The invention discloses a method for tunnel smooth blasting
drill construction. The method comprises the steps of installing a drilling rig direction controller on a rock
drill, wherein the drilling rig direction controller is used for directly displaying up-and-down and left-right deflection directions of a drilling rig; before the rock
drill enters a tunnel, performing
line element section segmentation on a tunnel center line, calculating an
azimuth of each section of tunnel center line according to the
line element section, wherein the
line element section comprises a straight line section, a straight easement section, an easement
circular section, a circular curved section, a circular easement section and an easement straight section; the
azimuth is an included
angle alpha of each section of tunnel center line and the
true north direction; after the rock drill enters the tunnel, setting the angle of the drilling rig direction controller as the
angle alpha for each section of tunnel, causing a drilling rig
manipulator to perform drilling according to the
angle alpha, guaranteeing that drilling is performed according to the designed drilling rig direction, and thus a periphery hole depth is controlled. According to the method, extensive type construction by experience during hand excavation is solved, and precise positioning in the rock drill drilling direction during tunnel excavation is achieved.