The invention discloses a prestressed
anchor bolt tensioning construction process. The construction process includes the following steps: drilling-corrugated
pipe leveling-grouting-anchor installation; step 1: drilling, using an electric
drill to open a foundation on the side of the road hole, the foundation hole is perpendicular to the
road surface, put the lower anchor pad at the bottom of the foundation hole, and insert the
bellows into the inside of the foundation hole, the bottom of the
bellows is threaded with the lower anchor pad; step 2: leveling the
bellows, Use the
leveling mechanism to fix the upper part of the bellows, and the
leveling mechanism uses the limit plate to fix and limit the bellows until the bellows is perpendicular to the
road surface, pour concrete
slurry into the foundation hole, and the concrete
slurry is self-modulated to the bottom of the tank hole The duration is within 30 minutes. By adding a leveling step in the installation process of the corrugated
pipe and the foundation hole, the corrugated
pipe is leveled before pouring concrete
slurry into the foundation hole, so that the corrugated pipe can be fixed vertically to the
road surface, and the fixing process is more firm and less prone to damage. The slurry shakes after
extrusion.