The invention discloses a construction method for integrated and comprehensive treatment of strip mining goafs, which relates to the field of
coal mine goaf management. Firstly, the gobs are filled with
gangue, and then grouted and filled. The solidified
gangue cemented body has strong stability , so that the goaf after strip mining has the
bearing capacity again, enhances the overall strength, and reduces the bearing load of the
coal pillars on both sides; grouting the cracks and separation
layers on the goaf, making the overlying It is solidified and cemented with the
grout, so that the rock formations that originally had cracks are reconnected together, thereby preventing the overlying strata from continuing to collapse into the goaf; finally, the grouting treatment of the yield zone of the
coal pillar further enhances the strength of the
coal pillar and prevents the collapse of the
coal pillar. The deformation of the
coal pillar; the construction method is simple, the operation is convenient, the integrated comprehensive construction, the cost is low, the overall stability and
bearing capacity of the goaf are ensured, the effect of settlement reduction is remarkable, and it is suitable for large-scale promotion and application.