The invention discloses a treatment method of a dug roadway roof fall. The treatment method comprises the steps that after roof falling is completed, roof falling
gangue is cleaned up timely, and loose
coal-rock masses on the surface of a roof fall area are stirred up and fall; then a I-shaped
steel frame shed is erected within a certain range of the roof fall area and the two sides and a layer ofwooden plate is tiled on the frame shed; then a filling bag is opened and the periphery of the bottom of the filling bag is fixed to the wooden plate, one end of a
steel pipeline extends into the bagfrom a sleeve opening at the bottom of the filling bag and the top of the filling bag is supported to the highest point of the roof fall area, the
steel pipeline is fixed and the other end of the
steel pipeline is connected with a filling pipeline, the sleeve opening is fastened, and grouting is conducted till the whole roof fall area is filled with
grout; and finally after the
grout is cured, anchor cables are driven in the range of the roof fall area. According to the treatment method of the dug roadway roof fall,
pressure stress can further be actively provided for the
coal-rock masses onthe surface of the roof fall area by means of filling bodies while it is ensured that the filling bodies are stable, the stress environment of the
coal-rock masses on the surface of the roof fall areais improved, once more roof falling of the roof fall area under the effect of construction disturbance can be effectively prevented, operation is simple, and the applicability is high.