The invention discloses a roadway full-fracture-surface anchoring-rod and anchoring-
rope integrated parallel installation method and device. Full-fracture-surface parallel installation between anchoring rods and anchoring ropes, between the anchoring rods and between the anchoring ropes in a roadway is achieved, and the roadway supporting problem which limits the roadway tunneling speed is solved. The roadway full-fracture-surface anchoring-rod and anchoring-
rope integrated parallel installation method is characterized by including the steps that according to the specific positions of the anchoring rods and the anchoring ropes in the roadway supporting design, one drilling
machine is arranged corresponding to one anchoring rod and one anchoring
rope, all the
drilling machines are fixed on a movable frame, the movable frame is forwards moved after one anchoring distance is tunneled through a tunneling
machine, it is achieved that all the anchoring-rod and anchoring-rope
drilling machines of a full fracture surface of the roadway are in position at the same time and drilling is carried out at the same time, and the anchoring rods and the anchoring ropes are installed in parallel. The roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation device comprises a fixing frame,
joist jacks, the anchoring-rod and anchoring-rope
drilling machines, a pulling moving device, a goods shelf, a
scaffold ladder, a
scaffold platform, a hydraulic concentration control console and the like, wherein the
joist jacks are fixed to the two sides of the front end of the fixing frame, the anchoring-rod and anchoring-rope drilling machines are fixed on transverse beams or stand columns of the fixing frame, the pulling moving device is fixed to the front end of the fixing frame, the goods shelf is located in the middle of the fixing frame and used for containing anchoring-rod and anchoring-rope accessories, and the hydraulic concentration control console is installed on one side of the fixing frame.