Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

61 results about "Bench marking" patented technology

Meaning of Bench Marking: According to APQC, “Bench marking is the process of identifying learning, and adopting outstanding practices and processes from any organization, anywhere in the world, to help an organization improve its performance.

Identity validation and verification system and associated methods

A computer implemented system and method verify and validate a user identity for enrollment in a secure personal dataset accessing system. A personal dataset includes identifiable attributes of the user. Using a computer, authenticity of an asserted user identity includes electronically verified identifiable attributes to form the personal dataset. A biometric identifier of the user is automatically captured for validating the identifiable attributes by confirming that the asserted identity matches the identifiable attributes. A traceable e-audit trail is provided in an enterprise infrastructure and bench mark performance indicator. A digital security element is generated and results in the user electronically receiving a password and a unique electronic address is assigned to the user. The digital security element is then transmitted to the user from the computer and enables electronic access to the personal dataset relating to the user, the personal dataset having been authenticated through the verification and validation.
Owner:KRAGH JAMES F

Wind measurement data wind speed correction method based on probability distribution transfer

The invention discloses a wind measurement data wind speed correction method based on probability distribution transfer. The method comprises the steps that firstly, statistical description is carried out on wind speed through a Weibull distribution function; then, the wind speed probability distribution estimated values of an actual measurement year long-time meteorological station, an actual measurement year wind field observation station, a representative year long-time meteorological station and a representative year wind field observation station corresponding to the ith sequence number are respectively calculated; finally, the wind speed is actually measured by the actual measurement year wind field observation station corresponding to the ith sequence number according to hourly wind speed data and the probability distribution estimated values, and the correction wind speed of the representative year wind field observation station corresponding to the ith sequence number is calculated through a probability distribution identical difference value transfer method or a probability distribution identical multiple proportion transfer method. According to the probability distribution transfer method for wind speed correction, the defect that common correlation coefficients in an existing correlation analysis class method are too low and have to be used for correction is overcome, and the method can be suitable for wind speed correction under the conditions that the distance of project sites of an inshore or offshore wind plant and the like and a long-time meteorological bench-mark station is too far or the correlation of the existing method is poor.
Owner:CEEC JIANGSU ELECTRIC POWER DESIGN INST

Generation method and device for training samples

The embodiment of the invention discloses a generation method and device for training samples. The method comprises the steps of training a standard scoring model through utilization of a marked sample and generating an adjustment training model; inputting a to-be-marked sample into the adjustment training model and generating a model score corresponding to the to-be-marked sample; determining a marking sample score corresponding to the to-be-marked sample according to an association relationship between a sample score of the marked sample and the model score of the marked sample, and the model score corresponding to the to-be-marked sample; and marking the to-be-marked sample through utilization of the marking sample score and generating a newly marked sample. According to the technical scheme provided by the invention, the technical problem that a manual training sample marking mode is high in obtaining difficulty and long in marking time period and the accuracy cannot be ensured issolved, the manual training sample marking workload is reduced, and the training sample marking efficiency is improved.
Owner:BAIDU ONLINE NETWORK TECH (BEIJIBG) CO LTD

Hot melt type vibration gage mark coating

The invention discloses a melt vibrating bench mark paint, which is characterized by the following: the paint is composed by following mass percent raw material: 15-12% C5 resin, 5-2% titanium white, 1.3-1.0% EVA, 35-32% quartz sand, 35-32% heavy calcium carbonate, 12-10% glass bead, 1.0-0.8% vegetable oil, 1.3-1.0% polyethylene wax and 0.04-0.02% ultramarine; the product is a new type road safety gage mark material; the method chooses single-purpose glass micro bead with refractive index table bigger than 1.5. This material possesses bloomy look and reflecting characteristics, which can be used to urban road, suburb road, airport and highway widely.
Owner:周鹏

Rail traffic catenary system and conductor rail measuring method based on rail foundation pile control network

InactiveCN103276644AHigh precisionRealize "trackless" measurementMeasuring apparatusBench markingLevel measurement
The invention discloses a rail traffic catenary system and conductor rail measuring method based on a rail foundation pile control network. The method includes on-site pile delivery, calculation of interior work, center line measurement and level measurement, setting out and piling and settlement of interior work. The center line measurement includes 1, delivering the piles according to a route design drawing; 2, measuring the center line by a coordinate setting-out method; and 3, measuring level. Pile delivery documents include rectilinear and curvilinear permanent and added temporary bench marks, a king-pile mileage chart, a uniform mileage chart, a uniform mileage and construction mileage comparison chart, a slope chart and a leveling point chart, and guide line pile coordinates provided by design and a position distribution chart thereof. The rail traffic catenary system and conductor rail measuring method has the advantages that rail-less measurement is realized, technical support for accurate measurement is provided, and accuracy of hanger mounting and adjusting is improved greatly.
Owner:中铁七局集团电务工程有限公司

Method and device for decoding broadcast channel (BCH) code

The embodiment of the invention provides a method and device for decoding a broadcast channel (BCH) code. The method comprises the steps: computing a syndrome according to a receiving code; solving the polynomial of an error position according to the syndrome by an iterative algorithm; confirming the error position according to the polynomial of the error position by a money type search algorithm; and correcting an error value on the confirmed error position to obtain a recovering code. The method and device for decoding the BCH code of the embodiment can optimize a parallel bench mark (BM) iterative algorithm on the resource and the speed by improving the riBM algorithm.
Owner:HUAWEI DIGITAL TECH (CHENGDU) CO LTD

Calibration benchmark construction ruler and method for wall plastering construction benchmark calibration by applying calibration bench mark construction ruler

The invention discloses a calibration benchmark construction ruler, which comprises a ruler rod, two lock catch removing inserts, a plurality of lock catch pieces and a wrenching lock catch removing external member, wherein the front end surface of the ruler rod is a working surface, the lock catch pieces are arranged at intervals to form a line and are hinged in hinge slots on the two side wallsof the ruler rod, the two lock catch removing inserts are symmetric and are arranged in installing slots on the two side walls of the ruler rod in a sliding way, the top parts of the lock catch removing inserts are extended out of the installing slots, the lock catch removing inserts are positioned between the hinge slots and the working surface of the ruler rod, the top parts of the lock catch removing inserts, which correspond to the lock catch pieces, are provided with recesses, the wall surfaces of the recesses have inclination degree, the front ends of the lock catch pieces pass through the recesses to extend out of the front end surface of the ruler rod, the wrenching lock catch removing external member is arranged on the ruler rod and is connected with the lock catch removing pieces, and the wrenching lock catch removing external member is used for wrenching the lock catch removing inserts to slide in the installing slots. The invention also discloses a method wall plastering construction benchmark calibration by applying the calibration bench mark construction ruler.
Owner:DONGGUAN CAILI BUILDING MAINTAIN TECH

Double layer alignment device and double layer aligning method

The invention provides a double layer alignment device, which includes a fixing frame, and a first measurement apparatus and a marking plate arranged on the fixing frame, wherein the marking plate is provided with a frame fixing mark, and a moving bench, and a reference mark, a moving bench mark, and a second measurement apparatus that are arranged on the moving bench. The relative positional relation between the reference mark and the moving bench mark is measured through the first measurement apparatus, and the relative positional relation between the reference mark and the frame fixing mark is measured through the second measurement apparatus, so that the final relative positional relation between the moving bench mark and the frame fixing mark is obtained. The moving bench is moved to a set position according to the final relative positional relation. The invention correspondingly provides a double layer aligning method. Only moving bench in the system is a moving part. A static calibration method is used to calibrate a coordinate relation, and the calibration accuracy is not affected by position accuracy of the moving bench, so that the alignment accuracy is improved. Through the design of dual lenses or multiple lenses, the apparatus is flexible in arrangement and improved in alignment efficiency.
Owner:SHANGHAI MICRO ELECTRONICS EQUIP (GRP) CO LTD

Method for detecting depth of underground pipelines

The invention relates to a method of for detecting the depth of underground pipelines, which comprises the following steps: (1) connecting a probe with a hydraulic tank as well as a signal acquisition instrument by cables, connecting a rope to the probe; (2) threading a detecting rope in an empty sleeve of a to-be-detected well embedded with pipelines by a threading device; setting a bench mark near an end well on the ground; measuring the elevation of the bench mark by a geometric leveling method; (3) measuring the relative height of the bench mark bya hydraulic sensor and driving the probe to move in the empty sleeve, meanwhile, measuring the heights of the hydraulic sensor in different positions; (4) calculating horizontal shift distance L of a detected point according to the Pythagorean proposition; and (5) summarizing to obtain embedding depths of the pipelines embedded in different distances. The method effectively avoids the interference between to-be-built underground projects and the embedded pipelines, meets building requirement of modernized urban underground projects, and facilitates construction of the urban underground projects.
Owner:李红梅

Bearing gasket machining technology

The present invention provides a kind of bearing washer processing technology, comprises the following steps: a, stock preparation, selects the bar stock of corresponding material; . The fitter scribed and pierced the wire hole; d. Wire cutting, wire cutting the inner hole of the bearing washer and cutting the bar material into shape, leaving a margin of 0.4-0.6mm for the thickness of the washer; e. Heat treatment, heat treatment to ensure the gasket The hardness is 58‑62HRC; f, grinding machine finish machining, the grinding machine finish machining the bearing gasket to the size requirements; g, flaw detection test, conduct flaw detection test on the processed bearing gasket. The bearing washer processing technology of the present invention has the advantages of simple procedure, convenience and quickness, low processing cost and convenient batch processing.
Owner:方芳

Water landscape design method enabling flow characteristics of tidal floods rarely happening to reappear scientifically

The invention provides a water landscape design method enabling flow characteristics of tidal floods rarely happening to reappear scientifically. Actual measurement terrain, geological data and hydrologic data of a natural river course are collected; the range of model, the number of section boards and adopted materials are determined according to a similarity criterion; a lofting section is selected from an actual measurement topographic map, and a model section board the same as a natural riverbed in form is manufactured; a control wire of the model is determined, a model side wall line is designated, a horizontal control network and a vertical control network are made, a bench mark is set, and the model is installed according to a river course topographic map; actual measurement runoff flow hydrographs and river mouth actual measurement tide tide-level hydrographs of dry season typical days and flood typical days of a natural river hydrometric station are verified; flow rates of corresponding sections of a natural riverbed are verified; erosion and deposition verification is carried out on the actual measurement topographic map of the natural river course and the model before and after channel forming discharge occurs; a water circulation system is established, so that water landscapes designed according to the method have extremely high academic value and added economic value.
Owner:FUJIAN PROVINCIAL INVESTIGATION DESIGN & RES INST OF WATER CONSERVANCY & HYDROPOWER

Detection method for assembled floor-board water absorption expansivity

The invention discloses a detection method of water absorption expansion rate of assembled floors, comprising the following steps: 1) assembling four floors wherein the middle two floors are arranged in vertical line shape and another two floors are arranged at the two horizontal sides of the two middle floors, the four floors are in the shape of a Chinese character 'zhong'; 2)respectively making five bench marks respectively in the middle point of the assembling point of the middle two floors, respectively arranged at the upper and lower 1 / 4 floor-length position at the horizontal sides of the two middle floors and measuring the floor thickness h1 of the five mark points; 3) covering the five bench marks by a water absorption sponge for two hours and measuring the floor thickness h1 of the five mark points h2, and then calculating the floor thickness water absorption relative expansion degree, if one bench point is larger or equal to 3%, the floor of the batch is not qualified. The detection method simulates the water absorption expansion process of the composite floor to constitute the calculation method capable of more practically characterizing the relative water absorption expansion degree of the finished composite floor and the qualification criterion standard.
Owner:圣象实业(江苏)有限公司

Concrete bench mark monument for mounting displacement sensor and elevation observing and calculating method thereof

ActiveCN107063178AReduce the frequency of joint testingSolving elevation observation problemsHeight/levelling measurementPermanant marksBench markingStructural engineering
The invention discloses a concrete bench mark monument for mounting a displacement sensor and an elevation observing and calculating method thereof. The displacement sensor is arranged in the conventional concrete bench mark monument, and is connected with a drill hole anchoring end with a certain design depth through a connecting rod. When the concrete bench mark monument on the earth surface sinks, the sensor is driven to be deformed synchronously, readings of the sensor at each observing time interval are recorded through a portable reading instrument, sinking deformation of the bench mark monument relative to the anchoring end is calculated, and working starting point elevations of the bench mark monument at each observing time interval are calculated according to a connection surveying result obtained after connection surveying with a datum mark. By adopting the concrete bench mark monument, the problem of working starting point elevation observation of the bench mark monument at each observing time interval in a connection surveying period is solved, the working base point accuracy of the conventional concrete bench mark monument is increased, and working reference point and reference point connection surveying times of the bench mark monument are reduced; the concrete bench mark monument can be widely applied to settlement measurement work of engineering foundations, bases, upper structure and sites in industrial and civil buildings, municipal traffic, hydraulic engineering and the like.
Owner:CHINA WATER RESOURCES BEIFANG INVESTIGATION DESIGN & RES

Method for monitoring construction effect of foundation pit support piles below elevated high-speed railway line

ActiveCN108316364AFully play the role of monitoringPlay a monitoring roleFoundation testingBench markingGround settlement
The invention discloses a method for monitoring construction effect of foundation pit support piles below an elevated high-speed railway line. Through the method, the problem that the foundation pit monitoring criterion is not suitable for high-speed railway elevated foundation pit excavation monitoring in the prior art is solved. The method has the beneficial effect of being capable of guaranteeing safety operation of a high-speed railway elevated bridge. According to the scheme, the method for monitoring the construction effect of the foundation pit support piles below the elevated high-speed railway line comprises the following steps of (1) making monitoring plans, including layout schemes of bench marks, ground settlement monitoring points and deep soil displacement monitoring points,according to the support pile construction scheme and the situation that the support piles approach to an elevated high-speed railway foundation and conducting construction; (2) conducting monitoring;(3) analyzing monitoring data to judge the range and degree of the effect of the support pile construction process on displacement fields of soil bodies approaching to the support piles, determiningthe effect of the support pile construction process on the elevated high-speed railway foundation and then judging the effect of the support pile construction effect; and (4) giving an early warning on a construction party according to the effect, obtained by analyzing the monitoring data, of the support pile construction effect.
Owner:SHANDONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products