225results about How to "Accelerated consolidation" patented technology

Treatment method for large-thickness collapsible loess

ActiveCN105970911ASmall sinking resistanceAvoid cloggingSoil preservationDynamic compactionSoil horizon
The invention provides a treatment method for large-thickness collapsible loess. The treatment method comprises the following steps: 1) sinking small-diameter steel casing into soil to form pile holes each having a depth equal to or smaller than the thickness of the collapsible loess stratum; 2) inserting (1) 1-6 drain boards or (2) hollow water pipes with a plurality of drain holes or (3) hollow steel pipes with a plurality of nozzles into the pile holes to bottom ends thereof; 3) repeating the steps 1) and 2) until the pile holes with the water injection fittings are formed everywhere in the field; 4) injecting water or injecting water under pressure into the water injection fittings in the pile holes to cause self-weight collapsible settlement of the collapsible loess after immersion; 5) observing and recoding the collapsible settlement amount of the soil mass in a foundation until the collapsible deformation of the soil mass in the foundation is stable; and 6) reinforcing the top-layer soil mass of the foundation by use of a filling compaction method or a dynamic compaction method. The treatment method has the characteristics and advantages of high construction speed, remarkable effect of eliminating loess collapse, dry operation, high bearing capacity, and the like.
Owner:王继忠

Method for processing soft ground by rapid pressurizing pre-compression

The invention discloses a method for processing a soft ground by rapid pressurizing pre-compression, which is characterized by comprising the following steps: (1) arranging a vertical drainage system in a stratum, arranging a horizontal water collecting and drainage rough sand layer and horizontal drainage pipes on ground surface, and burying vibrators at certain intervals while arranging the vertical drainage system; and (2) while applying a static drainage consolidation method, starting the vibrators to make soft soil generate a high pore water pressure that is superposed with a pressure generated by the static drainage consolidation method to drain water in the soft soil quickly. Compared with the conventional vacuum pre-compression or preloading, the method can reduce construction period by more than 1 / 3, improve consolidation and reduce after-construction settlement and cost.
Owner:陈杰德 +1

Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay

The invention relates to a construction method of a spiral oil-extruding filling pile composite foundation in the stratum containing soft clay, which comprises the following steps: determining the structural size, the position and the number of spiral oil-extruding filling piles; manufacturing and constructing a vertical drainage well in the middle part of the design positions of every two adjacent spiral oil-extruding filling piles; manufacturing and constructing each spiral oil-extruding filling pile according to the design position in the middle part between every two finished vertical drainage wells; and then paving drain liner layers on the foundation surface. The invention aims at providing a method for treating the spiral oil-extruding filling pile composite foundation in the stratum containing the soft clay, which avoids the negative oil-extruding effect of the spiral oil-extruding filling piles, improves the drain speed of saturated clay around piles, improves the strength of soil bodies around the piles and under the piles, substantially reduces the settlement after construction, improves the effectiveness and the use range of the spiral oil-extruding filling piles, increases the space length between the piles, reduces the pile number, saves the engineering investment, and accelerates the construction progress.
Owner:CENT RES INST OF BUILDING & CONSTR CO LTD MCC GRP +1

Multiple pressurizing fast consolidated compacting soft earth foundation treatment method

InactiveCN101016740AIncreased excess pore water pressureExpand the scope of processingSoil preservationSoil sciencePresent method
The invention in a technical sphere of soft soil ground treatment in geotechnical engineering relates to a soil ground treatment method in the areas along the sea, the river and the lake. The invention combines a vacuum drainage, a compaction via vibration supercharging, and a compaction via dynamic consolidation supercharging, wherein a higher kinetic head gradient which is consisted of a positive pressure of excess pore water by vibration excitation and a vacuum negative pressure firstly discharges the water in soil and increases the water content in the soil, thereby compacting the soil to a certain extend, and then the dynamic consolidation action is proceeded to improve the excess pore water pressure and form the higher kinetic head gradient thereby draining and compacting the soil. All the steps are proceeded many times to eliminate the settling of the worked deep layer soft soil and to improve surface consolidation degree, intensity, and stiffness until up the design requirement. Compared with the present method, the invention not only has a short time for a project, lower manufacturing cost and settling after work, and a good effect of consolidating and compacting, but also is extensive used in the soft soil ground treatment of various projects in the area along the sea, the river, or the like.
Owner:武亚军

Method of processing soft foundation by quick low position high vacuum layering pre-compacting consolidation

The invention relates to a quick ''low level high-vacuum hierarchical precompression compaction' method for soft ground, the concretely processes are: 1) a sand layer is laid on the ground before filling, then the plastic water discharging boards are inserted vertically, a high vacuum precompression system is arranged transversely in the sand layer, and a layer of plastic air isolating film is covered; 2) the high vacuum precompressing system carries on vacuum and precompression; 3) the sand blowing high vacuum compacting system is arranged on the film transversely or vertically; 4) fills sand on the film to the set height; 5) the high vacuum precompression system carries on precompressing to the set boding rate, the system carries on the first time of vacuuming and discharge, then carries on the first time of compacting or vibration compacting the sand on the film; 6) carries on the second time or several times of 'high vacuum compacting' to the sand to the overconsolidation state. The invention is short period, low price, and the quality is controllable.
Owner:SHANGHAI HARBOUR SOFT SOIL TREATMENT ENG CO LTD

Mine goaf tailing-filled concrete enclosing wall

The invention discloses a mine goaf tailing-filled concrete enclosing wall. The wall body (2) of the mine goaf concrete enclosing wall is a horizontally placed rock-socketed pear-shaped concrete structure. The large end of the wall body (2) faces to a mine goaf (10). The convex drum-shaped upper part of the large end of the wall body (2) runs through a small rock mass well (1). An upper drain pipe (4) and a lower drain pipe (4) are arranged in the wall body (2) and are respectively used as an upper part drain pipe and a lower part drain pipe. The inlet of the upper part drain pipe and the inlet of the lower part drain pipe are respectively provided with a perforated pipe (7). The outlet of the upper part drain pipe and the outlet of the lower part drain pipe are respectively provided with a gate valve (5). A layer of stainless steel wire mesh covers the external surface of the perforated pipe (7) at the inlet of the lower part drain pipe. A sandstone inverted filter body (6) with certain thickness is spread outside the stainless steel wire mesh. A layer of geotextiles covers the surface of the sandstone inverted filter body (6). The invention has the advantages that the wall can bear the pressure of water head above 300m, the water and sand leakage can be prevented, the tailing settlement water can be drained, the tailing pore water can be also drained, and the consolidation degree and the stability of the tailing-filled body in the mine goaf can be improved.
Owner:TONGLING NONFERROUS METALS +1

Double-layer low-position vacuum preload consolidation device and soft soil foundation reinforcing method

InactiveCN101413261AImprove bearing capacitySolve the difficult problem of occupying landSoil preservationSludgeEngineering
The invention provides a double-layer low level vacuum preloading consolidation device and a soft soil foundation consolidation method. The device consists of a main controller, a power distribution controller, a vacuum pump, a submersible pump, a buffer knockout drum, a control valve, a vacuum gauge, a vacuum degree detecting head, a hydraulic fill consolidation layer vacuum pipe network, a soft soil consolidation layer vacuum pipe network, a subsidence mark, an open water overflow port, pipes and gauge tables, wherein a cofferdam is reclaimed along the consolidation area border in the soft soil foundation, a soft soil consolidation layer is formed in the cofferdam, the soft soil consolidation layer is provided with the soft soil consolidation layer vacuum pipe network and a hydraulic fill consolidation layer, the hydraulic fill consolidation layer is provided with a bearing separation layer and the hydraulic fill consolidation layer vacuum pipe network, and the hydraulic fill consolidation layer vacuum pipe network is hydraulically filled with a sealing layer. The invention has the advantages of reasonable structure, convenient construction, short construction period, low cost, good consolidation effect, facilitation of construction in large areas, consolidation of the soft soil foundation, dredging, and reutilization of the dredged sludge after consolidation, and can solve the problem of difficult land occupation of a blow-off field and create economic benefits.
Owner:TIANJIN WATER RESOURCES RES INST

Construction method for vacuum combined preloading consolidated foundation

The invention discloses a construction method for a vacuum combined preloading consolidated foundation, and belongs to the field of building construction. The construction method is characterized by comprising the steps of (1) laying a sand mat; (2) constructing a plastic drainage plate; (3) arranging a drainage filtering water pipe, and constructing a vacuum pumping device and a sealing system; (4) conducting vacuum combined preloading; (5) conducting field observation and instrument embedment. According to the construction method for the vacuum combined preloading consolidated foundation, the reinforcement effect on a soft soil foundation is obvious, soil body solidification can be accelerated, the soil body status is improved, post-construction settlement of a building is reduced, and the novel foundation treatment method is expected to be widely used in construction for hydraulic works.
Owner:LUOYANG GUANGXIN CONSTR GRP

High-efficiency curing method for soft soil site with high moisture content

ActiveCN109763480AEfficient reinforcementReduce inputSoil preservationSoil scienceCement slurry
The invention belongs to the technical field of environment rock-soil engineering and discloses a high-efficiency curing method for a soft soil site with high moisture content. The high-efficiency curing method comprises an in situ chemical curing step and a preloading drainage step; the in situ chemical curing step comprises investigating sites, determining physical and chemical indexes such as depth, area, moisture content, organic matter content, liquid plastic limit and salt content of the soft soil site; blending a curing agent, determining the types, adding ratio, and initial and final setting time of the curing agent based on the physical and chemical indexes; blocking the site, and building partition walls for site blocking in the soft soil site; carrying out chemical curing construction, and uniformly mixing the blended curing agent with to-be-cured soft soil; carrying out preloading drainage construction according to three construction modes of vacuum preloading or surchargepreloading or vacuum surcharge preloading; unloading and repairing the site; after preloading time reaches 28 days, swabbing off drained water from the upper surface layer of curing blocks, unloadingand injecting cement slurry into a drain board for secondary repair and reinforcement by adopting a high-pressure grouting pump.
Owner:INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI

Cosolidation with sludge dredging and water draining

This is a quick damming method suitable for yielding soil treatment composed by several layers of sullage and sand. At building, a layer of sullage is dumped then a layer of sand. Sand will sink into sullage by gravity to increase sullage penetrability. The procedure is repeated till reach the designed height. Put loading, like water bag, to the dam top to move out water and solidify.
Owner:SOUTHEAST UNIV

Sand cushion-free pre-compacting water-draining consolidation method for soft soil foundation

InactiveCN1837498AAccelerated consolidationSolve the problem of horizontal drainageSoil preservationWater dischargeEngineering
The invention discloses a soft ground non-sand pre-compress water discharge solidifying method, which comprises following steps: a, arranging sample on the soft ground, and vertically inserting plastic discharge plate; b, laying horizontal water discharge tubes which are connected to the spanner of discharge plate that near the ground, while one row plates are relative to one discharge tube. The invention can replace traditional rough sand, to solidify the soft ground in variable conditions, even without sand. The invention can reduce the cost and time.
Owner:CCCC FOURTH HARBOR ENG CO LTD +2

Construction method of deep and thick soft soil foundation bed bridge abutment

The invention discloses a construction method of a deep and thick soft soil foundation bed bridge abutment. The method comprises steps as follows: 1) forming a bridge abutment land construction area; 2) performing primary soft foundation treatment-vacuum water covering and pre-pressing treatment on the bridge abutment land construction area; 3) performing bridge abutment pile foundation construction and bearing platform construction; 4) performing secondary soft foundation treatment-composite foundation treatment on the bridge abutment land construction area; 5) backfilling the area behind the bridge abutment with a filler; and 6) completing the construction of a bridge abutment concrete structure. According to the construction method, due to the secondary soft foundation treatment, post-construction settlement of a road behind the bridge abutment and settlement differences between the road and a bridge abutment structure are reduced, and the phenomenon that a vehicle bumps at a bridge head can be prevented. The construction method of the deep and thick soft soil foundation bed bridge abutment is simple, convenient and feasible, high in efficiency, safe and reliable, and can control the project quality conveniently and save labor power, material resources and financial resources. The construction method is applicable to an area with a low foundation bearing capacity.
Owner:TIANJIN 20 CONSTR

Wet and soft soil foundation treatment method

The invention discloses a wet and soft soil foundation treatment method which comprises the steps of 1, backfilling completely within the roadbed width range; 2, before roadbed construction, firstly, removing surface water, and then removing the surface layer salinized soil and surface organic matter of a construction region; 3, backfilling gravel soil within the treatment range, and carrying out primary rolling; after rolling is finished, leveling to form a cross slope; 4, excavating two trapezoid drainage ditches respectively at the two sides of a roadbed; 5, laying a plastic drainage plate; 6, dynamic compaction, compacting by points for twice and fully compacting for once; 7, after dynamic compaction treatment, rearranging the roadbed, and cleaning the overground part of the top of the drainage plate; laying a middle coarse sand cushion layer as a drainage channel, wherein the gradient of the middle coarse sand cushion layer is equal to that of the roadbed; placing a bending part of the plastic drainage plate in the center of the sand cushion layer to enable the bending part to be communicated with the sand cushion layer; 8, backfilling gravel soil onto the middle coarse sand cushion layer; 9, after the roadbed is finished, laying gravel on the surface layer, rolling and compacting.
Owner:JINAN MUNICIPAL ENG DESIGN & RES INSITITUTE GRP

Structure and method for dissipating excess pore water pressure and reinforcing shield tunnel soil body

InactiveCN103422868AIncrease soil effective stressAccelerate soil consolidationUnderground chambersTunnel liningStructural engineeringStructure of the Earth
The invention discloses a structure for dissipating excess pore water pressure and reinforcing a soil body around a shield tunnel. The structure comprises pipe pieces, first type grouting holes, second type grouting holes and infiltration bars, wherein the first type grouting holes and the second type grouting holes are formed in the pipe pieces, the infiltration bars are arranged to be hollow, and holes are drilled all over the bodies of the infiltration bars. The infiltration bars are integrally arranged inside the pipe pieces in a buried mode through the first type grouting holes, the tail ends of the infiltration bars are connected with the first type grouting holes, the first type grouting holes with the infiltration bars are distributed with the second type grouting holes as centers, four first type grouting holes with the infiltration bars are distributed in the adjacent periphery of each second type grouting hole, and four second type grouting holes used for grouting are distributed in the adjacent periphery of each first type grouting hole provided with the infiltration bar. According to the structure, the infiltration bars are inserted into the grouting holes of the pipe pieces and the infiltration bars are used for extracting water in surrounding soil, so that an infiltrating path is provided for the water contained in the soil body around the tunnel, excess pore water pressure is dissipated, effective stress of the soil is increased and soil solidification is accelerated.
Owner:TONGJI UNIV

Foundation heating device and construction method for foundation heating combined vacuum prepressing of soft soil foundation by applying such device

The invention discloses a foundation heating device and a construction method for foundation heating combined vacuum prepressing of a soft soil foundation by applying such device. Vertical plastic draining plates are arranged in a foundation, plate heads of the vertical plastic draining plates are connected to transversely arranged filter pipes, outlet ends of all filter pipes are communicated with an inlet of a pressure guiding flow separating device, heating devices are further arranged in the foundation, a sand cushion layer is paved on the foundation, the filter pipes are buried in the sand cushion layer, a thermal insulation layer is paved on the sand cushion layer, and a sealing film is paved on the thermal insulation layer to form a closed vacuum prepressing system. During work, the pressure guiding flow separating device is firstly opened to perform foundation reinforcing treatment by a general vacuum prepressing method; when general drainage consolidation is performed to the later stage, a temperature control heating body is opened to perform foundation heating, meanwhile the foundation is vacuumized, and by controlling a foundation heating temperature and a foundation absolute pressure, water content in the foundation is converted to a gas state from a liquid state, and therefore, the water content of the foundation is further reduced, and the strength of the foundation is increased.
Owner:TIANJIN UNIV

Soil column testing apparatus for simulating solute transport in consolidated soil

The invention discloses a soil column testing apparatus for simulating solute transport in consolidated soil. The apparatus mainly comprises a pressurization and consolidation device and a soil column seepage device, wherein the pressurization and consolidation device mainly controls a pressurization disk via an air compressor and an air cylinder to apply a pressure onto a soil sample in a soil column so as to allow the soil sample to be consolidated, and then the soil column seepage device is used for seepage testing of the consolidated soil sample. According to the invention, a water head at the upper part of the soil column can be maintained at a constant value by controlling the placing height of Mariotte's bottle, so pore water in the soil column is allowed to be transported in the consolidated soil under the condition that the water head maintains constant, and the phenomena of transport and diffusion of pollutants in the consolidated soil under a constant water head condition is simulated.
Owner:ZHEJIANG UNIV

'Short-distance overload vacuum precompression and dynamic water-drainage consolidation united method' soft foundation processing method

A ''short-range overloading vacuum prepressing---dynamic discharging consolidation combination method'' to dealing with the soft soil ground foundation, its features are : overloading prepressing the vacuum membranes of conventional vacuum prepressing method with covering water; proceeding the settlement observation to each settlement observation points according the vacuum prepressing operating rules, continuing prepressing 5~10 days after the prepressing settlement above 80% of calculate settlement, then stopping the water overloading vacuum prepressing after ensuring stable completely; removing the vacuum membrane and sun-curing 1~2 days, then proceeding the dynamic dewatering consolidation to eliminating the stored water in sand cushions which is leaved when overloading vacuum prepressing rapidly, then dynamic consolidation or roller compaction after the water level below 1.5m. Its beneficial effects are: it can eliminate the water in muck soil during a short time and enhance the consolidation degree; it makes the skin soil layer get the greatest density, meets the requirements of load bearing capacity and rigidity rapidly and prevents rebound phenomenon; it shortens the construction period and lowers the costs and applies to large area project filling soil recently which has large thickness saturated soft soil particularly.
Owner:CCCC ROAD & BRIDGE SPECIAL ENG

Method for determining soft soil foundation landfill site foundation treatment mode based on foundation bearing capacity

The invention discloses a method for determining soft soil foundation landfill site foundation treatment mode based on foundation bearing capacity. Firstly correction of foundation bearing capacity is carried out according to geological exploration report, then whether the corrected foundation bearing capacity meets landfill site total load requirement is judged, and whether treatment is required is determined according to the judging result, if treatment is required, the selected treatment mode includes foundation treatment by adopting reinforcement cushion rubber (1) or foundation treatment by adopting reinforcement cushion rubber and setting vertical shaft (2). The invention utilizes the load characteristics of large occupying area of landfill site, long load application period and step application, landfill process of landfill site is taken as step loading process, the improvement of foundation bearing capacity in operation period of landfill site is analyzed according to piling, loading and prepressing method, the landfill speed and foundation bearing capacity correspond over time by controlling operation procedure, and meanwhile reinforcement cushion rubber is arranged to provide a drainage layer for soft soil foundation, thus not only improving foundation bearing capacity but also being capable of effectively reducing differential settlement of small repository.
Owner:TIANJIN MUNICIPAL ENG DESIGN & RES INST

Flood discharge structure for red mud filter cake storage yard

The invention discloses a flood discharge structure for a red mud filter cake storage yard. The flood discharge structure comprises a flood discharge vertical shaft (1) arranged in the middle of the storage yard, wherein the wall of the flood discharge vertical shaft (1) is provided with a plurality of rows of windows (3); and the bottom of the flood discharge vertical shaft (1) is connected with a flood discharge pipeline (2). The flood discharge structure is characterized by also comprising a flood discharge vertical shaft (1)-centered flood regulation tank (4), wherein the whole flood regulation area is in a column basin shape; and each window (3) is provided with a blocking plate (5). A diluvial area of the storage yard is limited in a small range, so that the decrease speed of dry beach length of the storage yard is reduced, the safe operation time of the storage yard is prolonged, and the effective storage of the storage yard is increased; meanwhile, a novel structure of the windows and the blocking plates thereof is adopted, so that the solidification of red mud nearby the vertical shaft is accelerated, and the safety stability of the storage yard is facilitated.
Owner:GUIYANG AL-MG DESIGN & RES INST

Long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method

The invention provides a long-short plastic drainage plates-combined secondary vacuum preloading foundation processing method, which comprises the following main steps of: laying geotextile or woven cloth on the surface of a foundation to be processed; arranging shallow longitudinal short plastic drainage plates in a striking manner; arranging a transverse drainage system for the short plastic drainage plates; laying a vacuum sealing membrane; removing water and gas in the transverse drainage body for the short plastic drainage plates by using a vacuum pump; stripping away the vacuum sealing membrane; arranging deep longitudinal long plastic drainage plates in a striking manner; arranging a transverse drainage system for the long plastic drainage plates; laying a vacuum sealing membrane; and synchronously removing the water and gas in the transverse drainage systems for the long and the short plastic drainage plates by using the vacuum pump. By using the technology, an early-stage shallow preloading system and later-stage deep processing are organically combined, the time for solidification of foundation soil is shortened, the effect of reinforcing is enhanced, and a fast and efficient construction process is realized.
Owner:河北晟港工程勘察设计有限公司

Negative skin friction (NSF) removing foundation treatment method

InactiveCN103741670AGuaranteed settlement deformationWarranty requirementsSoil preservationCrushed stoneBearing capacity
The invention discloses a negative skin friction (NSF) removing foundation treatment method. A method for combining discrete piles and flexible piles is used for treating NSF caused by self-weight consolidation of a soil body, gravel piles or sand-gravel piles can serve as the discrete piles, the discrete piles and the flexible piles are arranged at intervals, and gravelly soil cushions are laid on the foundation surface above the discrete piles and the flexible piles. According to the NSF removing foundation treatment method, self consolidation settlement of foundation soil is reduced by construction compaction and vibro-compaction of the discrete piles, loads can be transmitted to foundation supporting layers by the construction of the flexible piles so that stress and compressive deformation of a reinforced zone can be reduced, and 'extrusion' and 'clamping' effects can be achieved on soil among piles under the combined action of the discrete piles and the flexible piles so that consolidation settlement of the foundation soil and NSF caused by the consolidation settlement of the foundation soil can be inhibited. Meanwhile, the combined foundation treatment method can improve bearing capacity of a foundation to a large extent by drainage consolidation and substitution of the flexible piles.
Owner:SOUTHEAST UNIV

Oil sands fluid fine tailings dewatering using rim ditching

A process of dewatering tailings is provided comprising mixing the tailings with a sufficient amount of an additive or a mixture thereof; depositing the resulting mixture into a disposal area; pumping water from the deposit to one or more sumps, and allowing the deposit to reach a sufficient strength; and removing remaining deposit water and rainfall through one or more of a network of ditches, a decant tower, or a plurality of dike drainage structures to yield a non-segregating deposit for reclamation.
Owner:SYNCRUDE CANADA LTD

Movable feeding and constructing method for dynamic reinforcing surface layer of large area flabbiness foundation

InactiveCN101109177ALow costFree dischargeSoil preservationSurface layerEngineering
A movable filler for power reinforcing the surface course of a large-area soft and weak foundation and the construction method for the movable filler is provided, which pertains to the technical field of water conservancy, harbor and construction technology. Wherein, the movable filler essentially comprises the following three structural parts: earthworker fabric or earthworker grid fabric at a base course (1), an earthworker bag course (3) and a rubber protective board (4). The method in the invention is to tamp in three times the movable filler at the surface course, which solves the problems associated with the reinforcing of foundation at area without sand and stone such as high investment and long period, etc., solves well the normal power reinforcing of a soft and weak foundation without sand and stone; the construction period is short, and the movable filler at the surface course can be used in repeated way.
Owner:HOHAI UNIV

Method for treating soft foundition by fast 'high vacuum impacting dense, pile base' compound method

The invention relates to a fast í‹high vacuum striking thickness, pile foundationíŒ composite soft foundation processing method. Its features are densely setting well point pipe in soft soil; connecting it with vacuum pump by lying pipe to remove the well point pipe; striking thickness; repeating the cross action of well point pipe vacuum pumping and striking thickness for many times; filling crushed stones to strike to pillar, or adopting pipe sinking to form crushed stone pile, or stirring concrete to form pile to make the soft soil combine crushed stone pile / pillar or concrete pile to form composite foundation. The invention can effectively increase foundation bearing. And its working post or differential settlement is little.
Owner:SHANGHAI HARBOUR SOFT SOIL TREATMENT ENG CO LTD

Preparation method of high-temperature resistance multilayer precoated sand

The invention provides a preparation method of a high-temperature resistance multilayer precoated sand, which comprises the following steps: a)heating screened quartz sand or ceramsite in a high-temperature furnace to 150-180 DEG C and then placing in a first-grade sand mixer, injecting a coated material while stirring, adding a curing agent after stirring for 10-20 seconds, continuously stirring for 90-240 seconds to obtain the precured coated quartz sand or ceramsite; b)placing the precured quartz sand or ceramsite in the step a) in a secondary sand mixer for heating to the temperature of 150-180 DEG C, injecting nonsaturated resin, organosilicon and the curing agent while stirring, stirring for 40-140 seconds to obtain the solidifiable coated quartz sand or ceramsite; and c)cooling the solidifiable coated quartz sand or ceramsite in the step b) to the temperature of 100-110 DEG C and placing in a third-grade sand mixer, adding calcium stearate with inertia resin weight of 5-7%, and uniformly stirring to obtain the product for warehousing.
Owner:CHINA PETROLEUM & CHEM CORP +1

Three-layer knitted composite fabric and production technology thereof

The invention belongs to the technical field of clothing materials, particularly relates to three-layer knitted composite fabric and a production technology thereof, and solves the technical problems of poor wearing comfort, poor shape maintenance performance, small application range and the like in the prior art. The three-layer knitted composite fabric comprises wrap-weft insertion warp knitted fabric, outer fabric and inner fabric, wherein a first double-dot coating is arranged on one surface of the wrap-weft insertion warp knitted fabric; the outer fabric is connected with one surface of the wrap-weft insertion warp knitted fabric through the first double-dot coating; a second double-dot coating is arranged on one surface of the inner fabric, and the other surface of the wrap-weft insertion warp knitted fabric is connected with the inner fabric through the second double-dot coating. The production technology of the three-layer knitted composite fabric comprises steps as follows: A, preparation of materials; B, compositing. The three-layer knitted composite fabric and the production technology thereof have the advantages that the technology is simple, good balance between the wearing comfort and the shape maintenance performance can be kept, and the application range can be enlarged.
Owner:CPL NEW MATERIAL TECH CO LTD

Bamboo joint type sleeve pile and electroosmosis combined soft soil roadbed reinforcement system and construction method

The invention relates to a bamboo joint type sleeve pile and electroosmosis combined soft soil roadbed reinforcement system. The system is characterized by comprising an electroconductive plastic drainage plate, bamboo joint type sleeves, a prefabricated pile point and a prefabricated cover plate; the strip electroconductive plastic drainage plate tightly fits the outer sides of the bamboo joint type sleeves; the bamboo joint type sleeves are fixed through steel rings at certain intervals; the prefabricated pile point is arranged at the bottom end of a bamboo joint type sleeve pile; a U-shaped reinforcing bar is pre-buried in the prefabricated pile point; the bottom end of the electroconductive plastic drainage plate is connected with the U-shaped reinforcing bar; the prefabricated cover plate is arranged at the top end of the bamboo joint type sleeve pile; a preformed hole for allowing the electroconductive plastic drainage plate to pass through is reserved in the prefabricated cover plate; the electroconductive plastic drainage plate stretches out of the preformed hole; and the electroconductive plastic drainage plate is connected with a direct current power source through a conducting wire. The bamboo joint type sleeve pile and electroosmosis combined soft soil roadbed reinforcement system has the beneficial effects that the bamboo joint type sleeve pile is formed through connecting sections of bamboo joint type sleeves, and the problem that the construction is difficult due to the fact that the sleeve length of a conventional plastic sleeve pile is difficult to control is solved; and the bamboo joint type sleeves have bulges, so that the friction force of a common plastic sleeve pile and a surrounding soil body is improved, and the bearing capacity is improved.
Owner:ZHEJIANG UNIV CITY COLLEGE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional