On-site monitoring and evaluation method for settlement of pile foundations
A technology of on-site monitoring and evaluation methods, applied in the direction of infrastructure engineering, infrastructure testing, construction, etc., can solve the problems of lack of timely monitoring on site, unfavorable proximity to buildings, and on-site monitoring and research on settlement of pile foundations, to overcome potential potential problems. dangerous effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] Take a station of Guangzhou Metro as an example:
[0024] A certain station of Guangzhou Metro is an interchange station for Line 5 and Line 8, with separate island platforms. The main tunnel of the station is excavated under Huanshi West Road. Connected by a cross channel. There is a viaduct on Huanshi West Road, and the bridge piles are densely covered. There are 9 sets of pile foundations within the station area. The investigation of the pile foundations is shown in Table 1.
[0025] Table 1 Pile Foundation Survey Form
[0026] Chainage
Pile length / m
Clear distance from the main tunnel / m
Clear distance from cross aisle / m
XJ25
45.0
7.34
10.42
XJ26
35.0
8.93
2.50
XJ27
35.0
7.97
28.44
XJ28
27.0
7.21
2.30
XJ29
29.0
7.18
28.46
XJ31
23.5
3.11
10.23
XJ32
23.0
2.38
6.66
[0027] Chainage
Pile length / m
Clear distance fr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com