The invention discloses an open
caisson pressing sinking method construction method. The open
caisson pressing sinking method construction method comprises construction preparing work, foundation pitexcavating, sand
cushion layer and plain concrete
cushion layer manufacturing, foundation pit excavating, sand
cushion layer and plain concrete cushion layer manufacturing, open
caisson first joint, second joint and third joint manufacturing, open caisson first-time sinking, open caisson fourth joint and fifth joint manufacturing and open caisson second-time sinking. The water-
discharge-free sinking technology is adopted in an open caisson, the soil sampling manner is cooperation of air mud suction and divers, and pressing sinking method sinking and thixotropic mud resistance reduction sinkingassisting are adopted in the sinking assisting manner. Open caisson
underwater plain concrete bottom sealing, open caisson bottom plate manufacturing and pipeline
buttress, mud discharging well and
tail work construction are conducted. The pressing sinking method is adopted in the open caisson pressing sinking method construction method so that the open caisson posture can be conveniently controlled, the open caisson sinking precision is high, the
depth of penetration into a soil layer through an open caisson blade foot is larger through a counter force
system, the enough sinking coefficientis achieved, the open caisson sinking speed can be greatly increased, disturbance on an outer soil body is little, differential settlement, deformation,
cracking and other phenomena are not likely tohappen to structures, and in the sinking process, the phenomenon of humping cannot happen to a soil bin in a well grid.