The invention discloses an oil depot
assembly type fire dike construction method. The construction method mainly comprises the steps of ground treatment of a prefabricated site area,
prefabrication ofan
assembly type fire dike PC component, excavation of a foundation trench, construction of a
cushion layer, transportation of prefabricated components, hoisting in place of fire dike PC components,wet connection of PC components, treatment of expansion joints, interaction of dividing dikes,
fire prevention coating construction for a fire dike, acceptance inspection and the like. The preparationmethod of a PC component comprises the following steps: customizing a template required by the PC component,
processing reinforcing steel bars, splicing a foundation floor mold and a blocking plate mold, conducting penetrating of
horizontal ribs, binding longitudinal reinforcing steel bars, conducting reserving, mounting pre-embedded parts, mounting positioning ribs and supports, sealing the moldand conducting reinforcing, pouring concrete, dismounting side molds and blocking plates, conducting maintaining and the like. According to the
assembly type fire dike construction method,
standardization of a product is achieved, continuity of a construction process is achieved, the structure quality is improved, the construction period is shortened, the influence of weather and manpower on theconstruction quality is reduced, and site construction
pollution is reduced.