Industrially-manufactured dam component and method for quickly building dams
A kind of technology for building dams and industrialization, which is applied in the field of dam construction and dam construction, which can solve the problems of long construction period, shortage of stone materials, poor reliability, etc., and achieve the effects of material saving, rapid improvement of foundation strength, and improvement of stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Embodiment 1 is a coastal soft foundation dam construction project, which is divided into 16 construction unit blocks, and its dam section is as follows: figure 1 As shown, the method includes the following steps:
[0031] A. Lay 500g / m on the embankment that has been measured and set out 2 Needle-punched non-woven geotextiles (2), throw medium-coarse sand with a thickness of 2m and a mud content of less than 5% on the geotextiles as a sand cushion (4), interspersed in a triangular arrangement with a spacing of 1.5m, and a depth of 16m The vertical plastic drainage plate (1) of the vertical plastic drainage board (1), forms the horizontal and vertical drainage channel; B. Buried the instrument, set the sign, lay the filter drainage vacuum pipe; cover three layers of polyvinyl chloride sealing film (5), excavate the vacuum preload Seal the film groove, lay the sealing film and backfill it with silt, and seal the surrounding groove (3); install a vacuum pump, connect the...
Embodiment 2
[0032] Embodiment 2 is the sea reclamation project of a certain soft foundation dam, and its dam section is as follows figure 2 Shown, its method is similar with embodiment 1, and difference is: F. fill the easily subsidence position of embankment core (11) with light material (17), mix in the earthwork of filling with light material (17) (18). G. After the embankment is stable, do the surface laying treatment of the embankment crest (10); use the top concrete (16) on the embankment top, and use concrete (15) on the water face to form slope protection and masonry anti-wave wall, use prefabricated 8 tons Twist " king " word block body face protection, lay face protection block body (14) from bottom to top.
[0033] Through the comparative analysis of various dams, the advantages of the present invention have been fully reflected: the added dam components are connected to each other to form a dam skeleton, which improves the slope coefficient of the dam body, and reduces the f...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com