Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

40results about How to "Express traffic" patented technology

Method for preparing geopolymer grouting material and method for applying geopolymer grouting material to static pressure grouting

The invention provides a method for preparing a geopolymer grouting material and a method for applying the geopolymer grouting material to static pressure grouting. Raw materials for preparing the geopolymer grouting material include steel slag, mineral slag, sodium silicate, silica fume, calcium bentonite, softened water and a composite alkali activator. The method for preparing the geopolymer grouting material comprises the steps that 1, a component A is prepared; 2, a component B is prepared; 3, a component C is prepared; and 4, the geopolymer grouting material is prepared. The method for static pressure grouting comprises the steps of 1, survey; 2, assessment; 3, pit sounding; 4, hollowing general survey; 5, deflection value check; 6, comprehensive evaluation; 7, measurement and hole arrangement; 8, drilling; 9, grouting; 10, check; 11, grouting hole sealing; and 12, recheck to complete static pressure grouting. The methods have the advantages of environmental friendliness, low viscosity, high elasticity modulus, high cohesiveness, low cost, high efficiency and high durability.
Owner:中能化江苏矿山生态研究院有限公司

Urban road inspection well

PendingCN106906847ACustomer service construction time is limitedExpress traffic processingArtificial islandsUnderwater structuresAsphaltSurface layer
The invention discloses an urban road inspection well. The urban road inspection well comprises a shaft, a concrete precast block, a well periphery reinforcement cage, a well base, a well lid, a template, an early strength concrete layer and an asphalt surface layer. A well periphery support structure of the inspection well mainly includes two parts of the well periphery reinforcement cage and the earth strength concrete layer; the two parts are organically combined to effectively treat such more general and frequent diseases as well periphery sinking and well periphery road surface destruction of the inspection well frequently generated in urban road pavements; and the inspection well not only solves the frequent generation problems of well periphery sinking and local destruction, but also can overcome the limited difficulty of the construction time of urban roads. The inspection well structure is also suitable for repairing and transforming the destructed inspection well, and can achieve the effects of quick repair of the inspection well with urban road well periphery sinking and local destruction, quick traffic opening and thorough treatment of well periphery diseases.
Owner:北京特希达交通勘察设计院有限公司

Construction method for preventing surrounding subsidence and local damage of urban road manhole

The invention discloses a construction method for preventing surrounding subsidence and local damage of an urban road manhole. The construction method for preventing the surrounding subsidence and the local damage of the urban road manhole comprises the steps of determining a manhole surrounding treatment range; digging and removing old pavement structures within the range; mounting a manhole surrounding reinforcement cage; mounting a cast iron manhole seat; adjusting the elevation of the manhole seat; supporting a template; pouring concrete; protecting a finished product; and laying an asphalt concrete surface course. According to the construction method for preventing the surrounding subsidence and the local damage of the urban road manhole, a problem that the surrounding subsidence and local damage frequently occur because the traditional material cannot be compacted in the traditional manhole surrounding treatment method is solved; as early strength concrete and the manhole surrounding reinforcement cage are organically combined, the difficulty that urban road construction time is limited can be overcome; the urban road manhole with the surrounding subsidence and the local damage can be rapidly repaired and can be rapidly open to traffic; and a manhole surrounding disease treatment effect is complete.
Owner:北京特希达交通勘察设计院有限公司

Asphalt road surface functional repairing agent and its production

A repairing agent for asphalt pavement and its production are disclosed. The repairing agent consists of hard asphalt powder 5-35wt%, heavy mineral oil 16-35wt% and anthracene oil 30-79wt%. The process is carried out by mixing the raw materials at 65-200degree, and reacting for 10-120mins under mechanical agitating and shearing. It's simple and fast, has better permeability, flexibility and elasticity, less hardness, brittleness and viscosity.
Owner:CHINA PETROLEUM & CHEM CORP +1

Railway ice and snow removing car and method

PendingCN110130265AAdvantages of deicing and snow removal vehiclesMerit methodRailway cleaningEngineeringIce accretion
The invention discloses a railway ice and snow removing method. The railway ice and snow removing method comprises the steps: a railcar provided with wheels matched with a rail and used for providingdriving force is placed on a railway; a frame body is mounted at the front end of the railcar, and thus the frame body can travel along the rail under the effect of the driving force of the railcar; when the frame body travels along the rail, accumulated snow and accumulated ice on the railway are shoveled away through a snow shoveling device mounted on the frame body; the accumulated snow and theaccumulated ice which are shoveled away by the snow shoveling device are collected through a flow guiding pipe mounted on the frame body; and through a snow spraying device mounted on the frame body,the accumulated snow and the accumulated ice which enter the flow guiding pipe are conveyed out from the air outlet end of the flow guiding pipe. According to the railway ice and snow removing method, the wild snow and the solid snow on the railway can be removed, the accumulated ice on the rail can also be removed, the ice and snow removing efficiency is high, and fast traffic is facilitated. Inaddition, the invention further provides the railway ice and snow removing car.
Owner:极地雪龙环境技术有限公司

Prefabricated integral resin concrete expansion device and construction method thereof

The invention discloses a prefabricated integral resin concrete expansion device which comprises a first unit, a second unit and a waterproof adhesive strip. The first unit and the second unit have the same structure; the first unit comprises expansion joint profile steel and a resin concrete base, two layers of anchoring ribs with preset included angles are welded to the expansion joint profile steel, and the expansion joint profile steel and the two layers of anchoring ribs are prefabricated on the resin concrete base; the expansion joint profile steel on the first unit and expansion joint profile steel on the second unit are connected through the waterproof adhesive strip. The prefabricated integral resin concrete expansion device is exquisite in structure, small in buried depth and small in structural size, installation notches are shallow, it is not needed to prearrange embedded parts on a girder body or reserve installation notches in the girder body, installation can be realizedon a surface pavement layer of a bridge, the girder body structure is not damaged, the integrated design is not influenced, and the prefabricated integral resin concrete expansion device is especially suitable for thin-walled girder bodies.
Owner:CHANGAN UNIV

Bridge modular expansion joint repairing method

The invention relates to a bridge modular expansion joint repairing method. Structural investigation is performed on an expansion joint in advance before construction, and the damage condition of theexpansion joint is determined so as to select a corresponding repairing method. The damage comprises the following conditions: 1, a middle beam is damaged and an expansion box is not damaged; 2, the middle beam is not damaged, and the expansion box is damaged; 3, partial expansion joint is damaged. Aiming at the damage condition, a local repairing method is adopted, the whole expansion joint doesnot need to be replaced, only the damaged part needs to be locally repaired or locally replaced, and on the premise that the integrity and the service life of the expansion joint are guaranteed, the cost is saved, the repairing efficiency is improved, the construction time is saved, and rapid traffic restoration is achieved. During repair construction, only one traffic lane is closed for maintenance, so that the traffic pressure of the bridge floor is relieved, and potential safety hazards are reduced.
Owner:湖北鄂东长江公路大桥有限公司

Carpet type elastic function marker and preparation method thereof

ActiveCN106497388ASolve the problem that is prone to drawing errorsExpress trafficTraffic signalsPolyurea/polyurethane coatingsPlasticizerRoad surface
The invention belongs to the technical field of traffic facilities, and particularly relates to a carpet type elastic function marker and a preparation method thereof. The function marker comprises a marker coating and 1-2 parts of bottom films, wherein the maker coating comprises, by weight, 10-18 parts of film materials, 50-70 parts of fillers, 10-30 parts of pigments, 1-10 parts of photocatalytic materials, 1-5 parts of blending agents, 1-5 parts of supplements, 1-5 parts of coupling agents, 1-5 parts of leveling agents and 1-5 parts of plasticizers. Compared with the prior art, the carpet type elastic function marker and the preparation method thereof are convenient in operation and can be used for selecting a road marker position, the marker is adhered to a pavement and compacted by rolling equipment after determining the position, traffic can be opened immediately, and the shortcoming of repeated line drawing due to traditional marker spraying errors is overcome.
Owner:山西省交通科技研发有限公司

Device for treating tunnel water seepage

The invention relates to the technical field of tunnel maintenance, and provides a device for treating tunnel water seepage. The device comprises a corrugated steel plate arch ring attached to a tunnel lining and a pair of drainage assemblies which are correspondingly arranged on the two sides of the tunnel lining; each drainage assembly comprises two drainage side walls, and a drainage ditch is formed between the two drainage side walls; the drainage side wall close to the tunnel lining is attached to the tunnel lining, a drainage groove is formed in the top end of the drainage side wall close to the tunnel lining in a concave mode, and the corrugated steel plate arch ring extends into the drainage groove and guides seepage water into the drainage ditch through the drainage groove. The device aims to solve the problem of water leakage of the tunnel lining; moreover, the water leakage damage of a tunnel can be rapidly treated under the condition that the tunnel lining is not damaged, the construction and drainage efficiency is improved, and the tunnel is rapidly recovered to be open to traffic.
Owner:中铁二局第二工程有限公司 +1

Expressway asphalt pavement repairing equipment

A stirring cavity is formed in a machine shell, a stirring motor cavity is formed in the left end wall of the stirring cavity, a powder discharging cavity is formed in the upper end wall of the stirring motor cavity, a hot air cavity is formed in the right end wall of the stirring cavity, and a pair of fan motor cavities which are symmetrical up and down are formed in the right end wall of the hot air cavity; a stirring mechanism, a grinding mechanism and a discharging mechanism are arranged in the machine shell, the stirring mechanism is provided with a stirring screw and can stir asphalt during asphalt heating, and the grinding mechanism is provided with a dust collection cavity and a grinding block and can grind an uneven road surface during equipment operation; asphalt powder and gravel powder generated in the grinding process can be recycled again, raised dust generated in the repairing process is reduced, the discharging mechanism is provided with a movable rod rolling wheel, in the equipment operation process, uneven places can be found out, the quality of asphalt needed for repairing can be detected, and preparation is made for subsequent asphalt discharging.
Owner:赵影丽

Rapid open-to-traffic concrete for repairing pits on cement concrete pavement

The invention discloses rapid open-to-traffic concrete for repairing pits on a cement concrete pavement. The concrete is prepared from the following raw materials at a specific ratio: composite cement, wear-resisting medium sand, crushed stones, water, a polycarboxylic acid water reducer and a compound additive. An inorganic cement-based gel material is used for modifying so that the problems that asphalt concrete is high in repairing material cost and poor in repairing effect, the hardening speed of common cement concrete is slow, the close-to-traffic time is long and the long-term strength is decreased are solved. C2S is added into P.S42.5 cement to improve the long-term strength of the concrete; the hydration induction period and the condensation time of the cement are shortened through a compound additive so that high early strength and controllable condensation and hardening time are realized. The rapid open-to-traffic concrete can be used for repairing the pits on the cement concrete pavement, can meet rapid open-to-traffic requirements of open-to-traffic time of 2h, 5h, 12h and the like and has important value on low pavement maintenance cost and rapid open-to-traffic recovery speed.
Owner:GUANGXI TRANSPORTATION SCI & TECH GRP CO LTD

Asphalt pavement damage repair structure and repair process

The invention relates to an asphalt pavement damage repair structure, which relates to the technical field of road maintenance, and comprises a repair groove arranged along the crack extension direction and a filling structure filled in the repair groove, and the filling structure is connected to an original pavement layer; the repairing groove comprises a V-shaped groove with a crack dug in the bottom and a stepped groove extending to the two sides from the top of the V-shaped groove, and the stepped groove extends to the surface layer of the road surface. The filling structure comprises pouring sealant layers filled in the V-shaped grooves, flexible groove plates arranged in the stepped grooves and asphalt filling layers filled in the flexible groove plates, and the flexible groove plates are fixed on the original pavement layers on the two walls of the stepped grooves through rigid rivets. According to the repairing structure, damage to the surrounding pavement structure layer in the crack repairing process can be reduced, the integrity and durability of the repaired pavement are improved, and the construction period is short.
Owner:河北水熠木丰工程技术有限责任公司

Road and bridge engineering concrete crack control method

The invention discloses a road and bridge engineering concrete crack control method. The method comprises the following steps: S1, preparing materials: preparing Portland cement, a stabilizer, an additive, sandstone, an acrylamide polymer and an epoxy resin slurry material; S2, cleaning impurities: cleaning the surfaces of the concrete cracks; S3, cement mixing: respectively adding Portland cement, a stabilizer, an additive and sandstone into a stirrer, adding a proper amount of water, and starting the stirrer to perform high-speed mixing and stirring; S4, grooving and filling: forming a V-shaped groove in the middle end of the crack, adopting pressure feed equipment to start high pressure filling so as to uniformly fill mixed materials into the cracks of the V-shaped groove; S5, uniform leveling: uniformly smearing the mixed materials on the surfaces of the cracks, and flattening the surface of the cracks in the concrete by adopting a scraping-leveling device; and S6, coating and air-drying. The coating has good high-temperature stability and low-temperature embrittlement resistance, does not melt at high temperature, does not crack at low temperature, and is wear-resistant and corrosion-resistant.
Owner:王晖

Novel pre-buried unit type ultra-long life multi-directional deflection bridge telescopic device

The invention relates to a novel pre-buried unit type ultra-long life multi-directional deflection bridge telescopic device. The novel pre-buried unit type ultra-long life multi-directional deflectionbridge telescopic device comprises a main toothed plate and an auxiliary toothed plate; steel plates are preinstalled between the main toothed plate and a first bridge beam body as well as between the auxiliary toothed plate and a second bridge beam body; the steel plates are fixed to the first bridge beam body and the second bridge beam body through anchor rings; box bodies are fixed to the lower portions of toothed plate parts of the main toothed plate and the auxiliary toothed plate correspondingly, and the box bodies are fixed to the steel plates; first stiffening plates are fixed to thelower portions of comb tooth parts of the main toothed plate and the auxiliary toothed plate, the side surfaces of the first stiffening plates are fixed to the box bodies, the interior of each box body is of a cavity structure, and concrete is poured in the cavity structures; and the toothed plate parts of the main toothed plate and the auxiliary toothed plate are provided with a plurality of welding holes at equal intervals in the transverse direction of the toothed plate parts, and the welding holes communicate with the interiors of the box bodies. The novel pre-buried unit type ultra-long life multi-directional deflection bridge telescopic device is high in structural strength, and capable of achieving quick installing and saving construction time.
Owner:天津桥通科技发展有限公司 +1

Water-sealing anti-slip and anti-crack sticker of a precast asphalt pavement and a construction process thereof

The invention discloses a prefabricated asphalt pavement water-sealing anti-slip anti-crack sticking and a construction process thereof, comprising a base surface, wherein the top end of the base surface is provided with a geotextile, the top end of the geotextile is provided with a water-proof adhesive layer, the top end of the water-proof adhesive layer is provided with an anti-slip layer, the geotextile, the water-proof adhesive layer and the anti-slip layer are laid and formed by mechanical equipment, and the geotextile, the water-proof adhesive layer and the anti-slip layer have an overall thickness of 6-17mm. As that thickness of the pavement is thin, the self-weight of the original pavement is basically not increase, the compressive strength, the toughness, the tensile strength andthe adhesive strength are good, the pavement can well bear the vehicle load without damage, the waterproofing ability and the waterproofing ability are strong, and the pavement can be effectively protect from water damage.
Owner:陈萍

Novel speed bump for municipal road

The invention discloses a novel speed bump for a municipal road. The speed bump comprises a speed bump body, circular vibration isolation rubber damping supports and studs, wherein the upper end surface of the speed bump body is an arc convex surface, the vibration isolation rubber damping supports are continuously arranged in a groove in a transverse direction of the road, a screw hole is formedin the bottom of each support, each screw hole is penetrated with a stud, the circular vibration isolation rubber damping supports are fixedly connected with the bottom surface of the preset groove through the studs, the speed bump body is arranged above the vibration isolation rubber damping supports, the upper end surface of the speed bump body is the arc convex surface, and the part, positionedat the outer side of the groove, of the speed bump body is a convex part. The novel speed bump disclosed by the invention has the advantages that the novel structure is simple; the vibration feel when a vehicle passes through the speed bump is reduced; and furthermore, by replacing the speed bump body and the vibration isolation rubber damping supports, the maintenance time of the speed bump is saved, and the purpose of enabling the vehicle to pass through the speed bump quickly is achieved.
Owner:CHINA MCC 2 GRP CO LTD

Embedded reinforcing structure and method of bridge expansion device

InactiveCN110886208AFully retouched ultra-wide errorFully corrected elevation errorsBridge structural detailsExpansion jointAsphalt
The invention discloses an embedded reinforcing structure and method of a bridge expansion device. The embedded reinforcing structure is characterized in that a left pre-embedded unit, a right pre-embedded unit and an original pre-embedded structure jointly form a high-strength pre-embedded overall new structure; the steel content of the expansion joint notch is increased; the anchor strength is enhanced; the paving compactness defect, the paving flatness defect and the paving gradient defect of the asphalt at the expansion joint notch can be comprehensively overcome; other hidden constructiondefects of the expansion joint notch expansion device can be comprehensively overcome; the left pre-embedded unit and the right pre-embedded unit are machined in a factory or machined through molds on site; high-strength screws or other high-strength fasteners are adopted to be accurately and fixedly connected with anchoring points of different structural forms of the bridge expansion device; andthe anchoring strength and installation precision of the bridge expansion device and the high-precision and high-strength new notch are comprehensively improved, and rapid assembly is achieved, and rapid traffic of roads and bridges is facilitated, and the service life of the bridge expansion device is prolonged, and the driving comfort degree of the bridge expansion device is improved.
Owner:武汉丰瑞桥梁科技有限公司

High-adhesive two-component epoxy-polyurethane blend material and its preparation method

ActiveCN106046761BTo achieve the purpose of strengthening the roadbedPermeation barrierCross-linkDisease
The invention provides a high-adhesion and double-component epoxy-polyurethane commixed material and a preparation method thereof. The commixed material is prepared from a component A and a component B by mixing, wherein the component A comprises the following components in percentage by mass: 78%-90% of polyether polyol, 5%-18% of a cross-linking agent, 1%-4% of a foaming agent, 1%-4% of a foam stabilizer, 1%-1.5% of a cross-linking type catalyst and 1.5%-3% of a foaming and epoxy cured bi-catalyst; the component B is prepared from polyphenyl polymethylene polyisocyanate and epoxy resin and the mass ratio of the polyphenyl polymethylene polyisocyanate to the epoxy resin ranges from (15 to 1) to (2 to 1); and the use amount of the foaming and epoxy cured bi-catalyst accounts for 2%-40% of the weight of the epoxy resin. The commixed material has an interpenetrating network structure formed by commixing bisphenol A epoxy resin (EP) and polyurethane (PU) and is a novel chemical grouting material which has the advantages of a polyurethane grouting material and an epoxy resin grouting material; and the commixed material can be formed and can also be rapidly cured and adhered on a wet surface at a room temperature, and diseases including void, looseness, cracks, interlayer water, erosion and the like of a base course and the like are hopefully solved.
Owner:SHANGHAI HUAFENG MATERIAL TECH RES INST LLP

Intelligent traffic high-definition digital display device and monitoring system thereof

The invention belongs to the field of intelligent traffic, and particularly relates to an intelligent traffic high-definition digital display device and a monitoring system. The monitoring system comprises a monitoring module used for recording an image of a designated place and transmitting image information outwards through the Internet, and a vehicle locking module used for processing the image information transmitted by the monitoring module detecting and recording the vehicle in the image, and positioning the position of a license plate and the position of a tail lamp in a video. A model of the vehicle is constructed after combination, so that the type of the vehicle is rapidly obtained, the function of rapidly obtaining vehicle information is further achieved. The system further comprises a simulation coil module used for adding a simulation coil in image information transmitted by the monitoring module and replacing a traditional buried induction coil. The simulation coil is used for replacing an induction coil laid on the road surface, so that the cost is greatly reduced, the road surface does not need to be excavated to lay the traditional induction coil, the time of the construction process of the intersection is shortened, and the road can be more rapidly opened.
Owner:JIANGSU CHINA SCI INTELLIGENT ENG

Concrete for anchorage zone of highway bridge expansion device and preparation method thereof

InactiveCN110256022AEfficient combinationImprove basic mechanical propertiesFiberUltimate tensile strength
The invention relates to the technical field of cement concrete building materials, especially to concrete for an anchorage zone of a highway bridge expansion device and a preparation method thereof. A formula of the concrete comprises the following components, by mass: 160-170 parts of water, 410-420 parts of cement, 610-620 parts of sand, 1200-1210 parts of stone, 3-4 parts of a water reducer, 11-12 parts of an antifreezing agent, 110-120 parts of steel fibers, and 1-2 parts of PVA fibers. According to the invention, through a large number of experiments, a suitable concrete mix ratio and a reasonable manufacturing process, feeding sequence, stirring time and stirring mode of a test piece are obtained, which can effectively improve the early strength of the concrete and reduce the maintenance cycle of the concrete, thereby achieving the effect of rapid open to traffic.
Owner:WUHAN INSTITUTE OF TECHNOLOGY +1

Paving structure of electric vehicle track in level crossing transition area and construction method of the paving structure

The invention relates to the technical field of road paving, in particular to a paving structure of an electric vehicle track in a level crossing transition area and a construction method of the paving structure. High-elastic self-adaptive asphalt mixture blocks and ultra-high performance concrete blocks are filled between a pavement layer and steel rails; wherein the high-elastic self-adaptive asphalt mixture block and the ultra-high performance concrete block are both arranged above the roadbed layer, and the high-elastic self-adaptive asphalt mixture block is limited between the pavement layer and the ultra-high performance concrete block; and the high-elastic self-adaptive asphalt mixture block and the ultra-high performance concrete block are combined to form a buffer energy absorption transition section of the pavement layer. The structure has the advantages that the problems of cracking, delaminating, slippage, rutting, poor durability and the like can be effectively solved; the structure has high flexibility and self-adaptability, is high in the asphalt consumption; is great in the durability, realizes smooth connection, is high in waterproof performance, and can be repaired together with jointed pavements, is free of maintenance and long in service life, and can rapidly be delivered for traffic, and is simple in maintenance.
Owner:SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD

Urban road

The invention provides an urban road applied to the technical field of roads, which is characterized in that a forward driving lane (1) of the urban road sequentially comprises a forward bus lane (6),a forward motor vehicle fast lane (7), a forward motor vehicle slow lane (8) and a forward non-motor vehicle lane (9) from one side of a road middle isolation zone (3) to one side of a forward sidewalk (4); and the reverse driving lane (2) is sequentially provided with a reverse bus lane (10), a reverse motor vehicle fast lane (11), a reverse motor vehicle slow lane (12) and a reverse non-motor vehicle lane (13) from one side of the road middle isolation belt (3) to one side of the reverse sidewalk (5). The urban road has a simple structure. Through configuration improvement to bus lane and other lanes in the urban road, the bus lane is prevented from being occupied by motor vehicles and non-motor vehicles, the bus can be quickly opened, and the running efficiency of the bus is improved.
Owner:ANHUI POLYTECHNIC UNIV MECHANICAL & ELECTRICAL COLLEGE

Semi-rigid base crack trenchless grouting repair material and preparation method thereof

The invention relates to a semi-rigid base crack trenchless grouting repair material and a preparation method thereof. The semi-rigid base crack trenchless grouting repair material comprises the following components in parts by weight: 70-100 parts of a two-component polyurethane prepolymer, 10-15 parts of diatomite powder, 150-200 parts of cement, 60-80 parts of water and 1.0-2.0 parts of a retarder. The diatomite, the cement and the polyurethane form a network interpenetrating multi-element composite structure, so that the compactness and the bonding strength of the splicing interface part of the new pavement base layer and the old pavement base layer are favorably improved. The activity of the diatomite can be excited after calcination and ball milling, the average particle size of the calcined and ball-milled diatomite becomes smaller, the particle size distribution is wide, the specific surface area becomes larger, the faster the reaction speed with calcium hydroxide in cement paste is, the more hydration products in unit time are, and the quantity of hydrated calcium silicate in cement paste is increased. The calcium-silicon ratio and the content of calcium hydroxide are reduced, and the strength of cement is improved.
Owner:JIANGSU CHANGLU ENERGY TECH DEV CO LTD

Tramcar track paving structure in transition area of level crossing and construction method of tramcar track paving structure

ActiveCN113957754AGood flexibilityEnergy absorption and noise reductionIn situ pavingsTemporary pavingsElastomerEnergy absorption
The invention relates to the technical field of road pavement, in particular to an electric vehicle track pavement structure in a level crossing transition area and a construction method of the electric vehicle track pavement structure. A polyurethane high elastomer and an ultra-high performance concrete block are filled between a pavement layer and a steel rail, and the ultra-high performance concrete block is arranged above a roadbed layer; the polyurethane high elastomer is arranged above the ultra-high performance concrete block, and the polyurethane high elastomer and the ultra-high performance concrete block are combined to form a buffer energy absorption transition section of the pavement layer. The invention has the advantages that the problems of cracking, delaminating, slippage, rutting, poor durability and the like can be effectively solved; the structure has high flexibility and self-adaptability, is high in the durability, realizes smooth connection and high-efficiency waterproof performance, can be repaired together with a connected pavement, is free of maintenance and long in the service life, and can rapidly be delivered for traffic, and is simple in maintenance.
Owner:SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD

Asphalt pavement rapid maintenance and drying solidification equipment

The invention discloses asphalt pavement rapid maintenance and drying solidification equipment. The equipment comprises a transport carrier, wherein an asphalt heating and stirring tank is arranged onthe transport carrier, the asphalt heating and stirring tank is provided with an electric heating coil pipe, a spiral conveying rod is arranged in the asphalt heating and stirring tank, an electric heating inner core is arranged in the spiral conveying rod, the lower end of the spiral conveying rod is erected at a discharging port of the lower end of the asphalt heating and stirring tank througha bearing, the electric heating inner core is electrically connected with a conductive wire through a rotating connecting part, formed by an electric conductor, at the upper end of the spiral conveying rod, and the conductive wire is connected with a power supply; and a pressing roller is arranged on the position, at rear side of the asphalt heating and stirring tank, of the transport carrier, thetwo ends of a pressing roller rotating shaft are connected with a cooling system, and cooling liquid is circulated in the rotating shaft and the cooling system. According to the equipment, the spiralconveying rod can quickly convey asphalt downwards to damaged pavement needing to be supplemented with the asphalt, and the asphalt on the pavement can be rapidly flattened by the pressing roller andquickly cooled through the cooling circulation system arranged in the pressing roller, so that the asphalt is hardened.
Owner:百盛联合集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products