59 results about "Model building process" patented technology

The model building process involves setting up ways of collecting data, understanding and paying attention to what is important in the data to answer the questions you are asking, finding a statistical, mathematical or a simulation model to gain understanding and make predictions.

Blanc fixe cementitious rock soil-like material and method for making simulative rock from the blanc fixe cementitious rock soil-like material

The invention relates to a blanc fixe cementitious rock soil-like material and a method for making simulative rock from the blanc fixe cementitious rock soil-like material and belongs to the technical field of rock material simulation in a geomechanical model test. The blanc fixe cementitious rock soil-like material comprises blanc fixe as a aggregate, bentonite as an auxiliary material, and dilute glue composed of 107 glue and water. The method comprises the following steps of drawing a water-binder ratio-shearing strength f curve by the blanc fixe cementitious rock soil-like material, calculating wet density of different batches of the blanc fixe cementitious rock soil-like materials, and making a small test-piece from different batches of the blanc fixe cementitious rock soil-like materials. The blanc fixe cementitious rock soil-like material has a low cost and no toxicity, can be processed into small blocks easily, and can satisfy requirements of a geomechanical model test on the blanc fixe cementitious rock soil-like material. Simulative rock made from the blanc fixe cementitious rock soil-like material does not influence a model building process and can be made fast so that a model test rate is greatly improved. The blanc fixe cementitious rock soil-like material is suitable for the field of a test on a model built by laying small blocks.
Owner:TSINGHUA UNIV

Automated machine learning systems and methods

PendingUS20210027182A1Decreasing overall cost functionLow costMathematical modelsEnsemble learningAlgorithmEngineering
A series of algorithms can be applied to an automated machine learning model building process in order to reduce complexity and improve model performance. In addition, the settings and parameters for implementing the automated machine learning model building process can be tuned to improve performance of future models. The model building process can also be monitored to ensure that the current build is based on new information compared to previously builds.
Owner:VISA INT SERVICE ASSOC

Fast measuring method of tobacco shred mixing ratio

The invention discloses a fast measuring method of tobacco shred mixing ratio, which takes a light absorbency value corresponding to a 5500 to 4200cm near-infrared spectrum of a diffuse reflection near-infrared spectrogram of finished tobacco shred samples to be measured, a diffuse reflection near-infrared spectrogram of leaf-silk samples to be measured, a diffuse reflection near-infrared spectrogram of cut stem samples to be measured and a diffuse reflection near-infrared spectrogram of slice silk samples to be measured as an independent variable matrix; the maxing ratio of leaf silks, cut stems and slice silks used for producing the finished tobacco shreds forms a dependent variable matrix; and a multivariate curve resolution-alternating least square method is used for calculating the matrix in the third step, thus obtaining the actual mixing ratio of the leaf silks, the cut stems and the slice silks in the tobacco shred samples to be measured. The method overcomes the defects of relatively complicated model building process, relatively small model application range, large work load and the like existing in the prior art, is a method that uses less measuring instruments, has simple process and can realize fast onsite measurement, and can be widely applied to the tobacco industry.
Owner:CHONGQING CHINA TOBACCO IND CO LTD +1

Multi-core shield power cable frequency change multi-conductor transmission line model building method

A multi-core shield power cable frequency change multi-conductor transmission line model building method comprises the following steps: measuring a common mode impedance and a differential mode impedance of a multi-core shield power cable; building an equivalent circuit model of the common mode impedance and differential mode impedance; indirectly deriving multi-core shield power cable multi-conductor transmission line frequency change unit length electric parameters; respectively reversing resistance, inductance, capacitance and conductance rational function approximation by polynomial in a pole-residual mode, wherein the system in a stable system; respectively processing when the stable system is connected with a passive network and an active network, thus realizing passivation of elements in a unit length frequency change electric parameter wideband equivalent circuit. The method considers structural asymmetry influences on electric parameter frequency change features in the multi-conductor transmission line model, can effectively isolate surrounding electromagnetic interferences from affecting the impedance measuring result, thus improving the measuring precision; the method is suitable for the frequency change multi-conductor transmission line model building process of the power cable, a communication cable and a split cable models with a simple structure.
Owner:XI AN JIAOTONG UNIV +1

Unsupervised entity relationship extraction method based on zero-shot

The invention discloses an unsupervised entity relationship extraction method based on zero-shot, and belongs to the field of computers. An entity relationship category is judged by extracting triplefeatures in text data and entity relationship type features in a domain knowledge graph and calculating the similarity between the triple features and the entity relationship type features, so that the dependence of a traditional entity relationship extraction method on manual annotation is reduced, and the accuracy of entity relationship extraction is improved. The method comprises the steps of data preprocessing, feature extraction, relation extraction network model training and entity relation classifier training. A convolutional neural network model which is good at capturing sentence information is adopted to respectively extract triple and relationship type features, and finally softmax is used to predict entity relationship type tags. In a model construction process, a sparse taggedcorpus can be used as a training set, and in a test process, the same parameters as those in the training process can also be used for predicting the type of an untagged triad.
Owner:BEIJING UNIV OF TECH

Pedestrian detection method based on weighted part model and selective search segmentation

The invention discloses a pedestrian detection method based on a weighted part model and selectiv search segmentation. The pedestrian detection method based on weighted part model consists of a weighted part model training part and a pedestrian human face detection part. A model construction process comprises steps of setting various weights on various parts on the basis of the construction process of a transformable part model and according to the different conditions of shielding parts of the pedestrian in a crowded scene, and utilizing a hidden support vector machine to perform training weight. The pedestrian detection process comprises steps of extracting HOG characteristic pyramid from an image, performing selective search and segmentation on the image in order to achieve the fact of employing less effective windows to contain more objects, and, on the basis of that, and adopting cascading detection based on threshold cutting to detect the pedestrian. The invention solves the problem of missing detection in a crowding scnene from two aspects, and reduces the invention and improves the pedestrian detection accuracy.
Owner:河北燕大燕软信息系统有限公司

Construction engineering project progress prediction system and method based on deep learning

The invention discloses a construction engineering project progress prediction system and method based on deep learning, which belong to the field of the construction industry. A model building process comprises the steps of extracting historical data; performing data cleaning, correction, supplement and regularization processing on the historical data to obtain to-be-trained data; constructing aninitial prediction model and carrying out training; verifying the model according to the special data, and outputting the initial prediction model passing the verification as a progress prediction model; the progress prediction process comprises the steps of obtaining current actual project information and inputting the current actual project information into the progress prediction model, and predicting predicted project progress information associated with the actual project information. The method has the beneficial effects that a set of progress prediction method suitable for different subdivision fields and scenes is established, historical data are preprocessed and processed through a deep learning algorithm, meanwhile, a special scene is simulated emphatically, a corresponding prediction result is output as the special scene needing to be considered in progress prediction, and an early warning prompt can be given.
Owner:杭州新中大科技股份有限公司

Convolutional neural network (CNN) based rain measurement identification of marine radar

ActiveCN110568441AGood convergence and stable stateNeural architecturesNeural learning methodsBatch trainingNetwork model
The invention provides a CNN based rain measurement identification of a marine radar. The method comprises a model building process, a model optimization process and a model training process. The method is based on a classical LeNet-5 CNN model. A multi-level residual CNN model is established, a training set is established by using samples of light rain, medium rain and heavy rain, and input intothe multi-level residual CNN to train the network model, the loss rate is calculated by using a cross entropy loss function, the minimum loss is obtained rapidly, and achieving a very good convergencestable state by using a batch training mode.
Owner:DALIAN MARITIME UNIVERSITY

Energy system optimization method based on comprehensive hub integrated energy model

InactiveCN103793766AImprove analysis and decision-making abilityComprehensive Analysis ModelForecastingSystems intergating technologiesEnergy system optimizationProcess engineering
The invention relates to an energy system optimization method based on a comprehensive hub integrated energy model. The method comprises the steps that firstly, comprehensive hubs and connecting relations between the comprehensive hubs and a transmission system are acquired, the integrated energy model is built, then an object function is set according to actual needs, an energy system is optimized according to the object function and the integrated energy model, and optimal input and output of all energy carrier subsystems are obtained under the condition of meeting the object function. Compared with the prior art, the comprehensive hubs are used as basis units for building the model by the built integrated energy model, the model is modularized obviously, and the model building process is simple and flexible.
Owner:TONGJI UNIV

Foundation pit excavation and anti-floating anchor rod construction method based on BIM

The foundation pit excavation and anti-floating anchor rod construction method based on BIM comprises the following steps: 1, an excavation model is built through BIM software; 2, in the excavation model building process, the BIM software is used for extracting the volumes of excavation models before and after hollow shearing, and the difference value of the volumes of the excavation models beforeand after hollow shearing is the excavated earthwork amount; 3, elevation data of the anti-floating anchor rod is summarized; a pre-designed anti-floating anchor rod plane positioning graph is introduced into the BIM software, the anti-floating anchor rod plane positioning graph correspondingly overlaps with the excavation model, the position of the anti-floating anchor rod on the excavation model is determined, elevation marking on the anti-floating anchor rod is performed by the BIM software, and the elevation marking data is summarized and integrated into an EXCLE table; 4, after elevationmarking of the anti-floating anchor rod is completed, a CAD two-dimensional graph and a three-dimensional visualization model graph of the foundation pit model are generated in a segmented mode so asto guide construction; and 5, on-site construction is carried out. The construction quality and the construction period are greatly improved, the rough management mode of the site is changed, and standardized and refined construction is achieved.
Owner:THE THIRD CONSTR OF CHINA CONSTR FIRST GROUP +1

Rapid modeling risk pre-assessment method for shield to pass through dense building group

ActiveCN112906111AReduce time spent on security calculationsExact Numeric Calculation ResultsGeometric CADDesign optimisation/simulationElement analysisStructural engineering
The invention belongs to the technical field of subway shields, and particularly relates to a rapid modeling risk pre-assessment method for a shield to pass through a dense building group. According to the evaluation method, based on limited element analysis software ABAQUS and three-dimensional modeling software GIS, the influence of tunnel excavation of an earth pressure balance shield tunneling machine on a surface building is simulated, and a shield tunneling construction scheme and a building reinforcement scheme are formulated by judging a risk level through a preset evaluation standard. According to the invention, the metrology and the three-dimensional modeling technology are combined, so that in the model building process, the earth surface structure meeting the precision requirement is rapidly built, and the time spent on safety calculation of a traditional building is greatly shortened. According to the invention, detailed risk level judgment standards are provided, preliminary construction scheme optimization ideas such as shield parameter adjustment or foundation reinforcement are provided for designers for different risk levels, and the designers are assisted in formulating and optimizing the construction scheme.
Owner:SOUTHEAST UNIV
Who we serve
  • R&D Engineer