Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

40results about How to "Express traffic" patented technology

Method for preparing geopolymer grouting material and method for applying geopolymer grouting material to static pressure grouting

The invention provides a method for preparing a geopolymer grouting material and a method for applying the geopolymer grouting material to static pressure grouting. Raw materials for preparing the geopolymer grouting material include steel slag, mineral slag, sodium silicate, silica fume, calcium bentonite, softened water and a composite alkali activator. The method for preparing the geopolymer grouting material comprises the steps that 1, a component A is prepared; 2, a component B is prepared; 3, a component C is prepared; and 4, the geopolymer grouting material is prepared. The method for static pressure grouting comprises the steps of 1, survey; 2, assessment; 3, pit sounding; 4, hollowing general survey; 5, deflection value check; 6, comprehensive evaluation; 7, measurement and hole arrangement; 8, drilling; 9, grouting; 10, check; 11, grouting hole sealing; and 12, recheck to complete static pressure grouting. The methods have the advantages of environmental friendliness, low viscosity, high elasticity modulus, high cohesiveness, low cost, high efficiency and high durability.
Owner:中能化江苏矿山生态研究院有限公司

Urban road inspection well

PendingCN106906847ACustomer service construction time is limitedExpress traffic processingArtificial islandsUnderwater structuresAsphaltSurface layer
The invention discloses an urban road inspection well. The urban road inspection well comprises a shaft, a concrete precast block, a well periphery reinforcement cage, a well base, a well lid, a template, an early strength concrete layer and an asphalt surface layer. A well periphery support structure of the inspection well mainly includes two parts of the well periphery reinforcement cage and the earth strength concrete layer; the two parts are organically combined to effectively treat such more general and frequent diseases as well periphery sinking and well periphery road surface destruction of the inspection well frequently generated in urban road pavements; and the inspection well not only solves the frequent generation problems of well periphery sinking and local destruction, but also can overcome the limited difficulty of the construction time of urban roads. The inspection well structure is also suitable for repairing and transforming the destructed inspection well, and can achieve the effects of quick repair of the inspection well with urban road well periphery sinking and local destruction, quick traffic opening and thorough treatment of well periphery diseases.
Owner:北京特希达交通勘察设计院有限公司

Construction method for preventing surrounding subsidence and local damage of urban road manhole

The invention discloses a construction method for preventing surrounding subsidence and local damage of an urban road manhole. The construction method for preventing the surrounding subsidence and the local damage of the urban road manhole comprises the steps of determining a manhole surrounding treatment range; digging and removing old pavement structures within the range; mounting a manhole surrounding reinforcement cage; mounting a cast iron manhole seat; adjusting the elevation of the manhole seat; supporting a template; pouring concrete; protecting a finished product; and laying an asphalt concrete surface course. According to the construction method for preventing the surrounding subsidence and the local damage of the urban road manhole, a problem that the surrounding subsidence and local damage frequently occur because the traditional material cannot be compacted in the traditional manhole surrounding treatment method is solved; as early strength concrete and the manhole surrounding reinforcement cage are organically combined, the difficulty that urban road construction time is limited can be overcome; the urban road manhole with the surrounding subsidence and the local damage can be rapidly repaired and can be rapidly open to traffic; and a manhole surrounding disease treatment effect is complete.
Owner:北京特希达交通勘察设计院有限公司

Expressway asphalt pavement repairing equipment

A stirring cavity is formed in a machine shell, a stirring motor cavity is formed in the left end wall of the stirring cavity, a powder discharging cavity is formed in the upper end wall of the stirring motor cavity, a hot air cavity is formed in the right end wall of the stirring cavity, and a pair of fan motor cavities which are symmetrical up and down are formed in the right end wall of the hot air cavity; a stirring mechanism, a grinding mechanism and a discharging mechanism are arranged in the machine shell, the stirring mechanism is provided with a stirring screw and can stir asphalt during asphalt heating, and the grinding mechanism is provided with a dust collection cavity and a grinding block and can grind an uneven road surface during equipment operation; asphalt powder and gravel powder generated in the grinding process can be recycled again, raised dust generated in the repairing process is reduced, the discharging mechanism is provided with a movable rod rolling wheel, in the equipment operation process, uneven places can be found out, the quality of asphalt needed for repairing can be detected, and preparation is made for subsequent asphalt discharging.
Owner:赵影丽

Rapid open-to-traffic concrete for repairing pits on cement concrete pavement

The invention discloses rapid open-to-traffic concrete for repairing pits on a cement concrete pavement. The concrete is prepared from the following raw materials at a specific ratio: composite cement, wear-resisting medium sand, crushed stones, water, a polycarboxylic acid water reducer and a compound additive. An inorganic cement-based gel material is used for modifying so that the problems that asphalt concrete is high in repairing material cost and poor in repairing effect, the hardening speed of common cement concrete is slow, the close-to-traffic time is long and the long-term strength is decreased are solved. C2S is added into P.S42.5 cement to improve the long-term strength of the concrete; the hydration induction period and the condensation time of the cement are shortened through a compound additive so that high early strength and controllable condensation and hardening time are realized. The rapid open-to-traffic concrete can be used for repairing the pits on the cement concrete pavement, can meet rapid open-to-traffic requirements of open-to-traffic time of 2h, 5h, 12h and the like and has important value on low pavement maintenance cost and rapid open-to-traffic recovery speed.
Owner:GUANGXI TRANSPORTATION SCI & TECH GRP CO LTD

Novel pre-buried unit type ultra-long life multi-directional deflection bridge telescopic device

The invention relates to a novel pre-buried unit type ultra-long life multi-directional deflection bridge telescopic device. The novel pre-buried unit type ultra-long life multi-directional deflectionbridge telescopic device comprises a main toothed plate and an auxiliary toothed plate; steel plates are preinstalled between the main toothed plate and a first bridge beam body as well as between the auxiliary toothed plate and a second bridge beam body; the steel plates are fixed to the first bridge beam body and the second bridge beam body through anchor rings; box bodies are fixed to the lower portions of toothed plate parts of the main toothed plate and the auxiliary toothed plate correspondingly, and the box bodies are fixed to the steel plates; first stiffening plates are fixed to thelower portions of comb tooth parts of the main toothed plate and the auxiliary toothed plate, the side surfaces of the first stiffening plates are fixed to the box bodies, the interior of each box body is of a cavity structure, and concrete is poured in the cavity structures; and the toothed plate parts of the main toothed plate and the auxiliary toothed plate are provided with a plurality of welding holes at equal intervals in the transverse direction of the toothed plate parts, and the welding holes communicate with the interiors of the box bodies. The novel pre-buried unit type ultra-long life multi-directional deflection bridge telescopic device is high in structural strength, and capable of achieving quick installing and saving construction time.
Owner:天津桥通科技发展有限公司 +1

Embedded reinforcing structure and method of bridge expansion device

InactiveCN110886208AFully retouched ultra-wide errorFully corrected elevation errorsBridge structural detailsExpansion jointAsphalt
The invention discloses an embedded reinforcing structure and method of a bridge expansion device. The embedded reinforcing structure is characterized in that a left pre-embedded unit, a right pre-embedded unit and an original pre-embedded structure jointly form a high-strength pre-embedded overall new structure; the steel content of the expansion joint notch is increased; the anchor strength is enhanced; the paving compactness defect, the paving flatness defect and the paving gradient defect of the asphalt at the expansion joint notch can be comprehensively overcome; other hidden constructiondefects of the expansion joint notch expansion device can be comprehensively overcome; the left pre-embedded unit and the right pre-embedded unit are machined in a factory or machined through molds on site; high-strength screws or other high-strength fasteners are adopted to be accurately and fixedly connected with anchoring points of different structural forms of the bridge expansion device; andthe anchoring strength and installation precision of the bridge expansion device and the high-precision and high-strength new notch are comprehensively improved, and rapid assembly is achieved, and rapid traffic of roads and bridges is facilitated, and the service life of the bridge expansion device is prolonged, and the driving comfort degree of the bridge expansion device is improved.
Owner:武汉丰瑞桥梁科技有限公司

High-adhesive two-component epoxy-polyurethane blend material and its preparation method

ActiveCN106046761BTo achieve the purpose of strengthening the roadbedPermeation barrierCross-linkDisease
The invention provides a high-adhesion and double-component epoxy-polyurethane commixed material and a preparation method thereof. The commixed material is prepared from a component A and a component B by mixing, wherein the component A comprises the following components in percentage by mass: 78%-90% of polyether polyol, 5%-18% of a cross-linking agent, 1%-4% of a foaming agent, 1%-4% of a foam stabilizer, 1%-1.5% of a cross-linking type catalyst and 1.5%-3% of a foaming and epoxy cured bi-catalyst; the component B is prepared from polyphenyl polymethylene polyisocyanate and epoxy resin and the mass ratio of the polyphenyl polymethylene polyisocyanate to the epoxy resin ranges from (15 to 1) to (2 to 1); and the use amount of the foaming and epoxy cured bi-catalyst accounts for 2%-40% of the weight of the epoxy resin. The commixed material has an interpenetrating network structure formed by commixing bisphenol A epoxy resin (EP) and polyurethane (PU) and is a novel chemical grouting material which has the advantages of a polyurethane grouting material and an epoxy resin grouting material; and the commixed material can be formed and can also be rapidly cured and adhered on a wet surface at a room temperature, and diseases including void, looseness, cracks, interlayer water, erosion and the like of a base course and the like are hopefully solved.
Owner:SHANGHAI HUAFENG MATERIAL TECH RES INST LLP

Intelligent traffic high-definition digital display device and monitoring system thereof

The invention belongs to the field of intelligent traffic, and particularly relates to an intelligent traffic high-definition digital display device and a monitoring system. The monitoring system comprises a monitoring module used for recording an image of a designated place and transmitting image information outwards through the Internet, and a vehicle locking module used for processing the image information transmitted by the monitoring module detecting and recording the vehicle in the image, and positioning the position of a license plate and the position of a tail lamp in a video. A model of the vehicle is constructed after combination, so that the type of the vehicle is rapidly obtained, the function of rapidly obtaining vehicle information is further achieved. The system further comprises a simulation coil module used for adding a simulation coil in image information transmitted by the monitoring module and replacing a traditional buried induction coil. The simulation coil is used for replacing an induction coil laid on the road surface, so that the cost is greatly reduced, the road surface does not need to be excavated to lay the traditional induction coil, the time of the construction process of the intersection is shortened, and the road can be more rapidly opened.
Owner:JIANGSU CHINA SCI INTELLIGENT ENG

Paving structure of electric vehicle track in level crossing transition area and construction method of the paving structure

The invention relates to the technical field of road paving, in particular to a paving structure of an electric vehicle track in a level crossing transition area and a construction method of the paving structure. High-elastic self-adaptive asphalt mixture blocks and ultra-high performance concrete blocks are filled between a pavement layer and steel rails; wherein the high-elastic self-adaptive asphalt mixture block and the ultra-high performance concrete block are both arranged above the roadbed layer, and the high-elastic self-adaptive asphalt mixture block is limited between the pavement layer and the ultra-high performance concrete block; and the high-elastic self-adaptive asphalt mixture block and the ultra-high performance concrete block are combined to form a buffer energy absorption transition section of the pavement layer. The structure has the advantages that the problems of cracking, delaminating, slippage, rutting, poor durability and the like can be effectively solved; the structure has high flexibility and self-adaptability, is high in the asphalt consumption; is great in the durability, realizes smooth connection, is high in waterproof performance, and can be repaired together with jointed pavements, is free of maintenance and long in service life, and can rapidly be delivered for traffic, and is simple in maintenance.
Owner:SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD

Tramcar track paving structure in transition area of level crossing and construction method of tramcar track paving structure

ActiveCN113957754AGood flexibilityEnergy absorption and noise reductionIn situ pavingsTemporary pavingsElastomerEnergy absorption
The invention relates to the technical field of road pavement, in particular to an electric vehicle track pavement structure in a level crossing transition area and a construction method of the electric vehicle track pavement structure. A polyurethane high elastomer and an ultra-high performance concrete block are filled between a pavement layer and a steel rail, and the ultra-high performance concrete block is arranged above a roadbed layer; the polyurethane high elastomer is arranged above the ultra-high performance concrete block, and the polyurethane high elastomer and the ultra-high performance concrete block are combined to form a buffer energy absorption transition section of the pavement layer. The invention has the advantages that the problems of cracking, delaminating, slippage, rutting, poor durability and the like can be effectively solved; the structure has high flexibility and self-adaptability, is high in the durability, realizes smooth connection and high-efficiency waterproof performance, can be repaired together with a connected pavement, is free of maintenance and long in the service life, and can rapidly be delivered for traffic, and is simple in maintenance.
Owner:SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD

Asphalt pavement rapid maintenance and drying solidification equipment

The invention discloses asphalt pavement rapid maintenance and drying solidification equipment. The equipment comprises a transport carrier, wherein an asphalt heating and stirring tank is arranged onthe transport carrier, the asphalt heating and stirring tank is provided with an electric heating coil pipe, a spiral conveying rod is arranged in the asphalt heating and stirring tank, an electric heating inner core is arranged in the spiral conveying rod, the lower end of the spiral conveying rod is erected at a discharging port of the lower end of the asphalt heating and stirring tank througha bearing, the electric heating inner core is electrically connected with a conductive wire through a rotating connecting part, formed by an electric conductor, at the upper end of the spiral conveying rod, and the conductive wire is connected with a power supply; and a pressing roller is arranged on the position, at rear side of the asphalt heating and stirring tank, of the transport carrier, thetwo ends of a pressing roller rotating shaft are connected with a cooling system, and cooling liquid is circulated in the rotating shaft and the cooling system. According to the equipment, the spiralconveying rod can quickly convey asphalt downwards to damaged pavement needing to be supplemented with the asphalt, and the asphalt on the pavement can be rapidly flattened by the pressing roller andquickly cooled through the cooling circulation system arranged in the pressing roller, so that the asphalt is hardened.
Owner:百盛联合集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products