Open caisson construction method based on thixotropic mud resistance reduction
A technology of thixotropic mud and construction methods, which can be applied to infrastructure engineering, caissons, buildings, etc., and can solve problems such as caisson inclination and sudden settlement, external soil disturbance, and poor stability of soil walls
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0052] Example 1, such as figure 1 , image 3 As shown, a caisson construction method based on thixotropic mud drag reduction includes the following steps:
[0053] (1) Construction preparation work, on-site layout of temporary structures, mechanical equipment and construction water and electricity lines according to the general layout plan; set up gantry piles around the caisson, and use lime powder to draw the well central axis and foundation pit outline, As the basis for caisson fabrication and sinking positioning; it should be noted that in order to meet the requirements of construction machinery and equipment and civilized construction, a construction access road is built in the construction enclosure. Ash three slag, then pave 20cm concrete; heavy-duty vehicles and crane driving area first lay 25cm thick fly ash three slag, and then lay 25cm concrete; the inner surface of concrete is Φ8@250 two-way reinforced mesh. Along the side of the caisson, a steel bar processing ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com