box body, a stabilizing assembly is installed in the middle of the bottom end of the box body, a stackingassembly is installed at the bottom of one end of the box body, and a storing groove is formed in the middle of one end of the box body. According to the cutting machine for the building boards, thestructure is scientific and reasonable, and use is safe and convenient; the length of manual telescopic rods is adjusted, stabilizing bases are fixed to the corresponding sides of moving wheels through rotation of first rotation shafts, the moving wheels are fixed through the stabilizing bases, therefore, the condition that in the cutting process, accidents occur due to the fact that the cutting machine displaces can be effectively prevented, and the cutting machine can be more stable in the using process; the manual telescopic rods are clamped into fixing plates, limiting plug pins are inserted into the fixing plates, and therefore the manual telescopic rods can be effectively fixed; and in addition, the cutting machine is moved through the moving wheels, and therefore the cutting machinenot only can be conveniently moved in the using process, but also can be more stable in the using process.
Owner:郭秀云

Underground water storage treatment device for sponge city construction

The invention relates to the technical field of sponge city construction equipment, and discloses an underground water storage treatment device for sponge city construction. The underground water storage treatment device comprises a treatment accommodating apparatus. A fixing bottom plate is fixedly mounted in the middle of an outer side of the treatment accommodating apparatus, two hydraulic rodsare fixedly mounted on the top of the fixing bottom plate, the bottoms of shells of the two hydraulic rods are fixedly connected with the left side and the right side of the top of the fixing bottomplate, damping push rods are fixedly connected with pushing shafts of the two hydraulic rods, and the end, which is far away from the corresponding hydraulic rod, of each damping push rod is fixedly connected with the side, which is far away from the middle of the treatment accommodating apparatus, of a movable plate. The underground water storage treatment device for sponge city construction hasthe advantages that the hydraulic rods and the damping push rods are combined with one another, pushing work can be carried out on the movable plates, and accordingly precipitates on the tops of a precipitation plate can be efficiently cleaned; impurities, the precipitates and the like can be fed into an inner cavity of an underground water storage apparatus under the effect of an impurity leading-out through pipe, and accordingly the timeliness and the high efficiency of impurity cleaning work for the precipitates and the like can be effectively improved.
Owner:HUNAN UNIV OF ARTS & SCI

Dry cleaning method and dry cleaning equipment for slurry on inner wall of premixed concrete tank truck

The invention relates to a dry cleaning method and dry cleaning equipment for slurry on the inner wall of a premixed concrete tank truck. The method comprises the following steps that (1) a debugging system is installed; 2) collecting local daily temperature within five years; 3) setting identification and weighing equipment; 4) determining the local day temperature; 5) determining a weight difference value and a time difference value of vehicles entering and exiting the station; 6) determining the weight of excess materials; 7) driving the vehicle to a heavy load induction acquisition area; (8) the water adding amount and the mass of the dry cleaning medium are determined; (9) controlling dry cleaning; the dry cleaning equipment comprises a material lifting system mounted on a lifting bracket, an unloading system connected with the material lifting system and used for feeding a dry cleaning medium into a mixing drum of the concrete tank truck, a waterway system used for controlling spraying dust removal, and a control system. According to the dry cleaning and recycling device, the problem of secondary pollution caused by cleaning of the slurry on the inner wall of the premixed concrete tank truck is practically and effectively solved, precious building resources can be economically and reasonably saved, and the dry cleaning and recycling device is an indispensable matched dry cleaning and recycling device for a concrete mixing plant.
Owner:NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER

Advertisement playing system and advertisement playing method

The invention discloses an advertisement playing system and an advertisement playing method. The advertisement playing system comprises at least one base station and at least one mobile terminal. Each base station comprises an advertisement supplying module and a wireless transmitting module, wherein the advertisement supplying module is used for storing and supplying advertisement information, and the wireless transmitting module is used for sending out the advertisement information supplied by the advertisement supplying module. Each mobile terminal comprises a wireless receiving module, a storage module, a control module and a video playing module, wherein the wireless receiving module is used for receiving the advertisement information transmitted by the wireless transmitting module, the storage module is used for storing the advertisement information received by the wireless receiving module, and the control module is used for controlling the video playing module to play the advertisement information of the storage module. The advertisement playing system does occupy space, the advertisement playing method is easy to realize, and different advertisement information can be played when a vehicle passes different positions, and therefore not only is spread of advertisements guaranteed, but also advertising boards on a high way is reduced, and at the same time, construction resources are also saved.
Owner:SHANGHAI CHENXING ELECTRONICS SCI & TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products