The invention discloses a mine ecological remediation and slope
vegetation fast restoring method suitable for the
arid region. The method comprises a slope protection method and the steps that water collecting devices are arranged; soil improvement is carried out;
vegetation configuration is carried out. Firstly, according to the through slope arrangement, mining slide slopes needing to be restored are subjected to step type slope
cutting to be stabilized, an ecological
catchwater is arranged on the inner side of each stage of a platform, and the steps are continuously provided with desilting basins and water collecting pits every other certain distance. Water collecting devices are mounted in the water collecting pits and connected with the desilting basins and the catchwaters, the other ends of the water collecting devices are provided with controllable drainage ports, the water collecting devices are connected with a slope
irrigation system and used for collecting and fully and reasonably utilizing slope runoff, a
dry season irrigation water source is provided, meanwhile, slope scouring is avoided, and water and soil losses are reduced. The platform and the slopes are all covered with earth, a planting pit is dug in each stage of the platform, the mode of ecological bags and ecological blankets is adopted in each stage of the slopes, a
soil conditioner and foreign soil from other places are mixed, the planting pits, the ecological bags and the ecological blankets are filled with the mixture, and good water and
fertilizer conditions are provided for
plant growth. Proper trees brushes and grasses are selected to be distributed. The ground conditions of the side slopes are comprehensively improved, and side slope vegetations are restored to the natural ecological state.