The invention discloses an installation method for a
blast furnace bottom water cooling beam and a
blast furnace bottom water cooling pipe. According to the installation method, field construction processes are reduced, and the installation quality is improved. The installation method includes the steps that firstly, a furnace
bottom water cooling beam and
water cooling pipe assembling body is totally
cut into five splicing blocks according to a design drawing; secondly, the five splicing blocks are produced in a factory; thirdly, the five splicing blocks are generally assembled on a factor splicing platform, and an installation coordinate
system and a
blast furnace center are marked on the furnace bottom
water cooling beam and the furnace bottom
water cooling pipe which are assembled; fourthly, a part is transported to the field; fifthly, the installation coordinate
system and the blast furnace center of the furnace bottom water cooling beam and the furnace bottom water
cooling pipe are discharged out on a blast furnace foundation bearing table through a
total station; sixthly, the first splicing block, the second splicing blocks and the third splicing blocks are sequentially installed and spliced; and seventhly, after various items of installation sizes are checked to be qualified,
welding is conducted. By the adoption of the installation method for the blast furnace bottom water cooling beam and the blast furnace bottom water
cooling pipe, field construction process links are few, and safety and reliability are achieved; the installation precision is high, and quality is good; and the installation time is short, and the construction period is shortened.