The invention discloses an easy compact
asphalt mixing material and temperature and
time control parameters in the preparation process of the easy compact
asphalt mixing material. The easy compact
asphalt mixing material comprises 100 parts of ore materials, 5.8 to 6.4 parts of modified asphalt, 0.2 to 0.3 parts of
polyester fibers and 0.3 parts of easy compact agents, wherein the ore materials comprise the following ingredients in weight proportioning: 50 percent to 60 percent of 8-11mm macadam, 10 percent to 15 percent of 5-8mm macadam, 25 percent to 35 percent of manufactured sand and 3 percent to 8 percent of limestone ore
powder. The ore materials are heated to 150 DEG C to 160 DEG C and is then subjected to dry stirring with
polyester fibers for 5 to 10s, the modified asphalt is heated to 165 DEG C to 175 DEG C, the easy compact agents start to be sprayed after the modified asphalt is sprayed for 3s, the total time for spraying the asphalt and the easy compact agents is controlled to be within 13s, the ore
powder is added after the wet stirring for 6s, the total time of the stirring and the mixing is not lower than 60s, the cylinder
discharge temperature is controlled to 135 to 155 DEG C, and the easy compact asphalt mixing material is obtained. The mixing material is easy to compact, the rutting resistance capability is high, the construction temperature is reduced to 30 to 50 DEG C,
heating energy sources are saved by about 22 percent, the emission of asphalt
smoke and
greenhouse gas such as CO2 is reduced, the effects of energy saving, emission reduction and environment protection are obvious, meanwhile, the construction quality is improved, the effective construction time is prolonged, and the
work period is shortened.