The invention provides a prefabricated assembled hollow
pier with built-in rib plates and a construction method, and relates to the technical field of bridge construction. The hollow
pier sequentiallycomprises a foundation, a bottom section, a middle section and a
top cap section from bottom to top. Embedded steel bars are arranged at the top of the foundation, and stirrups are arranged on the embedded steel bars; a
solid section is arranged below the bottom section, the bottom section and the
solid section are prefabricated together, a connecting
steel bar hole channel is reserved in the
solid section, and a
diameter of the connecting
steel bar hole channel is 5 cm larger than that of each side of the embedded
steel bar at the top of the foundation; post-cast concrete is filled in pore channels of the embedded steel bars; the rib plates are arranged on the bottom section, the middle section and the
top cap section, each rib plate is provided with a connecting reinforcing steel bar, each connecting reinforcing steel bar extends out of the corresponding rib plate, and the connecting reinforcing steel bars between the sections are in
lap joint with one another by more than 10 timesof the
diameter of the reinforcing steel bars; and prestressed pipelines are pre-buried in the foundation, the bottom section, the middle section and the
top cap section and are connected by penetrating through full-length prestressed tendons. By adopting the scheme, defects of insufficient
energy consumption and low
ductility of prestressed assembled piers can be overcome.