Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A construction method for comprehensively applying piles and vertical geotechnical materials to treat soft foundations of highways

A technology of geotechnical materials and construction methods, which is applied in the construction field of comprehensively applying piles and vertical geotechnical materials for foundation treatment, can solve problems such as increased engineering costs and ineffective use of lateral bearing capacity, and achieve the effect of reducing vertical settlement

Active Publication Date: 2018-02-27
HOHAI UNIV
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] In the case of deep soft soil foundation, when using piles for foundation treatment, the bearing layer in the foundation soil will be relatively deep. In order to better control the vertical settlement of the foundation soil, the pile length required is relatively long, which will cause a corresponding increase in the project cost. At the same time, because the pile itself bears the vertical load, the lateral bearing capacity of the pile can be improved, but the lateral bearing capacity of the pile has not been effectively utilized in the project

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for comprehensively applying piles and vertical geotechnical materials to treat soft foundations of highways
  • A construction method for comprehensively applying piles and vertical geotechnical materials to treat soft foundations of highways
  • A construction method for comprehensively applying piles and vertical geotechnical materials to treat soft foundations of highways

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] refer to Figure 1 to Figure 6 , the overall construction process of the present invention is:

[0038] Measurement and setting out → Pile construction according to the setting out position → Use special construction machinery to implant vertical geotechnical materials in sections → Connect vertical geotechnical materials and piles → Cushion and embankment filling construction.

[0039] The whole construction process of the present invention is described in detail below in conjunction with accompanying drawing:

[0040] refer to figure 1 Set out the line according to the layout method, determine the pile position and the implantation position of the vertical geotechnical material, and make corresponding marks on the ground. A total station is used to measure and set out the line to ensure the accuracy of the position. The pile spacing and pile diameter and the implantation depth of vertical geotechnical materials are determined according to the filling height and sett...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention disclosed a construction method of the soft base of comprehensive application piles and vertical geomorphous materials, and introduced the construction process in detail.The implantation position of geomorphology materials is marked with the location of the material; 2) Pile construction setting set setting in the step 1) is performed;Materials and pile connection; 5) The construction of the cushion and the embankment is performed.The invention implants vertical geographical materials in the ground base so that the vertical geographical materials and piles work together. On the basis of the vertical sinking of the ground soil, the vertical geomorphous material is achieved.Further improve the effect of foundation treatment.

Description

technical field [0001] The invention relates to the field of highway soft soil foundation treatment, in particular to a construction method for comprehensively applying piles and vertical geotechnical materials to carry out foundation treatment. Background technique [0002] my country's economically developed areas are mainly concentrated along the river, along the lake or along the coast, and the foundation soil in the above-mentioned areas is mostly silt, silty clay or silty loam. The first expressway was built in China in 1988. With the rapid development of my country's economy, the transportation infrastructure has made great progress. Among them, the construction of expressways on soft soil foundations accounts for a large proportion, and due to the current increasing traffic volume , Many existing highways have already experienced congestion, cannot bear the huge traffic pressure, and are facing widening. At present, expressways such as Guangfo Expressway, Shanghai-Ha...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01C21/00E01C3/04E02D27/12
CPCE01C3/04E01C21/00E02D27/12
Inventor 丰土根王路博张福海宋健周密宋海洋胡松陈阳
Owner HOHAI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products