The invention discloses a high-sublevel
subdivision mining method of a moderately thick heavy-
pitch waste-rock-containing interlayer
phosphate orebody along a strike. The high-sublevel
subdivision mining method comprises four steps of exploiting, mining preparation,
cutting and
recovery, wherein a footwall intermediate-section main roadway is respectively arranged on a high sublevel along a top plate and a bottom plate of the orebody, and the intermediate-section main roadways of the top plate and the bottom plate are connected through a
communication channel at intervals of 100m, therefore reduced roadway
cutting construction, small development rate and simple process are achieved; after overall blasting of a stope is finished, a large amount of concentrated ore drawing is carried out, and the production efficiency is high;
tail sand is adhered and filled after space pillars are mined first, then rooms are evacuated, and the rooms are filled with waste rocks or
tail sand in a non-adhering way, thus
recovery rate is high; and the high-sublevel
subdivision mining method has little damage to the environment and capabilities of changing oredressing
tail sand and waste rocks generated in open-air production into valuables and reducing
geological disaster from happening. Due to the adoption of the high-sublevel subdivision mining method disclosed by the invention, ore
recovery rate can be increased, ore
dilution rate and emission of mine wastes are reduced, capacity of
slag disposal pit is relatively increased, expropriation of land is decreased, and mineral land harmony is promoted.